<html><body><span style="font-family:Verdana; color:#000000; font-size:10pt;"><div>Umm, anyone? anyone?<br></div><div><br></div><div><br>Dan Brown<br>Foxfire Energy Corp.<br>Renewable Energy Systems<br>(802)-483-2564<br><a href="http://www.Foxfire-Energy.com">www.Foxfire-Energy.com</a><br>NABCEP #092907-44</div><div></div><div><br><br></div>
<blockquote id="replyBlockquote" webmail="1" style="border-left: 2px solid blue; margin-left: 8px; padding-left: 8px; font-size:10pt; color:black; font-family:verdana;">
<div id="wmQuoteWrapper">
-------- Original Message --------<br>
Subject: Re: [RE-wrenches] OutBack Power MATE3 to MATE3S Upgrade<br>
From: "Dave Angelini Offgrid Solar" &lt;<a href="mailto:offgridsolar@sti.net">offgridsolar@sti.net</a>&gt;<br>
Date: Thu, September 21, 2017 10:49 am<br>
To: "RE-wrenches" &lt;<a href="mailto:re-wrenches@lists.re-wrenches.org">re-wrenches@lists.re-wrenches.org</a>&gt;<br>
<br>
One of the reasons I like GFP is that it can save a system by shutting<br>
down during lightning. I have seen it happen a few times with Schneider<br>
offgrid. The other thing is there should be an SPD on the DC buss, the AC<br>
buss, and at the array. Once you have been hit it is too late and the new<br>
system may be next. I am not saying this is your problem, but, I am not<br>
saying it isn't. Offgrid is so reliable because there is none of the grid<br>
surges on the the equipment. Lightning is the big variable (and how close<br>
it was) and if there is a human in the home, they should shut anything<br>
from the outside down when it is near. I tell them to keep a copy of the<br>
check for the system and post it near the disco. If it is a known<br>
lightning prone area they/you will have to do more!  Good luck<br>
<br>
<br>
Dave Angelini Offgrid Solar<br>
"we go where powerlines don't"<br>
<a href="http://members.sti.net/offgridsolar">http://members.sti.net/offgridsolar</a>/<br>
e-mail  <a href="mailto:offgridsolar@sti.net">offgridsolar@sti.net</a><br>
text 209 813 0060<br>
<br>
<br>
Dave dan@foxfire-energy.comDave<br>
&gt; &lt;html&gt;&lt;body&gt;&lt;span style="font-family:Verdana; color:#000000;<br>
&gt; font-size:10pt;"&gt;&lt;div&gt;The system (Off Grid) was originally installed in<br>
&gt; 2006 in a high end 2nd home in the wilds of Northern Vt. This spring the<br>
&gt; system took a lightening strike and was replaced with 4 FXR inverters and<br>
&gt; a Mate3s. The owners later chose to set up Optics RE and to install a<br>
&gt; FN-DC. The replacement system was originally programed with the 1st Mate3s<br>
&gt; and was fully operational both locally and on OpticsRE. After the FN-DC<br>
&gt; was installed (as outlined in the manual), we noticed we had some system<br>
&gt; info and some menus, but no control at the Mate (the screen would twitch<br>
&gt; after entering a command request, but returned to the previous menu).. The<br>
&gt; first OB tech suggested verifying basic connections and power cycling<br>
&gt; (which I had already done, but figured I'd humor him anyway), but that<br>
&gt; meant loosing comm (Satellite).. The next tech asked to be taken off<br>
&gt; speaker phone and suggested I was at fault because there was no GFP on the<br>
&gt; charge controller (although there is no mention of GFP in the FN-DC<br>
&gt; manual), and because I did not fully power down and wait 10 min. before<br>
&gt; connecting the cat5 / hub 10.3 etc. and thus voided all warranties.. He<br>
&gt; also suggested I try to communicate with the FXRs w/ Mate3 individually to<br>
&gt; determine the extent of the damage.. Still no control. The next tech<br>
&gt; instructed us to reconnect all components (Live - said everything is plug<br>
&gt; and play), which again did allow control from OpticsRE but not the Mate.<br>
&gt; We made a few adjustments but the tech said it was definitely a bad Mate3s<br>
&gt; and that there was a known glitch between the Mate3s and FN-DC (at least<br>
&gt; that's what I interpreted), and issued an RMA.. but also said the Mate3s<br>
&gt; was undergoing revision and would not be available till early Oct.. So not<br>
&gt; to expect shipment till then.. Two days later I received a replacement<br>
&gt; Mate3s from my supplier here at the shop (although I requested that the<br>
&gt; new Mate be shipped directly to my customer). I told my supplier what the<br>
&gt; 3rd tech told me.. They called back and said their contact at OB told them<br>
&gt; this Mate3s should be fine. I have not installed this replacement till I<br>
&gt; do a little more research, but plan a trip up there next week (3.5 hrs<br>
&gt; away).&lt;/div&gt;&lt;div&gt;&lt;br&gt;&lt;/div&gt;&lt;div&gt;If you have insight, please<br>
&gt; share.&lt;/div&gt;&lt;div&gt;&lt;br&gt;&lt;/div&gt;&lt;div&gt;Hope this<br>
&gt; helps.&lt;/div&gt;&lt;div&gt;&lt;br&gt;&lt;/div&gt;&lt;div&gt;db&lt;br&gt;&lt;/div&gt;&lt;div&gt;&lt;br&gt;&lt;/div&gt;&lt;div&gt;&lt;br&gt;Dan<br>
&gt; Brown&lt;br&gt;Foxfire Energy Corp.&lt;br&gt;Renewable Energy<br>
&gt; Systems&lt;br&gt;(802)-483-2564&lt;br&gt;<a<br>
&gt; href="http://www.Foxfire-Energy.com"&gt;www.Foxfire-Energy.com&lt;br&gt;NABCEP<br>
&gt; #092907-44&lt;/div&gt;&lt;div&gt;&lt;/div&gt;&lt;div&gt;&lt;br&gt;&lt;br&gt;&lt;/div&gt;<br>
&gt; &lt;blockquote id="replyBlockquote" webmail="1" style="border-left: 2px solid<br>
&gt; blue; margin-left: 8px; padding-left: 8px; font-size:10pt; color:black;<br>
&gt; font-family:verdana;"&gt;<br>
&gt; &lt;div id="wmQuoteWrapper"&gt;<br>
&gt; -------- Original Message --------&lt;br&gt;<br>
&gt; Subject: Re: [RE-wrenches] OutBack Power MATE3 to MATE3S Upgrade&lt;br&gt;<br>
&gt; From: Jay &amp;lt;<a<br>
&gt; href="mailto:jay.peltz@gmail.com"&gt;jay.peltz@gmail.com&amp;gt;&lt;br&gt;<br>
&gt; Date: Wed, September 20, 2017 10:09 am&lt;br&gt;<br>
&gt; To: RE-wrenches &amp;lt;<a<br>
&gt; href="mailto:re-wrenches@lists.re-wrenches.org"&gt;re-wrenches@lists.re-wrenches.org&amp;gt;&lt;br&gt;<br>
&gt; &lt;br&gt;<br>
&gt; &lt;div&gt;&lt;/div&gt;&lt;div&gt;Can you be more specific about the fndc interface<br>
&gt; issues.&amp;nbsp;&lt;/div&gt;&lt;div&gt;What wasn't working and the fix is new M3s<br>
&gt; firmware yet to be<br>
&gt; released?&lt;/div&gt;&lt;div&gt;&lt;br&gt;&lt;/div&gt;&lt;div&gt;Thx&lt;/div&gt;&lt;div&gt;Jay&lt;/div&gt;&lt;div&gt;&lt;br&gt;On Sep<br>
&gt; 20, 2017, at 4:10 AM, &amp;lt;<a target="_blank" <br="">
&gt; href="mailto:dan@foxfire-energy.com"&gt;dan@foxfire-energy.com</a>&amp;gt; &amp;lt;<a<br>
&gt; target="_blank"<br>
&gt; href="mailto:dan@foxfire-energy.com"&gt;dan@foxfire-energy.com&amp;gt;<br>
&gt; wrote:&lt;br&gt;&lt;br&gt;&lt;/div&gt;&lt;blockquote type="cite" style="border-left: blue 2px<br>
&gt; solid; margin-left: 8px; padding-left: 8px;"&gt;&lt;div&gt;&lt;span<br>
&gt; style="font-family:Verdana; color:#000000; font-size:10pt;"&gt;&lt;div&gt;Seems<br>
&gt; earlier versions of the 3s had a glitch that didn't play nice with FN-DC..<br>
&gt; OB tech said a new version wasn't available till early Oct.. Still had<br>
&gt; control from Optics RE but no local control..<br>
&gt; &lt;/div&gt;&lt;div&gt;&lt;br&gt;&lt;/div&gt;&lt;div&gt;Good<br>
&gt; Luck&lt;/div&gt;&lt;div&gt;&lt;br&gt;&lt;/div&gt;&lt;div&gt;db&lt;br&gt;&lt;/div&gt;&lt;div&gt;&lt;br&gt;&lt;/div&gt;&lt;div&gt;&lt;br&gt;Dan<br>
&gt; Brown&lt;br&gt;Foxfire Energy Corp.&lt;br&gt;Renewable Energy<br>
&gt; Systems&lt;br&gt;(802)-483-2564&lt;br&gt;<a target="_blank" <br="">
&gt; href="http://www.Foxfire-Energy.com"&gt;www.Foxfire-Energy.com</a>&lt;br&gt;NABCEP<br>
&gt; #092907-44&lt;/div&gt;&lt;div&gt;&lt;/div&gt;&lt;div&gt;&lt;br&gt;&lt;br&gt;&lt;/div&gt; &lt;blockquote<br>
&gt; id="replyBlockquote" webmail="1" style="border-left: 2px solid blue;<br>
&gt; margin-left: 8px; padding-left: 8px; font-size:10pt; color:black;<br>
&gt; font-family:verdana;"&gt; &lt;div id="wmQuoteWrapper"&gt; -------- Original Message<br>
&gt; --------&lt;br&gt; Subject: [RE-wrenches] OutBack Power MATE3 to MATE3S<br>
&gt; Upgrade&lt;br&gt; From: Matthew Sirum &amp;lt;<a target="_blank" <br="">
&gt; href="mailto:matthewsirum@gmail.com"&gt;matthewsirum@gmail.com</a>&amp;gt;&lt;br&gt;<br>
&gt; Date: Wed, September 20, 2017 6:12 am&lt;br&gt; To: re-wrenches &amp;lt;<a<br>
&gt; target="_blank"<br>
&gt; href="mailto:re-wrenches@lists.re-wrenches.org"&gt;re-wrenches@lists.re-wrenches.org&amp;gt;&lt;br&gt;<br>
&gt; &lt;br&gt; Greetings All,&lt;br&gt; &lt;br&gt; I'm preparing to replace an existing OutBack<br>
&gt; Power MATE3 System&lt;br&gt; Display/Controller with the new MATE3S. The system<br>
&gt; is a grid tied 5&lt;br&gt; stack of Radian GS8048A Inverter/Chargers. I am<br>
&gt; interested to know if&lt;br&gt; any of you may have done this and if you<br>
&gt; encountered any issues or&lt;br&gt; have any insights to pass along. This system<br>
&gt; does have a generator&lt;br&gt; and uses the Advanced Generator Start (AGS)<br>
&gt; function to control&lt;br&gt; generator start/stop and battery charging while<br>
&gt; the generator is&lt;br&gt; running. I believe this is the only<br>
&gt; Display/Controller based function&lt;br&gt; the system is using, so it will<br>
&gt; likely need to be programed and setup&lt;br&gt; in the new MATE3S. I am hopeful<br>
&gt; that all other programing is stored&lt;br&gt; in the Radians and will not need<br>
&gt; to be reprogramed/entered to the new&lt;br&gt; MATE3S. The system is connected<br>
&gt; to OpticsRE (OutBack Power's system&lt;br&gt; monitoring website/service). I<br>
&gt; assume we may need to do some&lt;br&gt; programing from the new MATE3S and/or<br>
&gt; from the system's OpticsRE site&lt;br&gt; to enable communication since the new<br>
&gt; MATE3S may have a different IP&lt;br&gt; address, MAC Address, and etc than the<br>
&gt; MATE3 we are removing.&lt;br&gt; &lt;br&gt; We are hopeful the new MATE3S will allow<br>
&gt; the system to function better&lt;br&gt; with its OpticsRE site and not need to<br>
&gt; be reset every couple months.&lt;br&gt; &lt;br&gt; Please let me know if you have any<br>
&gt; experience or thoughts to offer.&lt;br&gt; &lt;br&gt; Have any of you installed and<br>
&gt; setup the new MATE3S? Any Issues,&lt;br&gt; insights, or comparisons to the<br>
&gt; MATE3 to report?&lt;br&gt; &lt;br&gt; Thank you!&lt;br&gt; &lt;br&gt; Best regards,&lt;br&gt; &lt;br&gt;<br>
&gt; ----MATT&lt;br&gt; &lt;br&gt; Matthew Sirum&lt;br&gt; P.O. Box 1227&lt;br&gt; Greenfield, MA<br>
&gt; 01302-1227 USA&lt;br&gt; phone: +1.413.773.0611&lt;br&gt; email: <a target="_blank" <br="">
&gt; href="mailto:MatthewSirum@gmail.com"&gt;MatthewSirum@gmail.com</a>&lt;br&gt;<br>
&gt; _______________________________________________&lt;br&gt; List sponsored by<br>
&gt; Redwood Alliance&lt;br&gt; &lt;br&gt; List Address: <a target="_blank" <br="">
&gt; href="mailto:RE-wrenches@lists.re-wrenches.org"&gt;RE-wrenches@lists.re-wrenches.org</a>&lt;br&gt;<br>
&gt; &lt;br&gt; Change listserver email address &amp;amp; settings:&lt;br&gt; <a<br>
&gt; target="_blank"<br>
&gt; href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org"&gt;http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org&lt;br&gt;<br>
&gt; &lt;br&gt; List-Archive: <a target="_blank" <br="">
&gt; href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html"&gt;http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a>&lt;br&gt;<br>
&gt; &lt;br&gt; List rules &amp;amp; etiquette:&lt;br&gt; <a target="_blank" <br="">
&gt; href="http://www.re-wrenches.org/etiquette.htm"&gt;www.re-wrenches.org/etiquette.htm</a>&lt;br&gt;<br>
&gt; &lt;br&gt; Check out or update participant bios:&lt;br&gt; <a target="_blank" <br="">
&gt; href="http://www.members.re-wrenches.org"&gt;www.members.re-wrenches.org</a>&lt;br&gt;<br>
&gt; &lt;br&gt; &lt;/div&gt; &lt;/blockquote&gt;&lt;/span&gt; &lt;/div&gt;&lt;/blockquote&gt;&lt;blockquote<br>
&gt; type="cite" style="border-left: blue 2px solid; margin-left: 8px;<br>
&gt; padding-left:<br>
&gt; 8px;"&gt;&lt;div&gt;&lt;span&gt;_______________________________________________&lt;/span&gt;&lt;br&gt;&lt;span&gt;List<br>
&gt; s&lt;/span&gt;&lt;br&gt;&lt;span&gt;&lt;/span&gt;&lt;br&gt;&lt;/div&gt;&lt;/blockquote&gt;&lt;hr&gt;_______________________________________________&lt;br&gt;<br>
&gt; List sponsored by Redwood Alliance&lt;br&gt;<br>
&gt; &lt;br&gt;<br>
&gt; List Address: <a<br>
&gt; href="mailto:RE-wrenches@lists.re-wrenches.org"&gt;RE-wrenches@lists.re-wrenches.org&lt;br&gt;<br>
&gt; &lt;br&gt;<br>
&gt; Change listserver email address &amp;amp; settings:&lt;br&gt;<br>
&gt; <a<br>
&gt; href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org"&gt;http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org&lt;br&gt;<br>
&gt; &lt;br&gt;<br>
&gt; List-Archive: <a<br>
&gt; href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html"&gt;http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html&lt;br&gt;<br>
&gt; &lt;br&gt;<br>
&gt; List rules &amp;amp; etiquette:&lt;br&gt;<br>
&gt; <a<br>
&gt; href="http://www.re-wrenches.org/etiquette.htm"&gt;www.re-wrenches.org/etiquette.htm&lt;br&gt;<br>
&gt; &lt;br&gt;<br>
&gt; Check out or update participant bios:&lt;br&gt;<br>
&gt; <a<br>
&gt; href="http://www.members.re-wrenches.org"&gt;www.members.re-wrenches.org&lt;br&gt;<br>
&gt; &lt;br&gt;<br>
&gt;<br>
&gt; &lt;/div&gt;<br>
&gt; &lt;/blockquote&gt;&lt;/span&gt;&lt;/body&gt;&lt;/html&gt;<br>
&gt; _______________________________________________<br>
&gt; List sponsored by Redwood Alliance<br>
&gt;<br>
&gt; List Address: RE-wrenches@lists.re-wrenches.org<br>
&gt;<br>
&gt; Change listserver email address &amp; settings:<br>
&gt; <a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br>
&gt;<br>
&gt; List-Archive:<br>
&gt; <a href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html">http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a><br>
&gt;<br>
&gt; List rules &amp; etiquette:<br>
&gt; <a href="http://www.re-wrenches.org/etiquette.htm">www.re-wrenches.org/etiquette.htm</a><br>
&gt;<br>
&gt; Check out or update participant bios:<br>
&gt; <a href="http://www.members.re-wrenches.org">www.members.re-wrenches.org</a><br>
&gt;<br>
&gt;<br>
<br>
<br>
Dave Angelini Offgrid Solar<br>
"we go where powerlines don't"<br>
<a href="http://members.sti.net/offgridsolar">http://members.sti.net/offgridsolar</a>/<br>
e-mail  <a href="mailto:offgridsolar@sti.net">offgridsolar@sti.net</a><br>
text 209 813 0060<br>
<br>
_______________________________________________<br>
List sponsored by Redwood Alliance<br>
<br>
List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a><br>
<br>
Change listserver email address &amp; settings:<br>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br>
<br>
List-Archive: <a href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html">http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a><br>
<br>
List rules &amp; etiquette:<br>
<a href="http://www.re-wrenches.org/etiquette.htm">www.re-wrenches.org/etiquette.htm</a><br>
<br>
Check out or update participant bios:<br>
<a href="http://www.members.re-wrenches.org">www.members.re-wrenches.org</a><br>
<br>

</a<br></a<br></a<br></a<br></a<br></a<br></a<br></a<br></a<br></a<br></a<br></div>
</blockquote></span></body></html>