<div dir="ltr"><div dir="ltr">Personally, I've never had much luck with pre-engineered stamped designs from the manufacturers.  Aside from pole mounts, they all tend to stop at way too low of tilt for my situations (I generally try for 45 to 55 degree tilt, off grid and/or snow shedding).  So, I have tended to just design the groundmount to my desires that's a modification of the normal manufacturer ones with my own addditions and get a wet stamp for each project.  Usually comes in under $400 with the engineer I've been using for years.  While most of these end up with a sea of little concrete piers, he's also done ones attached to a slab poured on top of the ground, to a layer of parking lot bumpers, bolted to large rocks ("large" being 10' to entire mountain size), and bolted to concrete beams poured on top of the ground.  Also, he is very amenable to using driven ground anchors to add additional uplift resistance (we are usually dealing with 170mph design wind load).  He doesn't require a soil study to use those (probably just bases it off the minimum pullout in sandy soil).</div><div dir="ltr"><br></div><div>Getting anything done through permitting in a 2 week timeframe seems difficult though... </div><div dir="ltr"><br></div><div>Zeke</div><br><div><br clear="all"></div><br><span class="gmail_signature_prefix">-- </span><br><div dir="ltr" class="gmail_signature"><div dir="ltr"><div><div dir="ltr">Zeke Yewdall<div>PV Engineer</div><div>NABCEP #031508-89</div><div><a href="mailto:zeke@darkforestsolar.com" target="_blank">zeke@darkforestsolar.com</a></div><div>303-523-3592</div></div></div></div></div></div>