<div dir="auto"><div>I had a thought. What about just backing up one of the two 200A panels with an off-the-shelf residential MID, and install an automatic transfer switch on the other 200A panel with the primary source being the grid, and auxiliary source being the inverter output, possibly through a feeder from the first 200A panel. </div><div dir="auto"><br></div><div dir="auto">This would allow backup of all loads on a single 200A MID. I would comply with 710.15(A) (NEC 2020) without any required load management. </div><div dir="auto"><br></div><div dir="auto">Better yet, make the auxiliary source for the second 200A panel a feeder from a smart load breaker in the MID for load management purposes. The EG4 GridBOSS can send a 125A feeder to the other panel. That would be more than sufficient for practical purposes in a grid outage. </div><div><br></div><div data-smartmail="gmail_signature"><div dir="ltr"><br>Jason Szumlanski<div><span style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px">Principal Solar Designer | Florida Solar Design Group</span><br style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px"><span style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px">NABCEP Certified Solar Professional (PVIP)</span><br style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px"><span style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px">Florida State Certified Solar Contractor CVC56956</span></div><div><font color="#333333" face="Roboto, RobotoDraft, Helvetica, Arial, sans-serif">Florida Certified Electrical Contractor EC13013208</font></div></div></div></div><br><div class="gmail_quote gmail_quote_container"><div dir="ltr" class="gmail_attr">On Thu, Feb 5, 2026, 8:48 AM Jay <<a href="mailto:jay.peltz@gmail.com">jay.peltz@gmail.com</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div dir="auto"><div dir="ltr"></div><div dir="ltr">I reread your question. </div><div dir="ltr"><br></div><div dir="ltr">I think the only way to be sure the internal transfer switches in the inverters all switch at the same time on a big high load ( exceeding potentially the max current rating of a single relay) multi stack inverter system is to use external transfer switch’s. </div><div dir="ltr"><br></div><div dir="ltr">The system I installed is never going to exceed 200 amps, probably never exceed 80 amps. 2 inverters can more than handle the load. The 3rd was installed as built in redundancy to make it easier in case one fails. As the system won’t run on 1.  So I didn’t have to worry about exceeding relay capacity. </div><div dir="ltr"><br></div><div dir="ltr">I think this is one of the potential problems with paralleled systems vs larger single 120/240 inverter’s which we don’t really have here in the US. </div><div dir="ltr"><br></div><div dir="ltr"><br></div><div dir="ltr"><br><blockquote type="cite">On Feb 4, 2026, at 7:05 PM, Jay <<a href="mailto:jay.peltz@gmail.com" target="_blank" rel="noreferrer">jay.peltz@gmail.com</a>> wrote:<br><br></blockquote></div><blockquote type="cite"><div dir="ltr"><div dir="ltr"></div><div dir="ltr">I have a 3 stack eg4 18k and while watching the inverters online they are totally balanced. </div><div dir="ltr"><br></div><div dir="ltr">Jay </div><div dir="ltr"><br><blockquote type="cite">On Feb 4, 2026, at 4:29 PM, Jason Szumlanski via RE-wrenches <<a href="mailto:re-wrenches@lists.re-wrenches.org" target="_blank" rel="noreferrer">re-wrenches@lists.re-wrenches.org</a>> wrote:<br><br></blockquote></div><blockquote type="cite"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">Hi all,</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">When backing up a 400A service with multiple paralleled all-in-one inverters by combining the AC inputs and outputs, the individual inverter transfer switches must operate in a synchronized manner. Come to think of it, the same thing applies to backing up 200A service with paralleled inverters. Are these tested for this function? – I assume so.</div></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">I'm really asking because Sol-Ark seems to be the only brand that specifically addresses 400A service in documentation, although not very clearly in the manual itself. Their training and literature support passing through additive grid pass-through with multiple inverters, which implies that they are additive in their ability to transfer power. See attached examples.</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">I have not found anything from EG4 (for the 18kPV) or the Midnite AIO that specifically addresses this. </div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">In other words, how can we assume that paralleled inverters will be additive in terms of their ability to transfer high levels of current that exceed the rating of a single unit? Is that even addressed in listings? The documentation is quite poor from all manufacturers (no surprise there!)</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">I do have a couple of grid-interactive Midnite AIO systems with four paralleled AIOs backing up 400A services, and so far, so good. My engineer signed off on that.</div><div><br></div><div><br></div><div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">Jason Szumlanski</div><br></div><div><br></div><div><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><b><div style="text-align:center"><table border="0" cellpadding="0" cellspacing="0" style="color:rgb(34,34,34);font-weight:400;text-align:start;font-family:"helvetica neue",helvetica,arial,sans-serif"><tbody><tr><td rowspan="2"><a href="http://www.floridasolardesigngroup.com/" style="color:rgb(17,85,204)" target="_blank" rel="noreferrer"></a></td></tr></tbody></table></div></b></div></div></div></div></div></div></div></div><img width="0" height="0" alt="" style="display:flex"></div>
</div>
<div><Image 1171.jpg></div><div><Image 1172.jpg></div><span>_______________________________________________</span><br><span>List sponsored by Redwood Alliance</span><br><span></span><br><span>Pay optional member dues here: <a href="http://re-wrenches.org" target="_blank" rel="noreferrer">http://re-wrenches.org</a></span><br><span></span><br><span>List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org" target="_blank" rel="noreferrer">RE-wrenches@lists.re-wrenches.org</a></span><br><span></span><br><span>Change listserver email address & settings:</span><br><span><a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" target="_blank" rel="noreferrer">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a></span><br><span></span><br><span>There are two list archives for searching. When one doesn't work, try the other:</span><br><span><a href="https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/" target="_blank" rel="noreferrer">https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/</a></span><br><span><a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org" target="_blank" rel="noreferrer">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a></span><br><span></span><br><span>List rules & etiquette:</span><br><span><a href="http://www.re-wrenches.org/etiquette.htm" target="_blank" rel="noreferrer">http://www.re-wrenches.org/etiquette.htm</a></span><br><span></span><br><span>Check out or update participant bios:</span><br><span><a href="http://www.members.re-wrenches.org" target="_blank" rel="noreferrer">http://www.members.re-wrenches.org</a></span><br><span></span><br></div></blockquote></div></blockquote></div></blockquote></div>