<html><head><style type="text/css"><!-- DIV {margin:0px;} --></style></head><body><div style="font-family:times new roman,new york,times,serif;font-size:12pt"><div style="font-family: times new roman,new york,times,serif; font-size: 12pt;"><div style="font-family: times new roman,new york,times,serif; font-size: 12pt;"><div class="Section1"><p><span style="font-size: 10pt; font-family: &quot;Arial&quot;,&quot;sans-serif&quot;;">Wreches,</span></p><p><br><span style="font-size: 10pt; font-family: &quot;Arial&quot;,&quot;sans-serif&quot;;"></span></p><p><span style="font-size: 10pt; font-family: &quot;Arial&quot;,&quot;sans-serif&quot;;">I have a system where we are tapping onto the bus bars of a 1200 amp panel fed by a 1200 amp main breaker.&nbsp; The easy place to tap onto the bus bars is the load side of the breaker using the existing bolts.<br></span></p><p><span style="font-size: 10pt; font-family:
 &quot;Arial&quot;,&quot;sans-serif&quot;;"><br></span></p><p><span style="font-size: 10pt; font-family: &quot;Arial&quot;,&quot;sans-serif&quot;;">The inverter and utility fused disco are about 200 ft away, and the tap conductors travel about15ft in EMT conduit before leaving the building.&nbsp; After that the circuit is outdoors.&nbsp; NEC 240.21(B)5 allows taps of unlimited length for conductors located outside of a building, except at the point of load (in this case supply) termination.&nbsp; <br></span></p><p><span style="font-size: 10pt; font-family: &quot;Arial&quot;,&quot;sans-serif&quot;;"><br></span></p><p><span style="font-size: 10pt; font-family: &quot;Arial&quot;,&quot;sans-serif&quot;;">Can 20ft of conductor inside the building be covered by being "at the point of load termination", or do I have to comply with NEC 240.21(B)2 and have an OCPD within 25'?</span></p><p><br><span style="font-size: 10pt; font-family:
 &quot;Arial&quot;,&quot;sans-serif&quot;;"></span></p><p><span style="font-size: 10pt; font-family: &quot;Arial&quot;,&quot;sans-serif&quot;;">The construction foreman for this project is buddies with the inspector, so getting a signed permit won't be a problem but I want this to be a code compliant system.&nbsp; Can anyone lend some insight to the spirit of 240.21(B)2 and 5?</span></p><p><br><span style="font-size: 10pt; font-family: &quot;Arial&quot;,&quot;sans-serif&quot;;"></span></p><p><span style="font-size: 10pt; font-family: &quot;Arial&quot;,&quot;sans-serif&quot;;">Sorry if this has been discussed before, but searching didn't yield any results.</span></p><p><br><span style="font-size: 10pt; font-family: &quot;Arial&quot;,&quot;sans-serif&quot;;"></span></p><p><span style="font-size: 10pt; font-family: &quot;Arial&quot;,&quot;sans-serif&quot;;">Best,</span></p><p><span style="font-size: 10pt; font-family:
 &quot;Arial&quot;,&quot;sans-serif&quot;;">Jerry Caldwell</span></p><p><span style="font-size: 10pt; font-family: &quot;Arial&quot;,&quot;sans-serif&quot;;">Recurrent Energy<br></span></p> 

</div>

</div></div></div><br>

      </body></html>