<html><head><style type='text/css'>p { margin: 0; }</style></head><body><div style='font-family: Times New Roman; font-size: 12pt; color: #000000'><P>It all depends on the homeowners expectations (and what THEY think is a reasonable critical load).&nbsp; Your scheme looks like it would work - (I might include a second X-fer switch to run the inverter supported loads off the genny if the grid AND the inverter are out).</P>
<P>&nbsp;</P>
<P>Second issue is transfer speed and power drop out.&nbsp; I am not sure of the XW, but I have found that outback is a very quick and clean switch (no computer/com drops) from grid to backup... like a UPS.&nbsp; However... it is NOT as smooth when turning off the genny on back up mode.&nbsp; Lights all fade as genny coughs off and inverter kicks back over to batts.&nbsp; I always make sure customer computer has a deadicated UPS.<BR><BR></P>
<DIV>For a brighter energy future,<BR><BR>Geoff Greenfield<BR>Founder and CEO<BR><FONT size=4><STRONG>Third Sun Solar &amp; Wind Power Ltd.<BR></STRONG></FONT>340 West State Street, Unit 25<BR>Athens, OH 45701<BR><BR>740.597.3111 &nbsp; &nbsp; Fax 740.597.1548<BR>www.Third-Sun.com<BR><BR><EM><FONT size=4>Clean Energy - Expertly Installed<BR></FONT></EM><BR><BR><BR><BR></DIV><BR><BR>----- "William Miller" &lt;wrmiller@charter.net&gt; wrote: <BR>&gt; Friends:<BR>&gt; I am bidding an installation in which the customer owns a whole house <BR>&gt; generator. &nbsp;The generator is 30 KVA and we will be installing a 4.5 or 6.0 <BR>&gt; KVA XW system. &nbsp;Obviously, the inverter will not power the entire <BR>&gt; house. &nbsp;If we segregate the non-critical loads and connect them to a <BR>&gt; grid-fed panel, the generator will not power them. &nbsp;If we let the generator <BR>&gt; run every time there is an outage, this negates the need for a inverter <BR>&gt; system. What to do?<BR>&gt; The transfer switch sends a two wire start signal to the generator upon a <BR>&gt; grid outage. &nbsp;After the transfer switch senses generator voltage, it <BR>&gt; effects a transfer.<BR>&gt; My brainstorm is to intercept that two wire start signal. &nbsp;I will connect <BR>&gt; it instead to the XW inverter. &nbsp;We will segregate the loads, feeding the <BR>&gt; critical loads from the XW and the Non-critical loads from the output of <BR>&gt; the transfer switch. &nbsp;In the case of a grid outage, the critical loads will <BR>&gt; receive uninterrupted power. &nbsp;The Non-critical loads will not have power <BR>&gt; unless the generator is started by the XW. &nbsp;Once the XW (or the home owner) <BR>&gt; starts the generator, the transfer will occur. &nbsp;We will put a control panel <BR>&gt; in the house so the home-owner can start the generator if the No-critical <BR>&gt; loads are needed.<BR>&gt; This seems clever to me, but I am biased. &nbsp;Am I missing something???<BR>&gt; William Miller<BR>&gt; _______________________________________________<BR>&gt; List sponsored by Home Power magazine<BR>&gt; List Address: RE-wrenches@lists.re-wrenches.org<BR>&gt; Options &amp; settings:<BR>&gt; http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org<BR>&gt; List-Archive: http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org<BR>&gt; List rules &amp; etiquette:<BR>&gt; www.re-wrenches.org/etiquette.htm<BR>&gt; Check out participant bios:<BR>&gt; www.members.re-wrenches.org</div></body></html>