<html><head><meta http-equiv="Content-Type" content="text/html; charset=utf-8"></head><body><div><div style="font-family: Calibri,sans-serif; font-size: 11pt;">Here in NY, we are still on the 2008 code cycle.<br><br>Sincerely,<br>Glenn Burt<br>Sent from my 'smart' phone so please excuse grammar and typos.</div></div><div dir="ltr"><hr><span style="font-family: Calibri,sans-serif; font-size: 11pt; font-weight: bold;">From: </span><span style="font-family: Calibri,sans-serif; font-size: 11pt;"><a href="mailto:brian@solarenergy.org">Brian Mehalic</a></span><br><span style="font-family: Calibri,sans-serif; font-size: 11pt; font-weight: bold;">Sent: </span><span style="font-family: Calibri,sans-serif; font-size: 11pt;">\u200e3/\u200e22/\u200e2015 17:58</span><br><span style="font-family: Calibri,sans-serif; font-size: 11pt; font-weight: bold;">To: </span><span style="font-family: Calibri,sans-serif; font-size: 11pt;"><a href="mailto:re-wrenches@lists.re-wrenches.org">RE-wrenches</a></span><br><span style="font-family: Calibri,sans-serif; font-size: 11pt; font-weight: bold;">Subject: </span><span style="font-family: Calibri,sans-serif; font-size: 11pt;">Re: [RE-wrenches] TL Code Reference</span><br><br></div><div dir="ltr">In the 2014 NEC, 690.35(B) states that overcurrent protection for ungrounded PV power systems must be installed in accordance with 690.9. &nbsp;690.9(E) states that an overcurrent protection device must be installed on each ungrounded conductor, i.e. both the positive and negative in ungrounded PV power sources.&nbsp;<div><br></div><div>Also note 240.15, which also requires overcurrent protection in series with all ungrounded conductors.</div><div><br></div><div>Cheers,</div></div><div class="gmail_extra"><br clear="all"><div><div class="gmail_signature"><div dir="ltr"><div><br></div><div>Brian Mehalic <br>NABCEP Certified Solar PV Installation Professional\u2122&nbsp;R031508-59<div><br></div><div><div>PV Curriculum Developer and Instructor<div>Solar Energy International<br><a href="http://www.solarenergy.org" target="_blank">http://www.solarenergy.org</a></div></div></div></div></div></div></div>
<br><div class="gmail_quote">On Sun, Mar 22, 2015 at 11:28 AM, AE Solar <span dir="ltr">&lt;<a href="mailto:autonomousenergies@gmail.com" target="_blank">autonomousenergies@gmail.com</a>&gt;</span> wrote:<br><blockquote class="gmail_quote" style="margin: 0px 0px 0px 0.8ex; padding-left: 1ex; border-left-color: rgb(204, 204, 204); border-left-width: 1px; border-left-style: solid;"><div dir="ltr">Hey Wrenchers,<div>Can someone point me towards where the code references the need to disconnect both conductors in an install with transformerless/ungrounded inverters? Thanks</div><div>Adam</div><div><br clear="all"><div><div><div dir="ltr">Adam Katzman<br>Autonomous Energies<br>4872 State Route 9G <br>Germantown NY, 12526<br><a href="http://www.autonomousenergies.com" target="_blank">www.autonomousenergies.com</a><br><a href="tel:%28518%29%20567-1468" target="_blank" value="+15185671468">(518) 567-1468</a><br><br></div></div></div>
</div></div>
<br>_______________________________________________<br>
List sponsored by Redwood Alliance<br>
<br>
List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a><br>
<br>
Change listserver email address &amp; settings:<br>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" target="_blank">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br>
<br>
List-Archive: <a href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html" target="_blank">http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a><br>
<br>
List rules &amp; etiquette:<br>
<a href="http://www.re-wrenches.org/etiquette.htm" target="_blank">www.re-wrenches.org/etiquette.htm</a><br>
<br>
Check out or update participant bios:<br>
<a href="http://www.members.re-wrenches.org" target="_blank">www.members.re-wrenches.org</a><br>
<br>
<br></blockquote></div><br></div>
</body></html>