<html xmlns:v="urn:schemas-microsoft-com:vml" xmlns:o="urn:schemas-microsoft-com:office:office" xmlns:w="urn:schemas-microsoft-com:office:word" xmlns:m="http://schemas.microsoft.com/office/2004/12/omml" xmlns="http://www.w3.org/TR/REC-html40"><head><meta http-equiv=Content-Type content="text/html; charset=us-ascii"><meta name=Generator content="Microsoft Word 12 (filtered medium)"><!--[if !mso]><style>v\:* {behavior:url(#default#VML);}
o\:* {behavior:url(#default#VML);}
w\:* {behavior:url(#default#VML);}
.shape {behavior:url(#default#VML);}
</style><![endif]--><style><!--
/* Font Definitions */
@font-face
        {font-family:"Cambria Math";
        panose-1:2 4 5 3 5 4 6 3 2 4;}
@font-face
        {font-family:Calibri;
        panose-1:2 15 5 2 2 2 4 3 2 4;}
@font-face
        {font-family:Tahoma;
        panose-1:2 11 6 4 3 5 4 4 2 4;}
@font-face
        {font-family:Consolas;
        panose-1:2 11 6 9 2 2 4 3 2 4;}
/* Style Definitions */
p.MsoNormal, li.MsoNormal, div.MsoNormal
        {margin:0in;
        margin-bottom:.0001pt;
        font-size:12.0pt;
        font-family:"Times New Roman","serif";
        color:black;}
a:link, span.MsoHyperlink
        {mso-style-priority:99;
        color:#0563C1;
        text-decoration:underline;}
a:visited, span.MsoHyperlinkFollowed
        {mso-style-priority:99;
        color:#954F72;
        text-decoration:underline;}
pre
        {mso-style-priority:99;
        mso-style-link:"HTML Preformatted Char";
        margin:0in;
        margin-bottom:.0001pt;
        font-size:10.0pt;
        font-family:"Courier New";
        color:black;}
p.MsoAcetate, li.MsoAcetate, div.MsoAcetate
        {mso-style-priority:99;
        mso-style-link:"Balloon Text Char";
        margin:0in;
        margin-bottom:.0001pt;
        font-size:8.0pt;
        font-family:"Tahoma","sans-serif";
        color:black;}
span.HTMLPreformattedChar
        {mso-style-name:"HTML Preformatted Char";
        mso-style-priority:99;
        mso-style-link:"HTML Preformatted";
        font-family:"Consolas","serif";
        color:black;}
span.EmailStyle19
        {mso-style-type:personal;
        font-family:"Calibri","sans-serif";
        color:#44546A;}
span.EmailStyle20
        {mso-style-type:personal-reply;
        font-family:"Calibri","sans-serif";
        color:#1F497D;}
span.BalloonTextChar
        {mso-style-name:"Balloon Text Char";
        mso-style-priority:99;
        mso-style-link:"Balloon Text";
        font-family:"Tahoma","sans-serif";
        color:black;}
.MsoChpDefault
        {mso-style-type:export-only;
        font-size:10.0pt;}
@page WordSection1
        {size:8.5in 11.0in;
        margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
        {page:WordSection1;}
--></style><!--[if gte mso 9]><xml>
<o:shapedefaults v:ext="edit" spidmax="1026" />
</xml><![endif]--><!--[if gte mso 9]><xml>
<o:shapelayout v:ext="edit">
<o:idmap v:ext="edit" data="1" />
</o:shapelayout></xml><![endif]--></head><body bgcolor=white lang=EN-US link="#0563C1" vlink="#954F72"><div class=WordSection1><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D'>I would not classify what we are doing in PV as SCADA.<o:p></o:p></span></p><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D'><o:p>&nbsp;</o:p></span></p><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D'>It is purely data acquisition at this point, and more commonly referred to as DAS or a Data Acquisition System.<o:p></o:p></span></p><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D'>SCADA by its definition entails a two way path of both receiving data and being able to send control signals, usually from a big picture program, monitoring dozens of data points.<o:p></o:p></span></p><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D'>Let&#8217;s not try to make the simple into a more complex thing than it is.<o:p></o:p></span></p><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D'><o:p>&nbsp;</o:p></span></p><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D'>-Glenn<o:p></o:p></span></p><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif";color:#1F497D'><o:p>&nbsp;</o:p></span></p><div><div style='border:none;border-top:solid #B5C4DF 1.0pt;padding:3.0pt 0in 0in 0in'><p class=MsoNormal><b><span style='font-size:10.0pt;font-family:"Tahoma","sans-serif";color:windowtext'>From:</span></b><span style='font-size:10.0pt;font-family:"Tahoma","sans-serif";color:windowtext'> RE-wrenches [mailto:re-wrenches-bounces@lists.re-wrenches.org] <b>On Behalf Of </b>Ray Walters<br><b>Sent:</b> Monday, September 29, 2014 2:31 PM<br><b>To:</b> RE-wrenches<br><b>Subject:</b> Re: [RE-wrenches] Metering<o:p></o:p></span></p></div></div><p class=MsoNormal><o:p>&nbsp;</o:p></p><div><p class=MsoNormal>The 2nd problem with the Envoy besides cost is that it isn't always reliable. &nbsp;&nbsp; Communication through power lines is not a new or fresh idea, and has Always been problematic.&nbsp; Once you install something you are expected to make it work, and that can be a nightmare on say an 8 module system that keeps losing communication to one or two modules.&nbsp; I've had this exact case, and confirmed multiple times that each micro was working, but the Envoy had other ideas.<br>This rush to mega data acquisition makes sense for larger PPA systems, but can just add tons of call backs and the resulting financial losses and frustrations for small systems.<br>I've spent as much time messing with SCADA, as I have with the entire install itself; now that's ridiculous.&nbsp; This isn't new either:&nbsp; I had&nbsp; SCADA systems back in the 90s, that had great promise, but ultimately were extremely hard to implement, and the customer never used after anyway......<br>The question is: <br>What does the customer really need to operate the system vs. &quot;bells and whistles&quot;.....<br><br><o:p></o:p></p><pre>R.Ray Walters<o:p></o:p></pre><pre>CTO, Solarray, Inc<o:p></o:p></pre><pre>Nabcep Certified PV Installer, <o:p></o:p></pre><pre>Licensed Master Electrician<o:p></o:p></pre><pre>Solar Design Engineer<o:p></o:p></pre><pre>303 505-8760<o:p></o:p></pre><p class=MsoNormal>On 9/29/2014 12:12 PM, August Goers wrote:<o:p></o:p></p></div><blockquote style='margin-top:5.0pt;margin-bottom:5.0pt'><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif";color:#44546A'>Hi Bill,</span><o:p></o:p></p><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif";color:#44546A'>&nbsp;</span><o:p></o:p></p><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif";color:#44546A'>One of the largest benefits of the microinverter system, in my opinion, is the ability to monitor each module individually. It might seem like ~$500 is a lot for the Envoy but I think it is well worth it when you think about the 25 year warranty period and included ongoing monitoring. We&#8217;ve had enough Enphase failures that I would personally really want to be able to keep my eye on each micro individually.</span><o:p></o:p></p><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif";color:#44546A'>&nbsp;</span><o:p></o:p></p><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif";color:#44546A'>Just a thought, August</span><o:p></o:p></p><p class=MsoNormal><span style='font-size:11.0pt;font-family:"Calibri","sans-serif";color:#44546A'>&nbsp;</span><o:p></o:p></p><div><div style='border:none;border-top:solid #B5C4DF 1.0pt;padding:3.0pt 0in 0in 0in'><p class=MsoNormal><b><span style='font-size:10.0pt;font-family:"Tahoma","sans-serif"'>From:</span></b><span style='font-size:10.0pt;font-family:"Tahoma","sans-serif"'> RE-wrenches [mailto:<a href="mailto:re-wrenches-bounces@lists.re-wrenches.org">re-wrenches-bounces@lists.re-wrenches.org</a>] <b>On Behalf Of </b>frenergy<br><b>Sent:</b> Sunday, September 28, 2014 2:26 PM<br><b>To:</b> RE-wrenches<br><b>Subject:</b> [RE-wrenches] Metering</span><o:p></o:p></p></div></div><p class=MsoNormal>&nbsp;<o:p></o:p></p><div><p class=MsoNormal>CA wrenches,<o:p></o:p></p></div><div><p class=MsoNormal>&nbsp;<o:p></o:p></p></div><div><p class=MsoNormal>&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp; I'm trying to (for the sake of my monetarily impaired customers) figure out a less expensive way to meter/monitor small enphase systems.&nbsp; One of my local utilities will allow me to just use a remanufactured utility-grade meter (ala AEE) These meters are inexpensive, robust and accurate but only display total production.&nbsp; <o:p></o:p></p></div><div><p class=MsoNormal>&nbsp;<o:p></o:p></p></div><div><p class=MsoNormal>&nbsp;&nbsp;&nbsp; &nbsp;&nbsp;&nbsp; The Envoy retails for over $5 bills.&nbsp; Most of my customers are not interested in checking their PV system on the internet, well not after a couple weeks.&nbsp; I can't seem to find any requirement from PG&amp;E&nbsp;other than in Section 5.1 of the guidebook: &quot;&nbsp;All systems receiving an EPBB incentive must install a production meter accurate to +- 5% of actual system output....&quot;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; which is pretty vague.&nbsp; plus the is no CSI incentive&nbsp; anymore.<o:p></o:p></p></div><div><p class=MsoNormal>&nbsp;<o:p></o:p></p></div><div><p class=MsoNormal>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; Anybody have a suggestion that is different from the remanu utility meter?....and possibly gives current wattage output,&nbsp;and is &quot;approved&quot; by PG&amp;E interconnection?<o:p></o:p></p></div><div><p class=MsoNormal>&nbsp;<o:p></o:p></p></div><div><p class=MsoNormal>TIA<o:p></o:p></p></div><div><p class=MsoNormal>&nbsp;<o:p></o:p></p></div><div><p class=MsoNormal>Bill<o:p></o:p></p></div><div><p class=MsoNormal><img border=0 width=306 height=103 id="_x0000_i1025" src="cid:image001.jpg@01CFDC21.F4CCD5D0"><o:p></o:p></p></div><p class=MsoNormal><br><br><br><o:p></o:p></p><pre>_______________________________________________<o:p></o:p></pre><pre>List sponsored by Redwood Alliance<o:p></o:p></pre><pre><o:p>&nbsp;</o:p></pre><pre>List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a><o:p></o:p></pre><pre><o:p>&nbsp;</o:p></pre><pre>Change listserver email address &amp; settings:<o:p></o:p></pre><pre><a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><o:p></o:p></pre><pre><o:p>&nbsp;</o:p></pre><pre>List-Archive: <a href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html">http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a><o:p></o:p></pre><pre><o:p>&nbsp;</o:p></pre><pre>List rules &amp; etiquette:<o:p></o:p></pre><pre><a href="http://www.re-wrenches.org/etiquette.htm">www.re-wrenches.org/etiquette.htm</a><o:p></o:p></pre><pre><o:p>&nbsp;</o:p></pre><pre>Check out or update participant bios:<o:p></o:p></pre><pre><a href="http://www.members.re-wrenches.org">www.members.re-wrenches.org</a><o:p></o:p></pre><pre><o:p>&nbsp;</o:p></pre></blockquote><p class=MsoNormal><o:p>&nbsp;</o:p></p></div></body></html>