<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
  <meta content="text/html;charset=ISO-8859-1" http-equiv="Content-Type">
  <title></title>
</head>
<body bgcolor="#ffffff" text="#000000">
Considering that now there are products that meet National Roofing
Contractors Association standards, it isn't worth the risk to simply
use sealant under the L foot.&nbsp; A sealant sealed L-foot is nothing but a
leak that is waiting to happen. <br>
<br>
For metal roofs other than standing seam metal there are a couple good
products for making a roof penetration that shouldn't leak<br>
<br>
<a
 href="http://aeesolar.com/PDFs/SnapNrack-Tech-Bulletin-CRB_7-23-09.pdf">http://aeesolar.com/PDFs/SnapNrack-Tech-Bulletin-CRB_7-23-09.pdf</a><br>
and<br>
<a href="http://www.ejot.com/ejot.de/Solar--3078.htm">http://www.ejot.com/ejot.de/Solar--3078.htm</a><br>
<br>
With either of these, expect to spend a lot of time installing bracing
because the top of the metal rarely coincides with the rafter or truss
location. <br>
<br>
Kent Osterberg<br>
Blue Mountain Solar, Inc.<br>
<br>
<br>
<br>
Drake Chamberlin wrote:
<blockquote
 cite="mid:20100624205209.4925F5449D@friskymail-a2.g.dreamhost.com"
 type="cite">At 01:16 PM 6/24/2010, you wrote:<br>
&nbsp; Oregon rebate programs (where we are based) are requiring all roof
penetrations/attachments to be flashed. <br>
  <br>
  <font color="#0000ff">What do you use to flash metal roofs?<br>
  <br>
  <br>
  <br>
  </font>
  <blockquote type="cite" class="cite" cite="">Sunny Regards,<br>
Kirpal Khalsa<br>
NABCEP Certified Solar PV Installer<br>
Renewable Energy Systems<br>
    <a moz-do-not-send="true" href="http://www.oregonsolarworks.com">www.oregonsolarworks.com</a><br>
541-218-0201 m<br>
541-592-3958 o<br>
    <br>
On Thu, Jun 24, 2010 at 9:18 AM, Peter Parrish
&lt;<a moz-do-not-send="true"
 href="mailto:peter.parrish@calsolareng.com">
peter.parrish@calsolareng.com</a>&gt; wrote:<br>
    <dl>
      <br>
      <dd><font color="#000080" size="2">IMHO the TileTrack system for
flat
concrete tile or S-tile is the best approach there is. The 3/8&#8221; SS all
thread can be accommodated by a ~3/8&#8221; hole in the tile, leaving an
exceedingly narrow gap around the all-thread to caulk. <br>
        </font><br>
      </dd>
      <dd><font color="#000080" size="2">&nbsp;<br>
        </font><br>
      </dd>
      <dd><font color="#000080" size="2">By way of distinction, I never
use tile
track on comp-shingle or torchdown roofs, using instead Fast-Jacks and
Oatey elastomeric flashing.<br>
        </font><br>
      </dd>
      <dd><font color="#000080" size="2">&nbsp;<br>
        </font><br>
      </dd>
      <dd><font color="#000080" size="2">- Peter<br>
        </font><br>
      </dd>
      <dd><font color="#000080" size="2">&nbsp;<br>
        </font><br>
      </dd>
      <dd><font color="#000080" size="2">&nbsp;<br>
        </font><br>
      </dd>
      <dd><font color="#000080" size="2">Peter T. Parrish, Ph.D.,
President<br>
        </font></dd>
      <dd><font color="#000080" size="2">California Solar Engineering,
Inc.<br>
        </font></dd>
      <dd><font color="#000080" size="2">820 Cynthia Ave., Los Angeles,
CA 90065<br>
        </font></dd>
      <dd><font color="#000080" size="2">CA Lic. 854779, NABCEP Cert.
031806-26<br>
        </font></dd>
      <dd><font color="#000080" size="2"><a moz-do-not-send="true"
 href="mailto:peter.parrish@calsolareng.com">peter.parrish@calsolareng.com</a>&nbsp;
        <br>
        </font></dd>
      <dd><font color="#000080" size="2">Ph 323-258-8883, Mobile
323-839-6108, Fax
323-258-8885&nbsp;&nbsp;&nbsp;
        </font><font color="#000080" size="1">&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;
        <br>
        </font><br>
      </dd>
      <dd><font color="#000080" size="2">&nbsp;<br>
        </font>
        <hr>
      </dd>
      <dd><font face="Tahoma" size="2">From:
        <a moz-do-not-send="true"
 href="mailto:re-wrenches-bounces@lists.re-wrenches.org">re-wrenches-bounces@lists.re-wrenches.org</a>
[<a moz-do-not-send="true"
 href="mailto:re-wrenches-bounces@lists.re-wrenches.org"
 eudora="autourl">
mailto:re-wrenches-bounces@lists.re-wrenches.org</a>] On Behalf Of
Nick Soleil<br>
        </font></dd>
      <dd><font face="Tahoma" size="2">Sent: Wednesday, June 23, 2010
5:10 PM<br>
        </font></dd>
      <dd><font face="Tahoma" size="2">To: RE-wrenches<br>
        </font></dd>
      <dd><font face="Tahoma" size="2">Subject: Re: [RE-wrenches]
Flashed Footing Requirements<br>
        </font><br>
      </dd>
      <dd><font face="Times New Roman, Times">&nbsp;<br>
        </font><br>
      </dd>
      <dd>Who can help:<br>
      </dd>
      <dd>&nbsp;&nbsp;&nbsp; One of our local jurisdictions, City of Petaluma,
is beginning to require flashed footings under all solar arrays.&nbsp; I
think that some flashed footings are better than the Unirac L feet or
Prosolar's TileTrac foot, but the flashed footings cost a lot more $,
and
some flashed footing products seem flawed (less watertight)&nbsp; They
are asking me to uninstall two commissioned systems from last week, and
replace the footings with flashed Fast Jacks, even though the documents
detailed the penetration method.&nbsp; <br>
        <br>
      </dd>
      <dd>&nbsp;&nbsp;&nbsp; I am looking for some good info that supports
flexible installation methods, including caulked footings.&nbsp; Our
industry has come a long way from the early days of racking on slotted
angle iron with steel L-brackets for feet, but those experiences tend
to
give me confidence in continuing to use caulked footings.&nbsp; <br>
        <br>
      </dd>
      <dd>Nick Soleil<br>
      </dd>
      <dd>Project Manager<br>
      </dd>
      <dd>Advanced Alternative Energy Solutions, LLC<br>
      </dd>
      <dd>PO Box 657<br>
      </dd>
      <dd>Petaluma, CA 94953<br>
      </dd>
      <dd>Cell: 707-321-2937<br>
      </dd>
      <dd>Office: 707-789-9537<br>
      </dd>
      <dd>Fax: 707-769-9037<br>
        <br>
      </dd>
      <dd>&nbsp;<br>
      </dd>
    </dl>
  </blockquote>
  <x-sigsep></x-sigsep>
  <p><font color="#0000ff">Drake Chamberlin<br>
Athens Electric<br>
OH License 44810<br>
CO License 3773<br>
NABCEP </font><font color="#0000ff" size="1">TM&nbsp;
  </font><font color="#0000ff">Certified PV Installer <br>
Office - 740-448-7328<br>
Mobile - 740-856-9648 </font></p>
  <pre wrap="">
<hr size="4" width="90%"></pre>
</blockquote>
</body>
</html>