<html>
<body>
Hello Wrenches,<br><br>
Power One tech support said that full sized neutrals had to be run to a
pair of 240 V, PVI 3.6 inverters.&nbsp; We have a 180 foot underground
run to the service panel.&nbsp; <br><br>
Why do we need to run a full sized neutral all the way back to the
panel?&nbsp; The wiring to the panel is oversized for voltage drop.&nbsp;
The code allows for reduction of neutral size where neutral imbalance is
less than the current of a phase, which is usually the case. <br><br>
Why does a neutral need to be installed that is the size of the phase
wiring where the imbalance should be negligible? Or is there a lot of
neutral current for some reason?&nbsp; Am I missing something?&nbsp;
<br><br>
Thanks<br><br>
Drake <br><br>
<br>
<a name="_MailAutoSig"></a>Drake Chamberlin<br>
<i>Athens Electric LLC<br>
OH License 44810<br>
CO License 3773<br>
NABCEP Certified Solar PV Installer<br>
740-448-7328<br>
</i><a href="http://athens-electric.com/">http://athens-electric.com/</a>
<br>
</body>
</html>