Hi Benn,<br><br>In my area this depends on the city permitting office, and they are very particular about it. A few cities (Minneapolis, for one) had an administrative agreement to help support solar by requiring the &#39;total value of the project&#39; be that of everything but the modules and inverter, thus lowering the cost of the permit quite a bit. Since many require me to drop off the permit application to a receptionist and will not allow me to have the conversation with someone directly, I usually add a line so I can include both cost options. My success in having the lower cost used was about 50/50 a year ago, but almost without exception I am now finding the permit offices are adding fees and require the full installed cost be used for the permit. I&#39;ve even had them require additional mid-job inspections so they can charge the additional inspection fees. Hopefully as more solar is installed a more standardized policy/process will be put into place, and we won&#39;t have so many unknowns in the bidding process.<br>
<br>Keep Shining!<br>Rebecca Lundberg<br>Powerfully Green, Minnesota<br><br><div class="gmail_quote"><blockquote class="gmail_quote" style="border-left: 1px solid rgb(204, 204, 204); margin: 0pt 0pt 0pt 0.8ex; padding-left: 1ex;">

Wrenches,<br>
I have been hearing differences in opinions/interpretations when it comes to filling out electrical permit applications for grid-tie PV systems and you come to the line that asks for &lt;direct quote&gt; &quot;Cost of Installation (Labor plus Material)&quot;, which determines the cost of the permit.<br>

I have been including the cost of labor and all material including modules, inverter, racking (the big ticket items) as well as the &#39;materials&#39; such as wire, conduit, straps, screws, boxes, etc.<br>
It has come to my attention that some companies do not include the more expensive &#39;equipment&#39; (mods, inverter) in the &quot;Cost of Installation&quot;, which can reduce the cost of the permit by a couple/few hundred dollars, thus saving the homeowner a bit of money on the permit fee.<br>

What are your thoughts or interpretations on this?<br>
cheers,benn<br><br></blockquote></div>