<font size=3>Ken:<br><br>
I guess I'm overly optimistic in hoping that electrical engineers could
understand these concepts.&nbsp; Next time I'm sending in a modified
drawing without the genset.<br><br>
William<br><br>
<br>
At 04:47 AM 3/26/2009, you wrote:<br>
</font><blockquote type=cite class=cite cite><font face="arial" size=3>Morning
William,<br>
</font>&nbsp;<br>
<font face="arial" size=3><br>
</font>&nbsp;<br>
<font face="arial" size=3>As for 2, from our experience with the local
IOU, be careful when mentioning a motor-driven generator. They don't
understand that the XW can't sell that power--directly-- to the grid.
Since the cat is out of the bag, I think you'll need to show that the gen
set only charges the battery and passes thru the XW to the dedicated
loads.<br>
</font>&nbsp;<br>
<font face="arial" size=3>May be simpler not to mention generator?<br>
</font>&nbsp;<br>
<font face="arial" size=3>Ken<br>
</font>
<dl>
<dd>----- Original Message ----- <br>

<dd>From:</b> <a href="mailto:william@millersolar.com">William Miller</a>
<br>

<dd>To:</b> <a href="mailto:re-wrenches@lists.re-wrenches.org">RE-wrenches</a> <br>

<dd>Sent:</b> Thursday, March 26, 2009 2:12 AM<br>

<dd>Subject:</b> Re: [RE-wrenches] Battery based grid tie question.<br><br>

<dd>Colleagues:<br><br>

<dd>Interesting that this topic comes up at this time:<br><br>

<dd>1. We inherited a grid-tie project wherein an elderly client was sold an SW installation some years ago.&nbsp; Come to find out, the installer never filed anything with the utility.&nbsp; The client was caught recently back-feeding without permission by a meter reader and told to cease and desist.&nbsp; We filed an application with the utility thinking this was a long shot since the client's SW inverter did not have the requisite Grid-tie Interface (GTI).&nbsp; We have several GTIs sitting on the shelf, but the inverter does not have the proper interface so one could not be installed.&nbsp; Lo and behold, the utility approved this installation for interconnection.<br><br>

<dd>2. We have an application to the local utility (PG&amp;E) pending for a three XW installation with a motor-generator.&nbsp; We have received multiple communications from PG&amp;E doubting the acceptability of the XW system for use as a gird-tied battery-back up system.&nbsp; We are hoping that PG&amp;E accepts the listings from the various agencies and approves the project.<br>
<br>

<dd>Interesting that the old, non-complaint system receives swift approval but the latest and greatest gear hits a regulatory road block!&nbsp; We'll keep you posted.<br><br>

<dd>William Miller<br>