<html><head><style type="text/css"><!-- DIV {margin:0px;} --></style></head><body><div style="font-family:times new roman,new york,times,serif;font-size:12pt">I have done this 18 to 24" below grade conduit and our frost is 4 to 5 feet I have seen it freeze to 11 feet, I have not had a problem.&nbsp; I have in clay areas seen telephone poles pushed out of the ground.&nbsp; <br>dt<br><div><br></div><div style="font-family: times new roman,new york,times,serif; font-size: 12pt;"><br><div style="font-family: times new roman,new york,times,serif; font-size: 12pt;"><font size="2" face="Tahoma"><hr size="1"><b><span style="font-weight: bold;">From:</span></b> Glenn Burt &lt;glenn.burt@glbcc.com&gt;<br><b><span style="font-weight: bold;">To:</span></b> RE-wrenches &lt;re-wrenches@lists.re-wrenches.org&gt;<br><b><span style="font-weight: bold;">Sent:</span></b> Sat, April 16, 2011 10:30:48 AM<br><b><span style="font-weight: bold;">Subject:</span></b> Re:
 [RE-wrenches] Pole Mounts - Frost/Conduit &amp; Ledge<br></font><br>
<style><!--
 
 _filtered {font-family:"Cambria Math";panose-1:2 4 5 3 5 4 6 3 2 4;}
 _filtered {font-family:Calibri;panose-1:2 15 5 2 2 2 4 3 2 4;}
 _filtered {font-family:Tahoma;panose-1:2 11 6 4 3 5 4 4 2 4;}
 
p.MsoNormal, li.MsoNormal, div.MsoNormal
        {margin:0in;margin-bottom:.0001pt;font-size:11.0pt;font-family:"sans-serif";}
a:link, span.MsoHyperlink
        {color:blue;text-decoration:underline;}
a:visited, span.MsoHyperlinkFollowed
        {color:purple;text-decoration:underline;}
p.MsoListParagraph, li.MsoListParagraph, div.MsoListParagraph
        {margin-top:0in;margin-right:0in;margin-bottom:0in;margin-left:.5in;margin-bottom:.0001pt;font-size:11.0pt;font-family:"sans-serif";}
span.EmailStyle18
        {font-family:"sans-serif";color:windowtext;}
span.EmailStyle19
        {font-family:"sans-serif";color:#1F497D;}
.MsoChpDefault
        {font-size:10.0pt;}
 _filtered {margin:1.0in 1.0in 1.0in 1.0in;}
div.WordSection1
        {}
 
 _filtered {}
 _filtered {}
 _filtered {}
 _filtered {}
 _filtered {}
 _filtered {}
 _filtered {}
 _filtered {}
 _filtered {}
 _filtered {}
 _filtered {}
 _filtered {}
ol
        {margin-bottom:0in;}
ul
        {margin-bottom:0in;}
--></style><div class="WordSection1"><p class="MsoListParagraph" style=""><span style="color: rgb(31, 73, 125);"><span style="">1)<span style="font: 7pt &quot;Times New Roman&quot;;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><span style="color: rgb(31, 73, 125);">When we use this option, we bring the PVC conduit into the Sonotube below frost level.</span></p><p class="MsoListParagraph" style=""><span style="color: rgb(31, 73, 125);"><span style="">2)<span style="font: 7pt &quot;Times New Roman&quot;;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span></span><span style="color: rgb(31, 73, 125);">We had a similar situation &amp; after consulting with an engineer, widened the form at the top, just below the ground according to his calculations \u2013 turned out almost to be a patio. Then they were buried. So I recommend finding an engineer to evaluate the TPM requirements and adapt a foundation to an equivalent.</span></p><p class="MsoNormal"><span
 style="color: rgb(31, 73, 125);">Good Luck!</span></p><p class="MsoNormal"><span style="color: rgb(31, 73, 125);">Glenn Burt</span></p><p class="MsoNormal"><span style="color: rgb(31, 73, 125);"> &nbsp;</span></p><div><div style="border-width: 1pt medium medium; border-style: solid none none; border-color: rgb(181, 196, 223) -moz-use-text-color -moz-use-text-color; padding: 3pt 0in 0in;"><p class="MsoNormal"><b><span style="font-size: 10pt; font-family: &quot;sans-serif&quot;;">From:</span></b><span style="font-size: 10pt; font-family: &quot;sans-serif&quot;;"> re-wrenches-bounces@lists.re-wrenches.org [mailto:re-wrenches-bounces@lists.re-wrenches.org] <b>On Behalf Of </b>Rich Nicol<br><b>Sent:</b> Saturday, April 16, 2011 10:55 AM<br><b>To:</b> re-wrenches@lists.re-wrenches.org<br><b>Subject:</b> [RE-wrenches] Pole Mounts - Frost/Conduit &amp; Ledge</span></p></div></div><p class="MsoNormal"> &nbsp;</p><p class="MsoNormal">Hi RE-Wrenches</p><p
 class="MsoListParagraph" style=""><span style="">1.<span style="font: 7pt &quot;Times New Roman&quot;;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span>When installing pole mounts I have been running conduit into the side of the foundation and up the pole prior to pouring concrete.&nbsp; The conduit enters the foundation ~ 18\u201d to 24\u201d below grade level.&nbsp; We live in an area where frost depths are around 48\u201d deep.&nbsp; I have been told by folks in the construction industry that frost will not be problem with the conduit entry but I remain concerned that the conduit may be lifted, while the foundation which runs to below the frost depth, remains stationary thereby breaking the conduit.&nbsp; Any insights?</p><p class="MsoNormal"> &nbsp;</p><p class="MsoListParagraph" style=""><span style="">2.<span style="font: 7pt &quot;Times New Roman&quot;;">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; </span></span>Secondly, does anyone have experience with ledge in respect
 to pole mounts.&nbsp; I know the answer is to consult an engineer, but I thought I would bring it up to the experienced folks in the trade first.&nbsp; I have two mounts scheduled for this spring where I expect to hit ledge.&nbsp; The first is a TPM with six 230 watt modules and the second is with eight 230 watt modules.&nbsp; I\u2019m expecting ledge to be relatively close to grade level, perhaps around 12 to 24\u201d deep.&nbsp; Ledge in these locations is solid (generally granite, sometimes gneiss or basalt).&nbsp; My initial thought is to form a larger rectangular foundation with pins drilled at 45 deg angles into the ledge and tied to the reinforcing within the foundation.&nbsp; A wide base on the pole would then be bolted to the foundation.&nbsp; Any recommendations?</p><p class="MsoNormal"> &nbsp;</p><p class="MsoNormal">Thanks</p><p class="MsoNormal">Rich</p></div></div></div>
</div></body></html>