<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
  <head>
    <meta content="text/html; charset=ISO-8859-1"
      http-equiv="Content-Type">
  </head>
  <body bgcolor="#ffffff" text="#000000">
    We too are suddenly faced with a requirement for an engineer's stamp
    on foundation drawings for pole-top racks. This new requirement just
    rankles my craw (an expression from our great-grandfathers'
    time...). This is even though DP&amp;W (our preferred pole top rack
    manufacturer) supplies drawings of pole length and foundation,
    specific to the slope, soil type, array size and wind load, upon
    request. These aren't good enough.<br>
    <br>
    I still prefer to install seasonally-adjustable racks for off-grid,
    which the array in your link, while beautifully executed as usual,
    decidedly isn't. <br>
    <br>
    But I'm starting to reconsider. Who has read Christopher Freitas'
    excellent article on large battery banks in the preceding SolarPro?
    One of his latter points in the article, which I understand was
    highly edited, was that with battery prices rising and PV prices
    falling, our off-grid designs ought to move toward substantially
    larger arrays and smaller battery banks. I believe he's right, and
    it will be a fundamental shift in our design approach. The same may
    prove relevant to racking as well: larger fixed arrays, with less
    emphasis on seasonal adjustment when other factors work against it.<br>
    Allan<br>
    <br>
    <div class="moz-signature">
      <meta http-equiv="content-type" content="text/html;
        charset=ISO-8859-1">
      <title></title>
      <font face="Times New Roman, Times, serif"><b>Allan Sindelar</b></font><br>
      <small><a href="mailto:Allan@positiveenergysolar.com"><font
            color="#000099" face="Times New Roman, Times, serif"><u>Allan@positiveenergysolar.com</u></font></a></small><font
        face="Times New Roman, Times, serif"><br>
        <span style="font-size: 10pt;">NABCEP Certified Photovoltaic
          Installer<br>
          NABCEP Certified Technical Sales Professional<br>
          New Mexico EE98J Journeyman Electrician<br>
          <b>Positive Energy, Inc.</b><br>
          3201 Calle Marie<br>
          Santa Fe, New Mexico 87507<br>
          <b>505 424-1112</b><br>
          <a href="http://www.positiveenergysolar.com/" target="_blank"><u>www.positiveenergysolar.com</u></a><o:p></o:p></span></font>
      <p class="MsoNormal" style="margin-right: 722.25pt;"><span
          style="font-size: 10pt;"><font face="Times New Roman, Times,
            serif"><st1:place w:st="on"><st1:city w:st="on"></st1:city><st1:state
                w:st="on"></st1:state><st1:postalcode w:st="on"></st1:postalcode></st1:place></font><b
            style=""><br>
          </b></span></p>
      <span style="font-size: 10pt;"><br>
      </span> </div>
    <br>
    On 3/24/2012 11:29 AM, William Miller wrote:
    <blockquote
      cite="mid:6.0.1.1.2.20120324101925.051bd9b0@millersolar.com"
      type="cite">Daryl:
      <br>
      <br>
      Thanks for the photos and description of the mounts you are
      installing.&nbsp; We have installed many of the DPW ground mount
      systems in similar configurations.
<a class="moz-txt-link-freetext" href="http://millersolar.com/MillerSolar/Portfolio/ground-mount/engineered_ground_mount.jpg">http://millersolar.com/MillerSolar/Portfolio/ground-mount/engineered_ground_mount.jpg</a><br>
      <br>
      We are realizing two things:
      <br>
      <br>
      1. Concrete footings of any type are expensive.&nbsp; The cost of
      excavation, forming and concrete really adds up.
      <br>
      <br>
      2. For off-grid, when the module tilt angle increases to 45
      degrees, the foundations need to be substantial.&nbsp; During one
      install we had our heavy PV trailer blow over due to high winds.&nbsp;
      We decided to have the foundations reviewed by an engineer and
      when we received the results, we had to go back and double our
      piers and strut.&nbsp; We had bid the job so the updates came out of
      our pocket.&nbsp; See:
<a class="moz-txt-link-freetext" href="http://millersolar.com/MillerSolar/Portfolio/ground-mount/full_size_photos/engineered_ground_mount.JPG">http://millersolar.com/MillerSolar/Portfolio/ground-mount/full_size_photos/engineered_ground_mount.JPG</a><br>
      <br>
      We are now required by the AHJ to provide a wet stamp from a
      structural engineer for every PV structure over 6 feet in height.&nbsp;
      This means every off-grid.&nbsp; We know the engineers will require
      massive foundations which will cost a lot.&nbsp; I am looking for a
      cheaper way to install these racks.&nbsp; I have not found it yet.
      <br>
      <br>
      Thanks for your input.
      <br>
      <br>
      William Miller
      <br>
      <br>
      <br>
      At 04:37 AM 3/24/2012, you wrote:
      <br>
      <blockquote type="cite">William,
        <br>
        &nbsp;&nbsp; I'm attaching a picture of a system we just completed in
        Eleuthera
        <br>
        using DPW racks on concrete pilings. We tied the pilings and
        rebar
        <br>
        reinforcement into the limestone bedrock with rebar down 16
        inches and
        <br>
        used 12 inch sono tubes as forms.
        <br>
        &nbsp;&nbsp; We do a lot of ground mounting since our summer work is
        mostly in New
        <br>
        England and snow removal is always a factor. I have two pole
        mounted
        <br>
        arrays at my home, but it is the most expensive option, and
        therefore
        <br>
        do a lot of this type of ground mounting. We also have an
        economical
        <br>
        "cribworks" type structure made from solid railroad ties and
        weighing
        <br>
        in at about 2800 lbs each that we will sometimes offer to
        customers in
        <br>
        off grid situations.
        <br>
        <br>
        Daryl
        <br>
      </blockquote>
      <br>
      _______________________________________________
      <br>
      List sponsored by Home Power magazine
      <br>
      <br>
      List Address: <a class="moz-txt-link-abbreviated" href="mailto:RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a>
      <br>
      <br>
      Options &amp; settings:
      <br>
<a class="moz-txt-link-freetext" href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a>
      <br>
      <br>
      List-Archive:
      <a class="moz-txt-link-freetext" href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a>
      <br>
      <br>
      List rules &amp; etiquette:
      <br>
      <a class="moz-txt-link-abbreviated" href="http://www.re-wrenches.org/etiquette.htm">www.re-wrenches.org/etiquette.htm</a>
      <br>
      <br>
      Check out participant bios:
      <br>
      <a class="moz-txt-link-abbreviated" href="http://www.members.re-wrenches.org">www.members.re-wrenches.org</a>
      <br>
      <br>
      <br>
    </blockquote>
  </body>
</html>