<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META content="text/html; charset=us-ascii" http-equiv=Content-Type>
<STYLE type=text/css>DIV {
        MARGIN: 0px
}
</STYLE>

<META name=GENERATOR content="MSHTML 8.00.6001.18975"></HEAD>
<BODY>
<DIV dir=ltr align=left><FONT color=#0000ff size=2 face=Arial><SPAN 
class=406391019-29102010>Funny,</SPAN></FONT></DIV>
<DIV dir=ltr align=left><FONT color=#0000ff size=2 face=Arial><SPAN 
class=406391019-29102010></SPAN></FONT>&nbsp;</DIV>
<DIV dir=ltr align=left><FONT color=#0000ff size=2 face=Arial><SPAN 
class=406391019-29102010>Because I got off the phone with Ehphase customer 
service the other day and they told me that they would not warranty their 
inverter in any "off-grid" application.&nbsp; My inquiry was in the context of 
putting them under the back generator with a isolation switch in a grid-tie with 
back generator situation. Of course I push the question up past first tier 
support to the supervisor.</SPAN></FONT></DIV>
<DIV dir=ltr align=left><FONT color=#0000ff size=2 face=Arial><SPAN 
class=406391019-29102010></SPAN></FONT>&nbsp;</DIV>
<DIV dir=ltr align=left><FONT color=#0000ff size=2 face=Arial><SPAN 
class=406391019-29102010>I bet that if you ask them to put it in writing they 
will decline.</SPAN></FONT></DIV>
<DIV><SPAN lang=en-us><FONT size=2 face=Arial></FONT></SPAN>&nbsp;</DIV>
<DIV><SPAN lang=en-us><FONT size=2 face=Arial>Mark Frye</FONT></SPAN> <BR><SPAN 
lang=en-us><FONT size=2 face=Arial>Berkeley Solar Electric Systems</FONT></SPAN> 
<BR><SPAN lang=en-us><FONT size=2 face=Arial>303 Redbud Way</FONT></SPAN> 
<BR><SPAN lang=en-us><FONT size=2 face=Arial>Nevada City,&nbsp; CA 
95959</FONT></SPAN> <BR><SPAN lang=en-us><FONT size=2 face=Arial>(530) 
401-8024</FONT></SPAN> <BR><SPAN lang=en-us></SPAN><A 
href="http://www.berkeleysolar.com/"><SPAN lang=en-us><U><FONT color=#0000ff 
size=2 face=Arial>www.berkeleysolar.com</FONT></U></SPAN></A><SPAN 
lang=en-us><FONT size=2 face=Arial>&nbsp;</FONT></SPAN> </DIV>
<DIV>&nbsp;</DIV><BR>
<DIV dir=ltr lang=en-us class=OutlookMessageHeader align=left>
<HR tabIndex=-1>
<FONT size=2 face=Tahoma><B>From:</B> re-wrenches-bounces@lists.re-wrenches.org 
[mailto:re-wrenches-bounces@lists.re-wrenches.org] <B>On Behalf Of </B>Nick 
Soleil<BR><B>Sent:</B> Friday, October 29, 2010 12:03 PM<BR><B>To:</B> 
RE-wrenches<BR><B>Subject:</B> Re: [RE-wrenches] Enphase 
warranties<BR></FONT><BR></DIV>
<DIV></DIV>
<DIV style="FONT-FAMILY: arial,helvetica,sans-serif; FONT-SIZE: 12pt">Hi 
Drake:<BR>&nbsp;&nbsp;&nbsp; I just spoke with Enphase customer service about 
interconnecting the Enphase to a battery inverters back up load center, and they 
will not void the warranty for this.&nbsp; They only void the warranty for 
physically altering the inverters, like changing the connector types.&nbsp; 
(OOPS, I am guilty of that one.)<BR>
<DIV>&nbsp;</DIV>Nick Soleil<BR>Project Manager<BR>Advanced Alternative Energy 
Solutions, LLC<BR>PO Box 657<BR>Petaluma, CA 94953<BR>Cell: 
707-321-2937<BR>Office: 707-789-9537<BR>Fax: 707-769-9037</DIV></BODY></HTML>