<html><P>If trying the link that Bill supplied does not fully swing the LJO over to reason try my tactic that has yet to fail me - I explain that&nbsp;virtually all&nbsp;structures built in the last 30 years or so have engineered roofs to handle both Live and Dead Loads, typically the Live Load is in excess of 12 p/s.f. and is in addition to the Dead Load. The Live Load is for temperary loads such as workers and materials. My pitch is simple; once I have placed my 3-4 p/s.f. of glass over the roof it has eliminated that area for any live loads, because we do not walk, stand or place heavy materials on our arrays. In essense I have eliminated the potential for Live Loads of &gt;12 p/s.f. with &lt;4p/s.f. of array. This blatant logic has yet to be&nbsp;balked at&nbsp;except in cases of some commercial projects and older buildings. Also in many jurisdictions one is allowed to put a second layer of shingles over the 1st w/o removal of the original and w/o Engineering, if this is your case and the second layer has not been installed then this argument can also work as our arrays are a fraction of the weight of most any roofing system.</P>
<P>Good luck!</P>
<P>&nbsp;</P>
<P>-jeff o<BR><BR><BR>From the Solar, Wind and Hydro powered office of Jeff Oldham/Regenerative SOLutions</P></html>
<font face=Times-New-Roman size=2><br><br>_____________________________________________________________<br><a href="http://thirdpartyoffers.juno.com/TGL2112/fc/Ioyw6iiedABdtqcc8B9fhSMLywi44LwnGJ4hcWx5C0uorIINrEXPn1/?count=1234567890" target=_blank>Click here to find the perfect picture with our powerful photo search features.</a><br></font>