<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=us-ascii">
<META content="MSHTML 6.00.6000.16890" name=GENERATOR></HEAD>
<BODY 
style="WORD-WRAP: break-word; -webkit-nbsp-mode: space; -webkit-line-break: after-white-space">
<DIV dir=ltr align=left><SPAN class=812130117-31072009><FONT face=Arial 
color=#0000ff size=2>Hi Bruce,</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=812130117-31072009><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN>&nbsp;</DIV>
<DIV dir=ltr align=left><SPAN class=812130117-31072009><FONT face=Arial 
color=#0000ff size=2>Unless you are leaving something meaningful out of your 
description, the AHJ is wrong. Your description is fine as far as the code goes. 
</FONT></SPAN><SPAN class=812130117-31072009><FONT face=Arial color=#0000ff 
size=2>I recommend installing a 100A main in the new 200A panel for local 
disconnect @ house. </FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=812130117-31072009><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN>&nbsp;</DIV>
<DIV dir=ltr align=left><SPAN class=812130117-31072009><FONT face=Arial 
color=#0000ff size=2>Leave 100A main &amp; feeder as-is (assuming safe, properly 
sized feeders, suitable grounding, etc.). There is nothing in the code that says 
you have to use identical size breaker to the buss rating. </FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=812130117-31072009><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN>&nbsp;</DIV>
<DIV dir=ltr align=left><SPAN class=812130117-31072009><FONT face=Arial 
color=#0000ff size=2>Try explaining it to the AHJ this way: Take the solar away 
from the question. </FONT></SPAN><SPAN class=812130117-31072009><FONT face=Arial 
color=#0000ff size=2>The 100A main breaker determines the MINIMUM rating of the 
feeders and busbars. The busbars and feeders determine the MAXIMUM rating of 
overcurrent devices.&nbsp;For example, using the AHJ logic, you would be 
prohibited from using a #2 for feeder conductors between the 100A main and the 
house&nbsp;because they are rated for up to 130A. Doesn't make any sense, 
huh?</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=812130117-31072009><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN>&nbsp;</DIV>
<DIV dir=ltr align=left><SPAN class=812130117-31072009><FONT face=Arial 
color=#0000ff size=2>The extra ampacity in the bussing is permitted and provides 
additional safety.</FONT></SPAN></DIV>
<DIV dir=ltr align=left><SPAN class=812130117-31072009><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN>&nbsp;</DIV>
<DIV dir=ltr align=left><FONT face=Arial><FONT size=2><FONT color=#0000ff><SPAN 
class=812130117-31072009>Best of luck!</SPAN><SPAN 
class=812130117-31072009></SPAN></FONT></FONT></FONT></DIV>
<DIV dir=ltr align=left><SPAN class=812130117-31072009><FONT face=Arial 
color=#0000ff size=2></FONT></SPAN>&nbsp;</DIV>
<DIV dir=ltr align=left><SPAN class=812130117-31072009></SPAN><FONT 
face=Arial><FONT color=#0000ff><FONT size=2>M<SPAN class=812130117-31072009>att 
Lafferty</SPAN></FONT></FONT></FONT><BR></DIV>
<DIV class=OutlookMessageHeader lang=en-us dir=ltr align=left>
<HR tabIndex=-1>
<FONT face=Tahoma size=2><B>From:</B> re-wrenches-bounces@lists.re-wrenches.org 
[mailto:re-wrenches-bounces@lists.re-wrenches.org] <B>On Behalf Of </B>Mendocino 
Solar Service<BR><B>Sent:</B> Friday, July 31, 2009 9:57 AM<BR><B>To:</B> 
RE-wrenches<BR><B>Subject:</B> [RE-wrenches] down-sizing main 
breaker<BR></FONT><BR></DIV>
<DIV></DIV>Hi Folks,
<DIV><BR></DIV>
<DIV>Can anyone provide code reference or advice on this question?</DIV>
<DIV>Our customer has 100 amp service at the meter pedestal, 100 amp main 
breaker feeding 200 foot underground run to a 100 amp panel at the house. We 
need to land a 40 amp breaker, so are proposing to replace main panel at house 
with 200 amp panel. The AHJ says we need a 200 amp main breaker in this panel, 
which will work, but says this requires upsizing the feeder, main breaker at 
meter, and therefore utility service to 200 amps.</DIV>
<DIV><BR></DIV>
<DIV>I've read on this list and elsewhere about downsizing the main breaker in a 
panel to create capacity to make the 120% rule. This AHJ says you can't put in a 
breaker smaller than the panel size, and furthermore, everything upstream would 
have to be upsized. Is this from the code?<BR><BR>
<DIV><SPAN class=Apple-style-span 
style="WORD-SPACING: 0px; FONT: 14px Palatino; TEXT-TRANSFORM: none; COLOR: rgb(0,0,0); TEXT-INDENT: 0px; WHITE-SPACE: normal; LETTER-SPACING: normal; BORDER-COLLAPSE: separate; orphans: 2; widows: 2; -webkit-border-horizontal-spacing: 0px; -webkit-border-vertical-spacing: 0px; -webkit-text-decorations-in-effect: none; -webkit-text-size-adjust: auto; -webkit-text-stroke-width: 0">
<DIV>Bruce Erickson</DIV>
<DIV>Mendocino Solar Service</DIV>
<DIV>PO Box 1252</DIV>
<DIV>Mendocino, CA 95460</DIV>
<DIV>707-937-1701</DIV>
<DIV><BR class=webkit-block-placeholder></DIV></SPAN><BR 
class=Apple-interchange-newline></DIV><BR></DIV></BODY></HTML>