<html>
<body>
<font size=3>Mark:<br><br>
I like the fact that they provide a perceivable detent when the connector
lock is completely tight.&nbsp; I am not qualified to judge whether they
will last the 25 years the modules are rated for.&nbsp; The beginning of
the chain sees low amperage while the end sees the total amperage.&nbsp;
The pins seem rather slender for up to 15 amps...<br><br>
We fully plan on replacing the typical inverter with new, better
technology within the 25 year system life expectancy, but this will be
more difficult with Enphase.<br><br>
William<br><br>
<br><br>
At 07:55 AM 11/13/2009, you wrote:<br>
</font><blockquote type=cite class=cite cite><font face="arial" size=2 color="#0000FF">William,<br>
</font><font size=3>&nbsp;<br>
</font><font face="arial" size=2 color="#0000FF">What do you think about
the reliability of the Tyco AC connectors used in the Enphase
system?<br>
</font><font size=3>&nbsp;<br>
</font><font face="arial" size=2>Mark Frye</font><font size=3> <br>
</font><font face="arial" size=2>Berkeley Solar Electric
Systems</font><font size=3> <br>
</font><font face="arial" size=2>303 Redbud Way</font><font size=3> 
<br>
</font><font face="arial" size=2>Nevada City,&nbsp; CA
95959</font><font size=3> <br>
</font><font face="arial" size=2>(530) 401-8024</font><font size=3> 
<br>
</font><font face="arial" size=2 color="#0000FF"><u><a href="http://www.berkeleysolar.com/">www.berkeleysolar.com</a></u></font><font face="arial" size=2>
</font><font size=3> <br>
&nbsp;<br><br>
<hr>
</font><font face="tahoma" size=2><b>From:</b>
re-wrenches-bounces@lists.re-wrenches.org
[<a href="mailto:re-wrenches-bounces@lists.re-wrenches.org" eudora="autourl">mailto:re-wrenches-bounces@lists.re-wrenches.org</a>]
<b>On Behalf Of </b>William Miller<br>
<b>Sent:</b> Friday, November 13, 2009 12:04 AM<br>
<b>To:</b> RE-wrenches<br>
<b>Subject:</b> [RE-wrenches] Enphase installation details<br>
</font><font size=3><br>
Colleagues:<br><br>
We are in the middle of our first Enphase installation.&nbsp; I have been
working closely with the crew on this project and dedicated extra time
because we knew we needed to develop some new procedures to accommodate
the new technology.<br><br>
My most surprising realization is that with the Enphase inverters, the
roof-top wiring now has two levels of unprotected wiring, DC <i>and</i>
AC.&nbsp;&nbsp;&nbsp; I have been working on an analogy for the recent
evolution of PV wiring standards and the best I can come up with is that
the new norm is akin to wiring a rooftop air conditioning unit with SO
and USE.&nbsp; Flexible cords are more suited to portable, consumer
connectable appliances in non-harsh environments.<br><br>
We wrestled with two issues:&nbsp; How to secure the AC wiring with a
minimum 10 year longevity -- and how to secure the DC wiring with the
same life expectancy.&nbsp; In a previous career I worked in the
telecommunications industry.&nbsp; In a telcom facility we had access to
many layers of wire routing hardware and systems.&nbsp; The PV industry
has, in my opinion,&nbsp; largely ignored wire management.&nbsp;
Ironically, telecom wiring is low voltage in an industrial setting and we
can secure it systematically, whereas PV wiring is high voltage, often in
a residential setting, outdoors, in high temperature and wet conditions
and yet we are relegated to the ubiquitous and fragile cable tie as our
prime methodology.&nbsp; It is our corporate position that the plastic
cable tie can not be counted on for longer that two years in an under-PV
environment and, since we wire for a minimum 10 year life expectancy, the
plastic cable tie is not suitable.<br><br>
Over the course of two days we developed robust and efficient techniques
for securing the AC and DC wiring.&nbsp; I'd love to share our procedures
with this group, but due to extreme competition in our area, I must of
necessity keep any procedures that give us a competitive advantage
confidential.&nbsp; This is unfortunate as my inclination is to teach,
but it&nbsp; is a reality in this business climate.<br><br>
I hope the industry can eventually recognize some of these short
comings.&nbsp; The solar water industry died an early death because of
economic pressures and shoddy workmanship.&nbsp; It is possible that the
solar electric industry of today can suffer some of the same if we can't
preform to higher standards.<br><br>
William Miller<br><br>
<br>
<u>Please note new e-mail address and domain:<br><br>
</u>William Miller <br>
Miller Solar<br>
Voice :805-438-5600&nbsp;&nbsp;&nbsp;&nbsp; Fax:
805-438-4607<x-tab>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;</x-tab><br>
email: william@millersolar.com<br>
<a href="http://millersolar.com/" eudora="autourl">http://millersolar.com</a><br>
License No. C-10-773985<br>
_______________________________________________</font></blockquote></body>
</html>