<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=us-ascii">
<STYLE type=text/css><!-- DIV {margin:0px;} --></STYLE>

<META content="MSHTML 6.00.2900.5969" name=GENERATOR></HEAD>
<BODY>
<DIV><SPAN class=984355112-28072010><FONT face=Arial>Nick</FONT></SPAN></DIV>
<DIV><SPAN class=984355112-28072010><FONT face=Arial>We not only 
use&nbsp;roofing nails at the bottom corners of metal flashing but 
sealant&nbsp;around the top and side edges of the face down side. It keeps 
potential water seeping from uphill away from the lag penetration[s]. We also 
seal around every shingle edge we pull up or&nbsp;trim off around the flashing. 
</FONT></SPAN></DIV>
<DIV><SPAN class=984355112-28072010><FONT face=Arial>In the words of Mark Graham 
Assoc. Executive Dir of the National Roofing Contractors Assoc 
emphasized&nbsp;in his presentation at&nbsp;the AEE conference in Feb, anything 
less "...is installing roof&nbsp;leaks."</FONT></SPAN></DIV>
<DIV><SPAN class=984355112-28072010><FONT face=Arial>Yep, it's more work than 
slapping down L-feet, about 5 minutes per standoff start to finish, but metal 
flashed standoffs are the only way we'll attach PV on 3-tab asphalt roofs. It's 
often&nbsp;as time consuming finding the rafters&nbsp;as it 
is&nbsp;mounting&nbsp;the footings and flashing.</FONT></SPAN></DIV>
<DIV><SPAN class=984355112-28072010><FONT face=Arial>....my $0.02&nbsp; 
[compounded over 20 years]</FONT></SPAN></DIV>
<DIV><SPAN class=984355112-28072010><FONT face=Arial></FONT></SPAN>&nbsp;</DIV>
<DIV><SPAN class=984355112-28072010>
<DIV>Jim Duncan</DIV>
<DIV>
<DIV>NABCEP Certified Solar PV</DIV>
<DIV>Installer No.31310-57</DIV>
<DIV>TECL 27398</DIV></DIV>
<DIV>North Texas Renewable Energy</DIV>
<DIV>486 W.N. Woody Road</DIV>
<DIV>Azle Texas 76020</DIV>
<DIV>Since 1993</DIV>
<DIV><A href="mailto:ntrei@1scom.net">ntrei@1scom.net</A> </DIV>
<DIV>817.917.0527</DIV>
<DIV><A href="http://www.ntrei.com/">www.ntrei.com</A></DIV>
<DIV><FONT face=Arial></FONT>&nbsp;</DIV><FONT face=Arial></FONT></SPAN></DIV>
<BLOCKQUOTE>
  <DIV class=OutlookMessageHeader dir=ltr align=left><FONT face=Tahoma 
  size=2>-----Original Message-----<BR><B>From:</B> 
  re-wrenches-bounces@lists.re-wrenches.org 
  [mailto:re-wrenches-bounces@lists.re-wrenches.org]<B>On Behalf Of </B>Nick 
  Soleil<BR><B>Sent:</B> Tuesday, July 27, 2010 9:47 PM<BR><B>To:</B> 
  RE-wrenches<BR><B>Subject:</B> Re: [RE-wrenches] Flashings- to nail or not to 
  nail<BR><BR></FONT></DIV>
  <DIV style="FONT-SIZE: 12pt; FONT-FAMILY: arial,helvetica,sans-serif">HI 
  Wrenches:<BR>&nbsp;&nbsp;&nbsp; My crew wants to nail all the flashings on our 
  footings, but I am resisting.&nbsp; Do you guys have any strong feelings about 
  that.<BR>
  <DIV>&nbsp;</DIV>Nick Soleil<BR>Project Manager<BR>Advanced Alternative Energy 
  Solutions, LLC<BR>PO Box 657<BR>Petaluma, CA 94953<BR>Cell: 
  707-321-2937<BR>Office: 707-789-9537<BR>Fax: 707-769-9037
  <DIV>&nbsp;</DIV></DIV></BLOCKQUOTE></BODY></HTML>