<DIV>Wrenches,</DIV>
<DIV>&nbsp;</DIV>
<DIV>&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp; Customer currently has a hacked up 
200 amp Sylvania meter/mains panel.&nbsp; He also is averaging a load of 74 
KWhrs/day! which will require about 15&nbsp; KW system size at this site.&nbsp; 
Obviously a system this size cannot backfeed the busses in the load 
center.&nbsp; Because the exiting panel is a mess anyway, I'm suggesting it gets 
changed out.</DIV>
<DIV>&nbsp;</DIV>
<DIV>&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp; What sort of new 200 amp&nbsp;service 
would facilitate a clean supply side connection.&nbsp; One thought is have 
separate Utility meter socket then a 12 X 12 J-box with a monster power 
distribution block in it and then a distribution panel (without the meter 
socket)...this being a way to insert a means to&nbsp;grid-tie between the meter 
and the 200 amp main breaker.&nbsp; A little spendy but nothing like going to 
higher amp service to be able to load side connect.</DIV>
<DIV>&nbsp;</DIV>
<DIV>&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp; A&nbsp;400 amp panel is not an option 
as the existing 165' of 3" pvc underground conduit to the pole currently has 4/0 
alum.&nbsp; The utility says it would have to be 4" for the new cable and the 
cost $10K+ for the upgrade.</DIV>
<DIV>&nbsp;</DIV>
<DIV>&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp; Other ideas??</DIV>