<DIV>Brian:</DIV>
<DIV>&nbsp;</DIV>
<DIV>It seems to me that this requires the PE to actually commission the 
system.&nbsp; A simple wet-stamp on plan submittals is not even indicated by the 
paragraph below, but I am certain is required.&nbsp; </DIV>
<DIV>Bill, have you had to have a PE provide a commissioning report at the time 
of final inspection for your installations?&nbsp;This is a requirement that 
could arguably make sense for commercial systems, but is a good example of how 
local authorities have carte blanche to&nbsp;overlay egregiously onerous 
requirements if their civic spirit is anti-solar.&nbsp; </DIV>
<DIV>&nbsp;</DIV>
<DIV>We stopped working in Yorba Linda many years ago.&nbsp; Aside from 
the&nbsp;city's&nbsp;total and casual disregard for the solar rights act,&nbsp; 
B&amp;S attitude was one of obstruction.&nbsp;FYI, this&nbsp;city is Nixon's 
hometown.</DIV>
<DIV>&nbsp;</DIV>
<DIV>Patrick Redgate</DIV>
<DIV>Ameco Solar</DIV>
<DIV>&nbsp;</DIV>
<DIV>
<DIV>In a message dated 12/19/2009 7:43:48 A.M. Pacific Standard Time, 
wkorthof@eesolar.com writes:</DIV>
<BLOCKQUOTE 
style="BORDER-LEFT: blue 2px solid; PADDING-LEFT: 5px; MARGIN-LEFT: 5px"><FONT 
  style="BACKGROUND-COLOR: transparent" color=#000000 size=2 face=Arial>Yes, 
  Yorba Linda technically requires an electrical PE stamp on PV&nbsp; 
  <BR>projects.<BR><BR>&nbsp; We've probably done a dozen installations in the 
  city, though I&nbsp; <BR>don't think they've<BR>enforced the electrical PE 
  requirement on all projects. They do&nbsp; <BR>require structural<BR>PE on all 
  projects as well, and that requirement is always enforced.&nbsp; <BR>Big 
  pain.<BR><BR>Yes it's onerous. Yes we hate it. But we keep going.<BR><BR>We 
  have structural and electrical PE engineers available to review and&nbsp; 
  <BR>certify our<BR>plans as needed, so these are just more extra costs helping 
  to drive&nbsp; <BR>up the cost<BR>of solar.<BR><BR>/wk<BR><BR><BR>&gt;&nbsp; 
  ----- Original Message -----<BR>&gt;&nbsp; From: William Miller<BR>&gt;&nbsp; 
  To: RE-wrenches<BR>&gt;&nbsp; Sent: Friday, December 18, 2009 5:05 
  PM<BR>&gt;&nbsp; Subject: Re: [RE-wrenches] Solar System 
  Certification<BR>&gt;<BR>&gt;<BR>&gt;&nbsp; Brian:<BR>&gt;<BR>&gt;&nbsp; I 
  looked up the Municipal Codes 
  (http://www.ci.yorba-linda.ca.us/~ci26/how-do-i/get/get-city-codes <BR>&gt; ) 
  and this requirement is right in there.&nbsp; I hope you have a&nbsp; <BR>&gt; 
  provision in your contract that allows for additional billing for&nbsp; 
  <BR>&gt; unanticipated engineering fees.&nbsp; Everyone should.&nbsp; If you 
  need&nbsp; <BR>&gt; language, contact me off line.<BR>&gt;<BR>&gt;&nbsp; 
  Fortunately I have never experienced anything like this.&nbsp; This&nbsp; 
  <BR>&gt; requirement sounds unreasonable.&nbsp; It is sort of like asking an 
  air&nbsp; <BR>&gt; conditioning contractor to have the air conditioning unit 
  tested in&nbsp; <BR>&gt; the field.&nbsp; Individual solar components are 
  listed.&nbsp; The combining&nbsp; <BR>&gt; of the components is facilitated by 
  the manufacturers specifications&nbsp; <BR>&gt; and on-line sizing tools. 
  Having said that, an amateur can easily&nbsp; <BR>&gt; screw the design and 
  installation of even the most simple grid-tie&nbsp; <BR>&gt; system.&nbsp; 
  This provision is the ultimate consumer protection.&nbsp; It&nbsp; <BR>&gt; 
  sounds onerous at first but does have a benefit.<BR>&gt;<BR>&gt;&nbsp; Good 
  luck, and give us a hint how much this certification 
  costs.<BR>&gt;<BR>&gt;&nbsp; William 
  Miller<BR>&gt;<BR>&gt;<BR>&gt;<BR>&gt;<BR>&gt;&nbsp; At 01:31 PM 12/18/2009, 
  you wrote:<BR>&gt;<BR>&gt;&nbsp; &nbsp; I am curious if any of you have had to 
  deal with this issue before.<BR>&gt;<BR>&gt;&nbsp; &nbsp; The following is an 
  item we got back from the City of Yorba Linda&nbsp; <BR>&gt; for a Plan Check 
  correction:<BR>&gt;<BR>&gt;<BR>&gt;&nbsp; &nbsp;&nbsp; All electrical solar 
  systems shall be tested and approved by a&nbsp; <BR>&gt; California Registered 
  Electrical Engineer.&nbsp; The engineer shall&nbsp; <BR>&gt; furnish a report 
  stating their name, registration number, its date&nbsp; <BR>&gt; of 
  expiration, address where the testing occurred and the dates of&nbsp; <BR>&gt; 
  testing and approval.&nbsp; Such report shall be presented to the City&nbsp; 
  <BR>&gt; inspector for approval at the time of final inspection.&nbsp; 
  (YLMC&nbsp; <BR>&gt; 15.28.020)&nbsp; Note on the plans.<BR>&gt;<BR>&gt;&nbsp; 
  &nbsp; All experiences and suggestion are 
  appreciated.<BR>&gt;<BR>&gt;<BR>&gt;<BR>&gt;&nbsp; &nbsp; Best 
  Regards,<BR>&gt;&nbsp; &nbsp; Brian C. White<BR>&gt;&nbsp; &nbsp; Design 
  Engineer - PV Systems<BR>&gt;<BR>&gt;&nbsp; &nbsp; Eagle Roofing 
  Products<BR>&gt;&nbsp; &nbsp; 120 North Auburn Street - Suite 
  212<BR>&gt;&nbsp; &nbsp; Grass Valley, CA&nbsp; 95945<BR>&gt;&nbsp; &nbsp; 
  Phone: 530-273-2948<BR>&gt;&nbsp; &nbsp; Cell: 530-575-5550<BR>&gt;&nbsp; 
  &nbsp; e-mail: brianw@eagleroofing.com 
  &lt;mailto:brianw@eagleroofing.com&gt;<BR>&gt;<BR>&gt;&nbsp; &nbsp; 
  _______________________________________________<BR>&gt;&nbsp;&gt;<BR>&gt;<BR>&gt;&nbsp;&nbsp;&nbsp;&gt;<BR>&gt;<BR>&gt;<BR>&gt; 
  </FONT></BLOCKQUOTE></DIV></FONT></BODY></HTML>