<div dir="ltr">Wrenches,<div><br></div><div>One of our customers has a utility meter CT cabinet ahead of his main disconnect - please see attached image.</div><div><br></div><div>I have never seen this arrangement and would be interested if anyone can explain why the conductors are run in this fashion: I assume the insulated taps are for voltage reference purposes or to power the meter? I also assume the large donut is the CT? Are the conductors run criss-crossed due to they&#39;re being 180 out of phase?</div>
<div><br></div><div>We are more particularly interested in the correct location to make a supply side interconnection in order to ensure that all PV energy is properly metered (our utility installs net meters in place of the customer&#39;s original meter). Assuming that our AHJ approves of an interconnection inside the CT cabinet, where would we splice into the service conductors: load side of the CT?</div>
<div><br></div><div>--</div><div>Corey Shalanski</div><div>Joule Energy</div><div>New Orleans, LA</div><div hspace="streak-pt-mark" style="max-height:1px"><img style="width:0px; max-height:0px;" src="https://mailfoogae.appspot.com/t?sender=aY3NoYWxhbnNraUBqb3VsZS1lbmVyZ3kuY29t&amp;type=zerocontent&amp;guid=bb506524-f100-4688-8efc-9059736ad120"><font color="#ffffff" size="1">\u1427</font></div>
</div>