<html>
<body>
<font size=3>Colleagues:<br><br>
Of course, this dilemma has probably existed since the Romans bid on the
first chariot.&nbsp; You need to present a design to the client to prove
you have a plan in order to sell the job, but you can not prevent the
client from using your design to shop contractors.&nbsp; There is not a
lot you can do about this.&nbsp; I let these clients go without much
regret.&nbsp; If the client does not understand the ethics involved, or
is not ethical, I'd just as soon not work for them.<br><br>
It is a fine line on what documentation you present to the client.&nbsp;
We try to be generic during bidding and vert specific during
contracting.&nbsp; Once the client is ready to sign a contract, we want
it made clear exactly where the modules will be installed and specify any
exclusions.<br><br>
This discussion got me thinking about the cast iron pipe top-of-pole
mount problem discussed here recently.&nbsp; Someone suggested smashing
the customer's pipe and someone else wanted to tell the customer
off.&nbsp; I don't believe either idea is productive or
professional.&nbsp; My approach in similar situations is to remain calm,
present the dilemma and supporting documentation in writing and let the
customer decide:&nbsp; Does he want the job done properly with your
services or improperly without your services.&nbsp; I have observed a few
structural engineers and other professionals that exhibit a very
professional demeanor and I have used them as role models.&nbsp; These
are the men/women that earn good money and are above reproach.&nbsp; This
is the reputation I want to cultivate.<br><br>
Respectfully,<br><br>
William Miller<br><br>
&nbsp;<br><br>
<br><br>
<blockquote type=cite class=cite cite>&gt;You guessed<br>
&gt; it, they showed our detailed proposal to the other firm who then
proposed<br>
&gt; the exact same system we proposed, item for item, except they
lowered<br>
&gt; their price about 1/2%.&nbsp;&nbsp;&nbsp; Yes, we lost the 
job.<br>
&gt;<br>
&gt; No, its not only not a good idea to give out this cost information,
but<br>
&gt; its also not a good idea to give out a detailed parts list
breakout.&nbsp; If<br>
&gt; the client wants another bid, then go for it, only let the
competition<br>
&gt; have to go to the same trouble you did to figure out what parts and
sizes<br>
&gt; of equipment will be needed.</font></blockquote></body>
</html>