<br><br><div class="gmail_quote"><blockquote class="gmail_quote" style="border-left: 1px solid rgb(204, 204, 204); margin: 0pt 0pt 0pt 0.8ex; padding-left: 1ex;"><br>I have come to a conclusion:&nbsp; Utility companies serve two (2) purposes: 1) To safely and profitably distribute electrical power and 2) To drive PV integrators insane.&nbsp; <br>
<br>The particular utility of which I speak, Allegheny Power, was responsible for convincing the Maryland PUC for requiring External Disconnect Switches on PV installs if they are to be eligible for REC generation.&nbsp; Now they have finally gotten around to inspecting a system we installed a year ago where the EDS was located on the opposite side of the house from the meter (we made our interconnection at a sub-panel) and they are requiring us to move it back to the meter location (or install a 200A external service disconnect).<br>

<br>Does anyone know of any documentation from a utility or AHJ that accepts a weatherproof label (or plack) on the meter indicating the location of the EDS when it is not convienient for the meter and EDS to be co-located?<br>

<br><br>Andrew Truitt<br>Standard Solar Inc.<br><font color="#888888"><br><br clear="all"><br>-- <br>&quot;Don&#39;t get me wrong: I love nuclear energy! It&#39;s just that I prefer fusion to fission. And it just so happens that there&#39;s an enormous fusion reactor safely banked a few million miles from us. It delivers more than we could ever use in just about 8 minutes. And it&#39;s wireless!&quot;<br>

<br>~William McDonough<br><br>
</font></blockquote></div><br><br clear="all"><br><br>