<html>
<head>
<style><!--
.hmmessage P
{
margin:0px;
padding:0px
}
body.hmmessage
{
font-size: 10pt;
font-family:Verdana
}
--></style>
</head>
<body class='hmmessage'>
Thanks Rebecca,<div><br></div><div>I asked my local inspection office if when a contractor is installing a home's back-up generator, if the cost of the generator is included in the cost of the permit. The answer was no. &nbsp;The permit cost is based on the cost of labor and materials to install the generator. &nbsp;I did not specify that the generator was PV, however i do not see what difference that would make.</div><div><br></div><div>cheers,</div><div>benn<br><br><span class="ecxecxEC_Apple-style-span" style="color:rgb(0, 32, 96)">DayStar Renewable Energy Inc.&nbsp;</span><div><div>www.daystarsolar.ca</div><div>benn@daystarsolar.ca</div><div>780-906-7807&nbsp;</div><div>HAVE A SUNNY DAY</div></div><br><br><br>&gt; Date: Tue, 9 Mar 2010 16:31:27 -0600<br>&gt; From: Rebecca Lundberg &lt;Rebecca.Lundberg@powerfullygreen.com&gt;<br>&gt; To: re-wrenches@lists.re-wrenches.org<br>&gt; Subject: Re: [RE-wrenches] Permit Cost<br>&gt; Message-ID:<br>&gt;        &lt;c64d24ab1003091431w58d71e66gf2550fe543a49f8e@mail.gmail.com&gt;<br>&gt; Content-Type: text/plain; charset="iso-8859-1"<br>&gt; <br>&gt; Hi Benn,<br>&gt; <br>&gt; In my area this depends on the city permitting office, and they are very<br>&gt; particular about it. A few cities (Minneapolis, for one) had an<br>&gt; administrative agreement to help support solar by requiring the 'total value<br>&gt; of the project' be that of everything but the modules and inverter, thus<br>&gt; lowering the cost of the permit quite a bit. Since many require me to drop<br>&gt; off the permit application to a receptionist and will not allow me to have<br>&gt; the conversation with someone directly, I usually add a line so I can<br>&gt; include both cost options. My success in having the lower cost used was<br>&gt; about 50/50 a year ago, but almost without exception I am now finding the<br>&gt; permit offices are adding fees and require the full installed cost be used<br>&gt; for the permit. I've even had them require additional mid-job inspections so<br>&gt; they can charge the additional inspection fees. Hopefully as more solar is<br>&gt; installed a more standardized policy/process will be put into place, and we<br>&gt; won't have so many unknowns in the bidding process.<br>&gt; <br>&gt; Keep Shining!<br>&gt; Rebecca Lundberg<br>&gt; Powerfully Green, Minnesota<br>&gt; <br>&gt; Wrenches,<br>&gt; &gt; I have been hearing differences in opinions/interpretations when it comes<br>&gt; &gt; to filling out electrical permit applications for grid-tie PV systems and<br>&gt; &gt; you come to the line that asks for &lt;direct quote&gt; "Cost of Installation<br>&gt; &gt; (Labor plus Material)", which determines the cost of the permit.<br>&gt; &gt; I have been including the cost of labor and all material including modules,<br>&gt; &gt; inverter, racking (the big ticket items) as well as the 'materials' such as<br>&gt; &gt; wire, conduit, straps, screws, boxes, etc.<br>&gt; &gt; It has come to my attention that some companies do not include the more<br>&gt; &gt; expensive 'equipment' (mods, inverter) in the "Cost of Installation", which<br>&gt; &gt; can reduce the cost of the permit by a couple/few hundred dollars, thus<br>&gt; &gt; saving the homeowner a bit of money on the permit fee.<br>&gt; &gt; What are your thoughts or interpretations on this?<br>&gt; &gt; cheers,benn<br>&gt; &gt;<br>&gt; &gt;<br><br></div>
                                          <br /><hr />Live connected with Messenger on your phone <a href='http://go.microsoft.com/?linkid=9712957' target='_new'>Learn more.</a></body>
</html>