<html><head></head><body style="word-wrap: break-word; -webkit-nbsp-mode: space; -webkit-line-break: after-white-space; "><div>Flashed footings...&nbsp;</div><div><br></div><div>Cost shouldn't be the problem.&nbsp;</div><div><br></div><div>You can buy solar stand-offs for around $5 each from Ezee manufacturing&nbsp;</div><div>(North Hollywood, CA)&nbsp;and Otay rubber flashings for under $5 each.&nbsp;</div><div>In SoCal,&nbsp;they appear to work adequately for PV mounts and service risers&nbsp;</div><div>(7-10+&nbsp;years, no sign of degradation). For extra protection, you&nbsp;can go ahead&nbsp;</div><div>and&nbsp;put a bit of mastic under the roof mount to provide extra&nbsp;protection on the&nbsp;</div><div>lag screw holes. You can also paint the top of the flashing to make the rubber&nbsp;</div><div>last longer.</div><div><br></div><div>/wk</div><div><br><blockquote type="cite"><div><font class="Apple-style-span" color="#000000"><br></font>[mailto:re-wrenches-bounces@lists.re-wrenches.org] On Behalf Of Nick Soleil<br>Sent: Wednesday, June 23, 2010 8:10 PM<br>To: RE-wrenches<br>Subject: Re: [RE-wrenches] Flashed Footing Requirements<br>Who can help:<br> &nbsp;&nbsp;&nbsp;One of our local jurisdictions, City of Petaluma, is beginning to<br>require flashed footings under all solar arrays. &nbsp;I think that some flashed<br>footings are better than the Unirac L feet or Prosolar's TileTrac foot, but<br>the flashed footings cost a lot more $, and some flashed footing products<br>seem flawed (less watertight) &nbsp;They are asking me to uninstall two<br>commissioned systems from last week, and replace the footings with flashed<br>Fast Jacks, even though the documents detailed the penetration method.<br> &nbsp;&nbsp;&nbsp;I am looking for some good info that supports flexible installation<br>methods, including caulked footings. &nbsp;Our industry has come a long way from<br>the early days of racking on slotted angle iron with steel L-brackets for<br>feet, but those experiences tend to give me confidence in continuing to use<br>caulked footings.<br>Nick Soleil<br>Project Manager<br>Advanced Alternative Energy Solutions, LLC<br>PO Box 657<br>Petaluma, CA 94953<br>Cell: 707-321-2937<br>Office: 707-789-9537<br>Fax: 707-769-9037<br><br><br><br> yy<br><br><blockquote type="cite"><font class="Apple-style-span" color="#144FAE"><font class="Apple-style-span" color="#006312"><font class="Apple-style-span" color="#144FAE"><br></font></font></font></blockquote></div></blockquote></div><br></body></html>