<html>
<body>
Friends:<br><br>
I have managed to confuse myself on the proper steps for equalizing
batteries with the SW inverter and I am hoping I can get some
clarification.&nbsp; The instructions indicate you can't start an
equalization manually.&nbsp; Instead it says that you must wait until the
inverter starts automatically after setting the control to EQ.<br><br>
I very much prefer to have my customers equalize at a time specific so
they monitor the process was successful and know it was successful.&nbsp;
I thought I remembered that you could start the generator from the
control panel and then engage EQ, but with at least one client, the
generator shuts down right away.&nbsp; We made a brief experiment with
starting the generator from the gen set itself and then engaging
EQ.&nbsp; My client was leaving the premises shortly after I gave these
new instructions so we aborted the EQ until another day.&nbsp; In the
meantime, I'd appreciate any input any of you may have as to the best way
to EQ with an SW inverter using the generator input.<br><br>
Thanks,<br><br>
William Miller<br><br>
<br>
PS:&nbsp; This inverter requires a three-wire start connection with the
&quot;glow-stop&quot; setting.<br><br>
Wm<br><br>
<br>
<x-sigsep><p></x-sigsep>
<font size=3><u>Please note new e-mail address and domain:<br><br>
</u>William Miller <br>
Miller Solar<br>
Voice :805-438-5600<br>
email: william@millersolar.com<br>
<a href="http://millersolar.com/" eudora="autourl">http://millersolar.com<br>
</a>License No. C-10-773985<br>
</font></body>
</html>