<html><head><meta http-equiv="content-type" content="text/html; charset=utf-8"></head><body dir="auto"><div><span style="-webkit-text-size-adjust: auto; background-color: rgba(255, 255, 255, 0);">Workmanship. Quality of work<br><br>As the Cdn Electrical Code does, I'm sure your NEC has a mention that any work shall be done using acceptable means.<br><br><font>"Canadian Electrical Code&nbsp;<br><u>Rule 2-108 Quality of work</u><br>The mechanical arrangement and execution of the work in connection with any electrical installation shall be acceptable."</font><br><br>This rule give an inspector the right, by code, to reject any work that is 'reasonably" not up to par (acceptable).&nbsp; You would have to think that anyone in their right mind would agree that electrical tape holding wires to the back of a module is not going to last and the wires will simply fall off before long.</span><br><br><div style="-webkit-text-size-adjust: auto; "><span class="Apple-style-span" style="-webkit-tap-highlight-color: rgba(26, 26, 26, 0.292969); -webkit-composition-fill-color: rgba(175, 192, 227, 0.230469); -webkit-composition-frame-color: rgba(77, 128, 180, 0.230469); ">benn</span></div><div style="-webkit-text-size-adjust: auto; "><span class="Apple-style-span" style="-webkit-tap-highlight-color: rgba(26, 26, 26, 0.296875); -webkit-composition-fill-color: rgba(175, 192, 227, 0.230469); -webkit-composition-frame-color: rgba(77, 128, 180, 0.230469); ">Sent from a 'smart' phone, with touch screen keys. Please excuse shortcuts and typos.&nbsp;</span></div></div><div style="-webkit-text-size-adjust: auto; "><br>On 2013-07-10, at 7:37 PM, jay peltz &lt;<a href="mailto:jay@asis.com">jay@asis.com</a>&gt; wrote:<br><br></div><blockquote type="cite" style="-webkit-text-size-adjust: auto; "><div><span>Hi all, </span><br><span></span><br><span>You code wonks can help out here</span><br><span></span><br><span>I had a friend ask about an install he saw that used electrical tape to attach the PV wires to the modules, yep actually taping them to the back of the module. </span><br><span></span><br><span>I'm having trouble figuring out if this actually breaks any codes and if so which ones</span><br><span></span><br><span>Then there is the whole ul,listing of the modules and is that approved?</span><br><span></span><br><span>Thanks,</span><br><span></span><br><span>Jay</span><br><span>Peltz power</span><br><span></span><br><span></span><br><span>_______________________________________________</span><br><span>List sponsored by Home Power magazine</span><br><span></span><br><span>List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a></span><br><span></span><br><span>Change email address &amp; settings:</span><br><span><a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a></span><br><span></span><br><span>List-Archive: <a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a></span><br><span></span><br><span>List rules &amp; etiquette:</span><br><span><a href="http://www.re-wrenches.org/etiquette.htm">www.re-wrenches.org/etiquette.htm</a></span><br><span></span><br><span>Check out participant bios:</span><br><span><a href="http://www.members.re-wrenches.org">www.members.re-wrenches.org</a></span><br><span></span><br></div></blockquote></body></html>