<html>
<head>
<style><!--
.hmmessage P
{
margin:0px;
padding:0px
}
body.hmmessage
{
font-size: 10pt;
font-family:Tahoma
}
--></style>
</head>
<body class='hmmessage'>
<div>Wrenches,</div><div>There has been some mention on this list lately of locating Soladeck and/or other combiner boxes under arrays. &nbsp;This has me wondering if folks are doing this only for a cleaner looking roof array or if there are other reasonable&nbsp;intentions<span class="Apple-style-span" style="font-size: 13.3333px; ">&nbsp;(lack of available roof space).</span></div><div><span class="Apple-style-span" style="font-size: 13.3333px; "><br></span></div><div>Other than a cleaner look, i see no benefit to doing this. (don't get me wrong, a cleanly installed array is something to be proud of) &nbsp;However if the box ever needs to be accessed, you have to remove at least one module to get to it, dealing with the whole 'breaking the bond' issue; having to remove the module, replacing the WEEB clip or undoing and then re-torquing the lug set screw, re-installing module, etc. &nbsp;If you just wanted to quickly check something in the box (voltage, torque, whatever) it is no longer a quick and easy task.</div><div><br></div>So the Canadian Electrical Code says in&nbsp;<span class="Apple-style-span" style="font-size: 13.3333px; ">Section 0.....Definitions</span><div><div><br><div><u><font class="Apple-style-span" color="#1F497D">Accessible</font></u><font class="Apple-style-span" color="#1F497D"> (as applied to equipment) - admitting close approach because the equipment is not guarded by locked doors, elevation, or other effective means.&nbsp;</font></div><div><font class="Apple-style-span" color="#1F497D"><br></font></div><div><u><font class="Apple-style-span" color="#1F497D">Accessible</font></u><font class="Apple-style-span" color="#1F497D">&nbsp;(as applied to wiring methods) -</font></div><div><span class="Apple-tab-span" style="white-space:pre"><font class="Apple-style-span" color="#1F497D">  </font></span><font class="Apple-style-span" color="#1F497D">(a) not permanently closed in by the structure or finish of the building; and</font></div><div><font class="Apple-style-span" color="#1F497D">&nbsp;&nbsp; &nbsp; &nbsp; &nbsp;(b) capable of being removed without disturbing the building structure or finish.</font></div><div><br></div><div>My interpretation here is that;&nbsp;</div><div>(a) the box is not 'permanently closed in', just inconveniently closed in. and,</div><div>(b) you are not disturbing the structure or finish, as you will be replacing the module as soon as you are finished in the box.&nbsp;</div><div><br></div><div>Many pieces of equipment and/or panels require that you remove a single piece or a multi-piece cover to access the wiring. &nbsp;The pv module is like a large 'cover' in this case. So i do not see this as a code violation. &nbsp;Do you?<br><br></div><div><span class="Apple-style-span" style="font-size: 13.3333px; ">I'm not familiar with the NEC, is it's definition of 'accessible' similar to the CEC's?</span></div><div><span class="Apple-style-span" style="font-size: 13.3333px; "><br></span></div><div><span class="Apple-style-span" style="font-size: 13.3333px; ">Is this combiner mounting location under the array common practice for some of you, or only done when roof space for a combiner box is limited?</span></div><div><span class="Apple-style-span" style="font-size: 13.3333px; "><br></span></div><div><span class="Apple-style-span" style="font-size: 13.3333px; ">I am going to run this scenario by one of our inspectors, i just thought i'd get some feedback from other Wrenches first. &nbsp;</span></div><div><br></div><div>cheers,</div><div><span class="Apple-style-span" style="font-size: 13.3333px; "></span>benn<br><span class="ecxecxecxecxEC_Apple-style-span" style="color:rgb(0, 32, 96)">DayStar Renewable Energy Inc.&nbsp;</span><div><div>benn@daystarsolar.ca</div><div>780-906-7807&nbsp;</div><div>HAVE A SUNNY DAY


</div><div><br></div></div><br></div></div></div>                                           </body>
</html>