<html><head><style type="text/css"><!-- DIV {margin:0px;} --></style></head><body><div style="font-family:arial,helvetica,sans-serif;font-size:12pt">What about just applying adhesive.&nbsp; The Cali Building Code says that all roof penetrations must be flashed.&nbsp; Is the nail not a roof penetration?&nbsp; What if it works out over time, like so many other flashings nails do?&nbsp; Then you will have a leak.&nbsp; <br><div>&nbsp;</div>Nick Soleil<br>Project Manager<br>Advanced Alternative Energy Solutions, LLC<br>PO Box 657<br>Petaluma, CA 94953<br>Cell:   707-321-2937<br>Office: 707-789-9537<br>Fax:    707-769-9037<div><br></div><div style="font-family: arial,helvetica,sans-serif; font-size: 12pt;"><br><div style="font-family: times new roman,new york,times,serif; font-size: 12pt;"><font face="Tahoma" size="2"><hr size="1"><b><span style="font-weight: bold;">From:</span></b> North Texas Renewable Energy Inc &lt;ntrei@1scom.net&gt;<br><b><span
 style="font-weight: bold;">To:</span></b> RE-wrenches &lt;re-wrenches@lists.re-wrenches.org&gt;<br><b><span style="font-weight: bold;">Sent:</span></b> Wed, July 28, 2010 6:33:23 AM<br><b><span style="font-weight: bold;">Subject:</span></b> Re: [RE-wrenches] Flashings- to nail or not to nail<br></font><br>
<meta http-equiv="x-dns-prefetch-control" content="off">

 



<div><span class="984355112-28072010"><font face="Arial">Nick</font></span></div>
<div><span class="984355112-28072010"><font face="Arial">We not only 
use&nbsp;roofing nails at the bottom corners of metal flashing but 
sealant&nbsp;around the top and side edges of the face down side. It keeps 
potential water seeping from uphill away from the lag penetration[s]. We also 
seal around every shingle edge we pull up or&nbsp;trim off around the flashing. 
</font></span></div>
<div><span class="984355112-28072010"><font face="Arial">In the words of Mark Graham 
Assoc. Executive Dir of the National Roofing Contractors Assoc 
emphasized&nbsp;in his presentation at&nbsp;the AEE conference in Feb, anything 
less "...is installing roof&nbsp;leaks."</font></span></div>
<div><span class="984355112-28072010"><font face="Arial">Yep, it's more work than 
slapping down L-feet, about 5 minutes per standoff start to finish, but metal 
flashed standoffs are the only way we'll attach PV on 3-tab asphalt roofs. It's 
often&nbsp;as time consuming finding the rafters&nbsp;as it 
is&nbsp;mounting&nbsp;the footings and flashing.</font></span></div>
<div><span class="984355112-28072010"><font face="Arial">....my $0.02&nbsp; 
[compounded over 20 years]</font></span></div>
<div><span class="984355112-28072010"><font face="Arial"></font></span>&nbsp;</div>
<div><span class="984355112-28072010">
<div>Jim Duncan</div>
<div>
<div>NABCEP Certified Solar PV</div>
<div>Installer No.31310-57</div>
<div>TECL 27398</div></div>
<div>North Texas Renewable Energy</div>
<div>486 W.N. Woody Road</div>
<div>Azle Texas 76020</div>
<div>Since 1993</div>
<div><a rel="nofollow" ymailto="mailto:ntrei@1scom.net" target="_blank" href="mailto:ntrei@1scom.net">ntrei@1scom.net</a> </div>
<div>817.917.0527</div>
<div><a rel="nofollow" target="_blank" href="http://www.ntrei.com/">www.ntrei.com</a></div>
<div><font face="Arial"></font>&nbsp;</div><font face="Arial"></font></span></div>
<blockquote>
  <div class="OutlookMessageHeader" dir="ltr" align="left"><font face="Tahoma" size="2">-----Original Message-----<br><b>From:</b> 
  re-wrenches-bounces@lists.re-wrenches.org 
  [mailto:re-wrenches-bounces@lists.re-wrenches.org]<b>On Behalf Of </b>Nick 
  Soleil<br><b>Sent:</b> Tuesday, July 27, 2010 9:47 PM<br><b>To:</b> 
  RE-wrenches<br><b>Subject:</b> Re: [RE-wrenches] Flashings- to nail or not to 
  nail<br><br></font></div>
  <div style="font-size: 12pt; font-family: arial,helvetica,sans-serif;">HI 
  Wrenches:<br>&nbsp;&nbsp;&nbsp; My crew wants to nail all the flashings on our 
  footings, but I am resisting.&nbsp; Do you guys have any strong feelings about 
  that.<br>
  <div>&nbsp;</div>Nick Soleil<br>Project Manager<br>Advanced Alternative Energy 
  Solutions, LLC<br>PO Box 657<br>Petaluma, CA 94953<br>Cell: 
  707-321-2937<br>Office: 707-789-9537<br>Fax: 707-769-9037
  <div>&nbsp;</div></div></blockquote><meta http-equiv="x-dns-prefetch-control" content="on"></div></div>
</div><br>

      </body></html>