The main reason to want to have the Enlighten system is warranty. Try to
get a replacement inverter if Enphase can't monitor the system over the
Internet. <br><br>
<br>
At 10:01 PM 9/29/2014, you wrote:<br>
<blockquote type=cite class=cite cite="">All,<br>
&nbsp;<br>
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Great points and a little
education of others' feelings about, essentially how granular we need to
be in monitoring.&nbsp;&nbsp; <br>
&nbsp;<br>
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; I'm curious who is monitoring
the Enphase systems in the solar world, seriously.&nbsp; I know 95% of my
customers are more concerned about catching the bus or what's for dinner
than if PV #8 has bird crap on it.&nbsp; Do the folks at Enphase, through
Enlighten have some software that spots issues?&nbsp; I know I, as an
installer don't have time for it.&nbsp; My experience is the customer
notices their power bill was higher last month, they take a look at the
inverter and no green light...CALL BILL.<br>
&nbsp;<br>
&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Thanks folks for the resources
for meters, din rail too.<br>
&nbsp;<br>
Bill<br>
&nbsp;<br>
<img src="cid:7.1.0.9.0.20140930104059.05c197d8@redwoodalliance.org.2" width=306 height=103 alt="[]">
<br>

<dl>
<dd>----- Original Message ----- <br>

<dd>From:</b> <a href="mailto:glenn.burt@glbcc.com">Glenn Burt</a> <br>

<dd>To:</b>
<a href="mailto:re-wrenches@lists.re-wrenches.org">'RE-wrenches'</a>
<br>

<dd>Sent:</b> Monday, September 29, 2014 5:17 PM<br>

<dd>Subject:</b> Re: [RE-wrenches] Metering<br><br>

<dd>I would not classify what we are doing in PV as SCADA.<br>

<dd>&nbsp;<br>

<dd>It is purely data acquisition at this point, and more commonly
referred to as DAS or a Data Acquisition System.<br>

<dd>SCADA by its definition entails a two way path of both receiving data
and being able to send control signals, usually from a big picture
program, monitoring dozens of data points.<br>

<dd>Let\u2019s not try to make the simple into a more complex thing than it
is.<br>

<dd>&nbsp;<br>

<dd>-Glenn<br>

<dd>&nbsp;<br>

<dd>From:</b> RE-wrenches
[<a href="mailto:re-wrenches-bounces@lists.re-wrenches.org" eudora="autourl">
mailto:re-wrenches-bounces@lists.re-wrenches.org</a>] On Behalf Of
</b>Ray Walters<br>

<dd>Sent:</b> Monday, September 29, 2014 2:31 PM<br>

<dd>To:</b> RE-wrenches<br>

<dd>Subject:</b> Re: [RE-wrenches] Metering<br>

<dd>&nbsp;<br>

<dd>The 2nd problem with the Envoy besides cost is that it isn't always
reliable.&nbsp;&nbsp;&nbsp; Communication through power lines is not a
new or fresh idea, and has Always been problematic.&nbsp; Once you
install something you are expected to make it work, and that can be a
nightmare on say an 8 module system that keeps losing communication to
one or two modules.&nbsp; I've had this exact case, and confirmed
multiple times that each micro was working, but the Envoy had other
ideas.<br>

<dd>This rush to mega data acquisition makes sense for larger PPA
systems, but can just add tons of call backs and the resulting financial
losses and frustrations for small systems.<br>

<dd>I've spent as much time messing with SCADA, as I have with the entire
install itself; now that's ridiculous.&nbsp; This isn't new either:&nbsp;
I had&nbsp; SCADA systems back in the 90s, that had great promise, but
ultimately were extremely hard to implement, and the customer never used
after anyway......<br>

<dd>The question is: <br>

<dd>What does the customer really need to operate the system vs.
&quot;bells and whistles&quot;.....<br><br>
<br>

<dd><pre>R.Ray
Walters</pre><font face="Courier New, Courier"></font><br>

<dd><pre>CTO, Solarray,
Inc</pre><font face="Courier New, Courier"></font><br>

<dd><pre>Nabcep Certified PV Installer,
</pre><font face="Courier New, Courier"></font><br>

<dd><pre>Licensed Master
Electrician</pre><font face="Courier New, Courier"></font><br>

<dd><pre>Solar Design
Engineer</pre><font face="Courier New, Courier"></font><br>

<dd><pre>303 505-8760</pre><font face="Courier New, Courier"></font>
<dd>On 9/29/2014 12:12 PM, August Goers wrote:<br>

<dl>
<dd>Hi Bill,<br>

<dd>&nbsp;<br>

<dd>One of the largest benefits of the microinverter system, in my
opinion, is the ability to monitor each module individually. It might
seem like ~$500 is a lot for the Envoy but I think it is well worth it
when you think about the 25 year warranty period and included ongoing
monitoring. We\u2019ve had enough Enphase failures that I would personally
really want to be able to keep my eye on each micro individually.<br>

<dd>&nbsp;<br>

<dd>Just a thought, August<br>

<dd>&nbsp;<br>

<dd>From:</b> RE-wrenches
[<a href="mailto:re-wrenches-bounces@lists.re-wrenches.org" eudora="autourl">
mailto:re-wrenches-bounces@lists.re-wrenches.org</a>] On Behalf Of
</b>frenergy<br>

<dd>Sent:</b> Sunday, September 28, 2014 2:26 PM<br>

<dd>To:</b> RE-wrenches<br>

<dd>Subject:</b> [RE-wrenches] Metering<br>

<dd>&nbsp;<br>

<dd>CA wrenches,<br>

<dd>&nbsp;<br>

<dd>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; I'm trying to (for the
sake of my monetarily impaired customers) figure out a less expensive way
to meter/monitor small enphase systems.&nbsp; One of my local utilities
will allow me to just use a remanufactured utility-grade meter (ala AEE)
These meters are inexpensive, robust and accurate but only display total
production.&nbsp; <br>

<dd>&nbsp;<br>

<dd>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; The Envoy retails for over
$5 bills.&nbsp; Most of my customers are not interested in checking their
PV system on the internet, well not after a couple weeks.&nbsp; I can't
seem to find any requirement from PG&amp;E other than in Section 5.1 of
the guidebook: &quot; All systems receiving an EPBB incentive must
install a production meter accurate to +- 5% of actual system
output....&quot;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; which is pretty
vague.&nbsp; plus the is no CSI incentive&nbsp; anymore.<br>

<dd>&nbsp;<br>

<dd>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Anybody have a suggestion
that is different from the remanu utility meter?....and possibly gives
current wattage output, and is &quot;approved&quot; by PG&amp;E
interconnection?<br>

<dd>&nbsp;<br>

<dd>TIA<br>

<dd>&nbsp;<br>

<dd>Bill<br>

<dd>
<img src="cid:7.1.0.9.0.20140930104059.05c197d8@redwoodalliance.org.3" width=306 height=103 alt="[]">
<br><br>
<br><br>
<br>

<dd><pre>_______________________________________________</pre>
<font face="Courier New, Courier"></font><br>

<dd><pre>List sponsored by Redwood
Alliance</pre><font face="Courier New, Courier"></font><br>

<dd><pre>&nbsp;</pre><font face="Courier New, Courier"></font><br>

<dd><pre>List Address:
<a href="mailto:RE-wrenches@lists.re-wrenches.org">
RE-wrenches@lists.re-wrenches.org</a></pre>
<font face="Courier New, Courier"></font><br>

<dd><pre>&nbsp;</pre><font face="Courier New, Courier"></font><br>

<dd><pre>Change listserver email address &amp;
settings:</pre><font face="Courier New, Courier"></font><br>

<dd><pre>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org">
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a>
</pre><font face="Courier New, Courier"></font><br>

<dd><pre>&nbsp;</pre><font face="Courier New, Courier"></font><br>

<dd><pre>List-Archive:
<a href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html">
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a>
</pre><font face="Courier New, Courier"></font><br>

<dd><pre>&nbsp;</pre><font face="Courier New, Courier"></font><br>

<dd><pre>List rules &amp;
etiquette:</pre><font face="Courier New, Courier"></font><br>

<dd><pre><a href="http://www.re-wrenches.org/etiquette.htm">
www.re-wrenches.org/etiquette.htm</a></pre>
<font face="Courier New, Courier"></font><br>

<dd><pre>&nbsp;</pre><font face="Courier New, Courier"></font><br>

<dd><pre>Check out or update participant
bios:</pre><font face="Courier New, Courier"></font><br>

<dd><pre><a href="http://www.members.re-wrenches.org">
www.members.re-wrenches.org</a></pre><font face="Courier New, Courier">
</font><br>

<dd><pre>&nbsp;</pre><font face="Courier New, Courier"></font><br>

</dl>
<dd>&nbsp;<br><br>
<hr>

<dd>_______________________________________________<br>

<dd>List sponsored by Redwood Alliance<br><br>

<dd>List Address: RE-wrenches@lists.re-wrenches.org<br><br>

<dd>Change listserver email address &amp; settings:<br>

<dd>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" eudora="autourl">
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a>
<br><br>

<dd>List-Archive:
<a href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html" eudora="autourl">
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a>
<br><br>

<dd>List rules &amp; etiquette:<br>

<dd><a href="http://www.re-wrenches.org/etiquette.htm" eudora="autourl">
www.re-wrenches.org/etiquette.htm</a><br><br>

<dd>Check out or update participant bios:<br>

<dd><a href="http://www.members.re-wrenches.org/" eudora="autourl">
www.members.re-wrenches.org</a><br><br>

</dl><br><br>
_______________________________________________<br>
List sponsored by Redwood Alliance<br><br>
List Address: RE-wrenches@lists.re-wrenches.org<br><br>
Change listserver email address &amp; settings:<br>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" eudora="autourl">
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a>
<br><br>
List-Archive:
<a href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html" eudora="autourl">
http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a>
<br><br>
List rules &amp; etiquette:<br>
<a href="http://www.re-wrenches.org/etiquette.htm" eudora="autourl">
www.re-wrenches.org/etiquette.htm</a><br><br>
Check out or update participant bios:<br>
<a href="http://www.members.re-wrenches.org/" eudora="autourl">
www.members.re-wrenches.org</a></blockquote></body>
</html>