<html><head><style type="text/css"><!-- DIV {margin:0px;} --></style></head><body><div style="font-family:arial,helvetica,sans-serif;font-size:12pt">Of course, I provide the CAD drawing with the string sizes listed, the volts, amps, wire sizing, conduit, and breaker panel specs, label details, percentage of bussbar ratings, THWN-2, and an enormous amount of other details.&nbsp; I do it for my crew, not for the plan checker.&nbsp; It takes an expert to know the difference between an expert and an amateur installer, but <span style="font-weight: bold;">the plan checker is not the expert, </span>and will not be able to determine if;<br>&nbsp;- you sized the Vmp to the Average Ambient High Temp (as most manus do???) or to the 30 year high.&nbsp; <br>&nbsp;- They can't verify that the string sizing accounts for degradation of voltage over the life of the system, or<br>-&nbsp; That the AC voltage drop is adequate to prevent nuisance shut-offs from high
 voltages<br>&nbsp;&nbsp;&nbsp; <span style="font-weight: bold;">So as long as the plan checker can verify that a CAD roof layout has been provided, and other general permit requirements are met, then let us have the permit over the counter at a reasonable fee</span>.<br><div>&nbsp;</div>Nick Soleil<br>Project Manager<br>Advanced Alternative Energy Solutions, LLC<br>PO Box 657<br>Petaluma, CA 94953<br>Cell:   707-321-2937<br>Office: 707-789-9537<br>Fax:    707-769-9037<div><br></div><div style="font-family: arial,helvetica,sans-serif; font-size: 12pt;"><br><div style="font-family: times new roman,new york,times,serif; font-size: 12pt;"><font face="Tahoma" size="2"><hr size="1"><b><span style="font-weight: bold;">From:</span></b> William Miller &lt;william@millersolar.com&gt;<br><b><span style="font-weight: bold;">To:</span></b> RE-wrenches &lt;re-wrenches@lists.re-wrenches.org&gt;<br><b><span style="font-weight: bold;">Sent:</span></b> Tue, June 15, 2010
 6:02:19 PM<br><b><span style="font-weight: bold;">Subject:</span></b> Re: [RE-wrenches] electrical permit requirements<br></font><br>
<meta http-equiv="x-dns-prefetch-control" content="off">

<font size="3">Nick:<br><br>
Rhetorical questions to follow:<br><br>
If you do not provide string calculations, how do you verify that Voc
will not exceed NEC limits?&nbsp; How do you verify DC feeder
ampacities?&nbsp; Does your jurisdiction not verify such
parameters?&nbsp;&nbsp; We know you have a handle on these factors, but
how about the Johnny-come-latelies trying to take your business?&nbsp;
Should they not be kept to uniform standards meant to protect the safety
of the consumer (and ensure fair competition)?<br><br>
Can you really expect a field inspector or the customer to verify these
parameters?&nbsp; I believe all of these issues are best handled by
stringent plan check.<br><br>
What is more important to you:&nbsp; saving a few bucks in permit fees or
preventing house fires?<br><br>
William Miller<br><br>
<br><br>
<br>
At 05:01 PM 6/15/2010, you wrote:<br>
</font><blockquote type="cite" class="cite" cite=""><font size="3">Hi Jeff:<br>
&nbsp;&nbsp;&nbsp; My standard permit docs are comprehensive, but do not
include documentation regarding string sizing, thank goodness.&nbsp; A
permit technician/ plan reviewer should not be overseeing string
sizing.&nbsp; You should be thankful that the permit fees are so low,
because that is the best thing a jurisdiction could do to support
PV!&nbsp; <br>
&nbsp;&nbsp;&nbsp; Any fly-by-night, incompetent installer can check
string sizing on the inverter manu's web site.&nbsp; I would suspect
that, regardless of the plan review process, the less experienced
installers will still be accountable to the inspector and their
customer.<br>
&nbsp;<br>
Nick Soleil</font></blockquote><meta http-equiv="x-dns-prefetch-control" content="on"></div></div>