<html>
<head>
<style><!--
.hmmessage P
{
margin:0px;
padding:0px
}
body.hmmessage
{
font-size: 10pt;
font-family:Tahoma
}
--></style>
</head>
<body class='hmmessage'>
Hey thanks for the feedback. &nbsp; Looks like the definition of accessible is pretty much the same for the CEC and NEC, and NEC's 690.34 gives this method the go-ahead.<br><br><span class="ecxecxecxecxEC_Apple-style-span" style="color:rgb(0, 32, 96)">DayStar Renewable Energy Inc.&nbsp;</span><div><div>benn@daystarsolar.ca</div><div>780-906-7807&nbsp;</div><div>HAVE A SUNNY DAY


</div><div><br></div></div>&gt; Date: Wed, 15 Sep 2010 12:28:49 -0400<br>&gt; From: daveclick@fsec.ucf.edu<br>&gt; To: re-wrenches@lists.re-wrenches.org<br>&gt; Subject: Re: [RE-wrenches] Accessable?<br>&gt; <br>&gt; And more specifically:<br>&gt; 690.34 Access to Boxes.<br>&gt; Junction, pull, and outlet boxes located behind modules or panels shall <br>&gt; be so installed that the wiring contained in them can be rendered <br>&gt; accessible directly or by displacement of a module(s) or panel(s) <br>&gt; secured by removable fasteners and connected by a flexible wiring system.<br>&gt; <br>&gt; Andrew Truitt wrote:<br>&gt; &gt;<br>&gt; &gt;<br>&gt; &gt; Benn - I like installing j-boxes under the array as a general rule both<br>&gt; &gt; for aesthetics and to keep them somewhat sheltered from the elements.  I<br>&gt; &gt; do not see any code issues with the location because, as you mention,<br>&gt; &gt; they are still accessible.<br>&gt; &gt;<br>&gt; &gt;<br>&gt; &gt;  From NEC2008 Article 100:<br>&gt; &gt;<br>&gt; &gt; *Accessible (as applied to equipment)*. Admitting close<br>&gt; &gt; approach; not guarded by locked doors, elevation, or other<br>&gt; &gt; effective means.<br>&gt; &gt;<br>&gt; &gt; *Accessible (as applied to wiring methods)*. Capable of<br>&gt; &gt; being removed or exposed without damaging the building<br>&gt; &gt; structure or finish or not permanently closed in by the structure<br>&gt; &gt; or finish of the building.<br>&gt; &gt;<br>&gt; &gt;<br>&gt; &gt;<br>&gt; &gt; - Andrew<br>&gt; &gt;<br>&gt; &gt;<br>&gt; &gt;<br>&gt; &gt;<br>&gt; &gt; On Wed, Sep 15, 2010 at 3:15 AM, benn kilburn &lt;benn@daystarsolar.ca<br>&gt; &gt; &lt;mailto:benn@daystarsolar.ca&gt;&gt; wrote:<br>&gt; &gt;<br>&gt; &gt;     Wrenches,<br>&gt; &gt;     There has been some mention on this list lately of locating Soladeck<br>&gt; &gt;     and/or other combiner boxes under arrays.  This has me wondering if<br>&gt; &gt;     folks are doing this only for a cleaner looking roof array or if<br>&gt; &gt;     there are other reasonable intentions (lack of available roof space).<br>&gt; &gt;<br>&gt; &gt;     Other than a cleaner look, i see no benefit to doing this. (don't<br>&gt; &gt;     get me wrong, a cleanly installed array is something to be proud of)<br>&gt; &gt;       However if the box ever needs to be accessed, you have to remove<br>&gt; &gt;     at least one module to get to it, dealing with the whole 'breaking<br>&gt; &gt;     the bond' issue; having to remove the module, replacing the WEEB<br>&gt; &gt;     clip or undoing and then re-torquing the lug set screw,<br>&gt; &gt;     re-installing module, etc.  If you just wanted to quickly check<br>&gt; &gt;     something in the box (voltage, torque, whatever) it is no longer a<br>&gt; &gt;     quick and easy task.<br>&gt; &gt;<br>&gt; &gt;     So the Canadian Electrical Code says in Section 0.....Definitions<br>&gt; &gt;<br>&gt; &gt;     _Accessible_ (as applied to equipment) - admitting close approach<br>&gt; &gt;     because the equipment is not guarded by locked doors, elevation, or<br>&gt; &gt;     other effective means.<br>&gt; &gt;<br>&gt; &gt;     _Accessible_ (as applied to wiring methods) -<br>&gt; &gt;     (a) not permanently closed in by the structure or finish of the<br>&gt; &gt;     building; and<br>&gt; &gt;              (b) capable of being removed without disturbing the<br>&gt; &gt;     building structure or finish.<br>&gt; &gt;<br>&gt; &gt;     My interpretation here is that;<br>&gt; &gt;     (a) the box is not 'permanently closed in', just inconveniently<br>&gt; &gt;     closed in. and,<br>&gt; &gt;     (b) you are not disturbing the structure or finish, as you will be<br>&gt; &gt;     replacing the module as soon as you are finished in the box.<br>&gt; &gt;<br>&gt; &gt;     Many pieces of equipment and/or panels require that you remove a<br>&gt; &gt;     single piece or a multi-piece cover to access the wiring.  The pv<br>&gt; &gt;     module is like a large 'cover' in this case. So i do not see this as<br>&gt; &gt;     a code violation.  Do you?<br>&gt; &gt;<br>&gt; &gt;     I'm not familiar with the NEC, is it's definition of 'accessible'<br>&gt; &gt;     similar to the CEC's?<br>&gt; &gt;<br>&gt; &gt;     Is this combiner mounting location under the array common practice<br>&gt; &gt;     for some of you, or only done when roof space for a combiner box is<br>&gt; &gt;     limited?<br>&gt; &gt;<br>&gt; &gt;     I am going to run this scenario by one of our inspectors, i just<br>&gt; &gt;     thought i'd get some feedback from other Wrenches first.<br>&gt; &gt;<br>&gt; &gt;     cheers,<br>&gt; &gt;     benn<br>&gt; &gt;     DayStar Renewable Energy Inc.<br>&gt; &gt;     benn@daystarsolar.ca &lt;mailto:benn@daystarsolar.ca&gt;<br>&gt; &gt;     780-906-7807<br>&gt; &gt;     HAVE A SUNNY DAY<br>                                      </body>
</html>