<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=Content-Type content="text/html; charset=iso-8859-1">
<META content="MSHTML 6.00.6000.16788" name=GENERATOR>
<STYLE></STYLE>
</HEAD>
<BODY bgColor=#ffffff>
<DIV><FONT face="Century Schoolbook">Oncor (one of distribution&nbsp;companies 
of the Texas dereg'd utility)&nbsp;allows placement on exterior at any location 
provided there is a permanent directory plaque (sign, tag, placard, etc.) that 
clearly shows&nbsp;that location. Ken Brunkenhofer (you didn't get that name 
from me) is contact at Oncor. If you will contact me off-list, I can send the 
examples they sent me.</FONT></DIV>
<DIV><FONT face=Arial size=2>Holt E. Kelly<BR>Holtek Fireplace &amp; Solar 
Products<BR>500 Jewell Dr.<BR>Waco,Tx. 76712<BR>254-751-9111<BR>254-228-9621 
(cell)<BR><A href="mailto:holtek@sbcglobal.net">holtek@sbcglobal.net</A><BR><A 
href="http://www.holteksolar.com">www.holteksolar.com</A><BR></FONT></DIV>
<BLOCKQUOTE 
style="PADDING-RIGHT: 0px; PADDING-LEFT: 5px; MARGIN-LEFT: 5px; BORDER-LEFT: #000000 2px solid; MARGIN-RIGHT: 0px">
  <DIV style="FONT: 10pt arial">----- Original Message ----- </DIV>
  <DIV 
  style="BACKGROUND: #e4e4e4; FONT: 10pt arial; font-color: black"><B>From:</B> 
  <A title=atruitt@gmail.com href="mailto:atruitt@gmail.com">Andrew Truitt</A> 
  </DIV>
  <DIV style="FONT: 10pt arial"><B>To:</B> <A 
  title=re-wrenches@lists.re-wrenches.org 
  href="mailto:re-wrenches@lists.re-wrenches.org">RE-wrenches</A> </DIV>
  <DIV style="FONT: 10pt arial"><B>Sent:</B> Tuesday, January 13, 2009 1:09 
  PM</DIV>
  <DIV style="FONT: 10pt arial"><B>Subject:</B> Re: [RE-wrenches] Interstate 
  Batteries</DIV>
  <DIV><BR></DIV><BR>I have come to a conclusion:&nbsp; Utility companies serve 
  two (2) purposes: 1) To safely and profitably distribute electrical power and 
  2) To drive PV integrators insane.&nbsp; <BR><BR>The particular utility of 
  which I speak, Allegheny Power, was responsible for convincing the Maryland 
  PUC for requiring External Disconnect Switches on PV installs if they are to 
  be eligible for REC generation.&nbsp; Now they have finally gotten around to 
  inspecting a system we installed a year ago where the EDS was located on the 
  opposite side of the house from the meter (we made our interconnection at a 
  sub-panel) and they are requiring us to move it back to the meter location (or 
  install a 200A external service disconnect).<BR><BR>Does anyone know of any 
  documentation from a utility or AHJ that accepts a weatherproof label (or 
  plack) on the meter indicating the location of the EDS when it is not 
  convienient for the meter and EDS to be co-located?<BR><BR><BR>Andrew 
  Truitt<BR>Standard Solar Inc.<BR><BR><BR clear=all><BR>-- <BR>"Don't get me 
  wrong: I love nuclear energy! It's just that I prefer fusion to fission. And 
  it just so happens that there's an enormous fusion reactor safely banked a few 
  million miles from us. It delivers more than we could ever use in just about 8 
  minutes. And it's wireless!"<BR><BR>~William McDonough<BR><BR>
  <P>
  <HR>

  <P></P>_______________________________________________<BR>List sponsored by 
  Home Power magazine<BR><BR>List Address: 
  RE-wrenches@lists.re-wrenches.org<BR><BR>Options &amp; 
  settings:<BR>http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org<BR><BR>List-Archive: 
  http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org<BR><BR>List 
  rules &amp; etiquette:<BR>www.re-wrenches.org/etiquette.htm<BR><BR>Check out 
  participant 
bios:<BR>www.members.re-wrenches.org<BR><BR></BLOCKQUOTE></BODY></HTML>