<div dir="ltr"><div dir="ltr"><div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">It shouldn't be too hard in a partial backup situation to check for inadvertent N-G bonds on the load side of your new protected load panel. I would just shut the power off and remove all of the load neutrals from the neutral bar and check for continuity to ground.</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">I would not remove the N-G bond in your solar combiner panel, which contains what is effectively a second service disconnect. I would remove the GEC from that circuit, as it creates a parallel return path. The GEC only needs to come from one location on the supply side of the service disconnecting means. By keeping the N-G bond in the solar combiner panel, the neutral wire will carry any fault current to the GEC, which is acceptable in this case. It's effectively the same as having the GEC originating from a wiring trough ahead of the service disconnecting means, or as we do in Florida, the GEC comes from the meter enclosure, and all downstream service disconnects are bonded.</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">In other words, no GEC or EGC is required to the solar combiner panel. Just L1, L2, and N in non-metallic conduit.</div><br clear="all"></div><div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">I haven't seen this issue with the AIO, but I have seen it with the Sol-Ark inverters, which seem particularly picky about bonding issues (perhaps rightfully so). </div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">On another note, why the supply side interconnection? It's my understanding that the AIO is listed as a Power Control System. I haven't used it that way, and the details in the manual are weak, but I believe it can be done. I would have considered a 125A load side feeder from the main service panel (if you are moving loads out to a protected load panel anyway, there would be physical space for a breaker). You could even run a 200A feeder to the AIOs to get a full 200A passthrough with dual inverters and move over even more loads and use the smart load capabilities. </div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">With that said, I rarely do partial home backup in these situations. I know you said it's a small subset of loads, which is reasonable given the battery capacity, so that might make perfect sense. Depending on the circumstances, sometimes it's just easier to put a new service disconnect ahead of the inverters and make the existing main service panel a subpanel, and then remove non-backup loads and put them on smart load circuits or otherwise do load shedding. It increases the owner's flexibility to back up anything they want in the house selectively.</div><br></div><div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">One more thing. It looks like you have all PV circuits running through J-Box "B." There was some talk recently about cross-talk between multiple RSD transmitters that can make things go south if you have circuits from different transmitters in close proximity. I have not seen that problem in practice, but I have started to isolate my raceways and enclosures in multiple inverter setups.</div><br></div><div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">Enough unsolicited advice... I would start with removing that GEC and see if it fixes the problem, and if not, investigate for inadvertent load side bonds.</div><br></div><div><br></div><div><div dir="ltr" class="gmail_signature"><div dir="ltr">Jason Szumlanski<div><span style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px">Principal Solar Designer | Florida Solar Design Group</span><br style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px"><span style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px">NABCEP Certified Solar Professional (PVIP)</span><br style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px"><span style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px">Florida State Certified Solar Contractor CVC56956</span></div><div><font color="#333333" face="Roboto, RobotoDraft, Helvetica, Arial, sans-serif">Florida Certified Electrical Contractor EC13013208</font></div></div></div></div><br></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Fri, Oct 24, 2025 at 8:50 PM Dave Tedeyan via RE-wrenches <<a href="mailto:re-wrenches@lists.re-wrenches.org" target="_blank">re-wrenches@lists.re-wrenches.org</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><div dir="ltr">Thanks all for your thoughts here. It seems that the general consensus so far is that the N-G should be bonded in the solar main disconnecting means when doing a supply side connection (even if it is not technically a separate service). When talking with Midnite Power, we made it very clear that we were talking about a N-G bond in the inverter combiner / solar main disconnect, and not the backed up loads panel. And being that NY is still on 2017 code (only going to 2020 next year), with the ambiguity in the code I am probably okay to undo the N-G connection in the main solar disconnect.<div><br></div><div>In this case specifically, we are backing up only a small subset of loads in the house. The reason for the two inverters is because there is about 24kw of solar. There is also a manual transfer switch to normally be able to power the loads off the inverters, but to be able to switch to powering the loads off the main panel in case of service needed on the inverters. The neutrals in this system are all connected together, and I am not sure if that could cause issues. It is probably difficult to explain all the details in words, so I am copying part of the three line diagram here. The second picture is the conductor and conduit schedule.</div><div><br></div><div>Tom, I get it that the error sounds like it is on the DC side based on the words, but when I talked to Midnite about it they were pretty clear about it being due to multiple N-G bonds and they did not mention that it could have anything to do with the DC side.</div><div><br></div><div>Jason, that is a good idea as well to check the loads that got moved over to see if there are any other inadvertent N-G bonds on the premises. This also similar to what Midnite suggested, which was to lift the N-G bond in the main panel and then see if they are still bonded somewhere else. It seems like it can be a slow process to track that down with power cut to the house, but that might be what I have to try if removing the N-G bond in the solar main disconnect does not help.</div><div><br></div><div>So, my main questions to anyone who has an opinion here are two fold:</div><div>1. Do you bond the N-G in general in the main solar disconnect for a supply side connection?</div><div>2. Specifically with the Midnite AIO inverters, has anyone else had issues with this "CA-DC link Overvoltage error" due to having a second N-G bond in the house? (one in the main service panel, and one in the solar main disconnect if it is a supply side connection). Or have you seen this error and found that it was caused by something else?</div><div><br></div><div>Cheers,</div><div>Dave</div><div><br></div><div><br></div></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Thu, Oct 23, 2025 at 5:25 PM Jason Szumlanski via RE-wrenches <<a href="mailto:re-wrenches@lists.re-wrenches.org" target="_blank">re-wrenches@lists.re-wrenches.org</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><div dir="ltr"><div dir="ltr"><div><div style="font-family:arial,helvetica,sans-serif">I agree. It is not a separate service. It is a "tap" of the existing service (I use that term loosely here). The additional service disconnect for the supply side interconnection should have L1, L2, and N connected ahead of the premises main disconnect with no EGC. There should be a N-G bonding jumper in the PV service disconnect. Then there should be no N-G bonds downstream of both the premises main disconnect and the PV service disconnect.</div><div style="font-family:arial,helvetica,sans-serif"><br></div><div style="font-family:arial,helvetica,sans-serif">Basically, it's the same as two main disconnects running from a meter enclosure. Each of the service disconnects has a N-G bond required.</div><div style="font-family:arial,helvetica,sans-serif"><br></div><div style="font-family:arial,helvetica,sans-serif">Some AHJs (the crazy ones) require an EGC between the enclosure where the supply side connection is made and the PV service disconnect. This creates a parallel fault path, and should not be allowed, in my humble opinion.</div></div><div><br></div><div><div style="font-family:arial,helvetica,sans-serif">Now it sounds like you might be doing a partial home backup. The issue there is that sometimes the loads or enclosures you moved over the backup load panel have inadvertent N-G bonds. Sometimes it's as simple as someone who got creative and used a ground as a neutral in a switch box. I say simple, but that can be hard to track down.</div><br></div><div><div style="font-family:arial,helvetica,sans-serif">When Midnite <span style="font-family:Arial,Helvetica,sans-serif">said to remove it from the inverter distribution panel, they were probably talking about the protected loads panel.</span></div><div style="font-family:arial,helvetica,sans-serif"><span style="font-family:Arial,Helvetica,sans-serif"><br></span></div><div style="font-family:arial,helvetica,sans-serif"><span style="font-family:Arial,Helvetica,sans-serif">I think more information is needed.</span></div><br></div><div><br></div><div><div dir="ltr" class="gmail_signature"><div dir="ltr"><br>Jason Szumlanski<div><span style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px">Principal Solar Designer | Florida Solar Design Group</span><br style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px"><span style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px">NABCEP Certified Solar Professional (PVIP)</span><br style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px"><span style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px">Florida State Certified Solar Contractor CVC56956</span></div><div><font color="#333333" face="Roboto, RobotoDraft, Helvetica, Arial, sans-serif">Florida Certified Electrical Contractor EC13013208</font></div></div></div></div><br></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Thu, Oct 23, 2025 at 11:03 AM Tyrone Houck via RE-wrenches <<a href="mailto:re-wrenches@lists.re-wrenches.org" target="_blank">re-wrenches@lists.re-wrenches.org</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><div dir="auto"><div>My interpretation, and the way it was explained to me by both Ryan Mayfield and Kyle Bolger(several years ago at this point, popular opinion may have changed since). Is that it is not a seperate service.</div><div dir="auto"> It is however required to have a ground-neutral bond( though in my opinion pointless and redundant as there is a bond in the enclosure where the tap is made). If it gives you any issue, ensure as close to equal potential to the grounding electrode as possible(and make sure your neutral is appropriately sized). I personally don't see the point but it is an NEC requirement </div><div><br></div><div><br>    </div></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Thu, Oct 23, 2025, 6:08 AM Dave Tedeyan via RE-wrenches <<a href="mailto:re-wrenches@lists.re-wrenches.org" rel="noreferrer" target="_blank">re-wrenches@lists.re-wrenches.org</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><div dir="ltr"><div>Hi All, </div><div><br></div><div>For years I have understood that when doing a supply side connection, you are supposed to bond the neutral to ground in the solar service disconnect. I have a Midnite AIO system with two inverters (set up as a supply side connection) that recently was getting a CA-DC link Overvoltage error. When talking to Midnite, their first response was to make sure that there was only one N-G bond in the whole system. When I mentioned that the solar is a separate service and thus there is a N-G bond in both the main panel and the inverter distribution panel, they said to remove it from the inverter distribution panel. I want to make the system work right, but I also am hesitant to do something against how I have understood the NEC to be for a long time. I am curious if you all have thoughts on this or run into a similar situation.</div><div><br></div><div>Cheers, </div><div>Dave</div><div><br></div><span class="gmail_signature_prefix">-- </span><br><div dir="ltr" class="gmail_signature"><div dir="ltr"><br style="color:rgb(34,34,34)"><div dir="ltr" style="color:rgb(34,34,34)"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"></div></div></div><div dir="ltr"><table cellpadding="0" cellspacing="0" style="border-spacing:0px;border-collapse:collapse;color:rgb(68,68,68);width:525px;font-size:11pt;font-family:Arial,sans-serif"><tbody><tr><td width="125" valign="top" rowspan="6" style="padding:0px 10px 0px 0px;font-size:10pt;border-right:1px solid rgb(236,189,0);width:125px;vertical-align:top"><a href="https://www.sungineersolar.com/" style="color:rgb(51,122,183);background-color:transparent" rel="noreferrer noreferrer" target="_blank"><img border="0" alt="Logo" width="105" src="https://sungineersolar.com/wp-content/uploads/2019/08/Logo-Image-Only-1.png" style="border: 0px; vertical-align: middle; width: 105px; height: auto;"></a></td><td style="padding:0px 0px 0px 10px"><table cellpadding="0" cellspacing="0" style="border-spacing:0px;border-collapse:collapse;background-color:transparent"><tbody><tr><td valign="top" style="padding:0px 0px 5px 10px;width:400px;vertical-align:top"><span style="color:rgb(236,189,0);font-size:11pt;font-weight:700">Dave Tedeyan, P.E.<br></span><span style="font-size:11pt;font-weight:700"><font color="#ecbd00">Owner | Sungineer Solar</font><br></span></td></tr><tr><td valign="top" style="padding:5px 0px 5px 10px;font-size:10pt;vertical-align:top;line-height:17px"><span style="color:rgb(236,189,0)"><span style="font-weight:700">p: </span></span><span style="font-size:10pt;color:rgb(0,0,0)">he | him | his</span><span style="color:rgb(236,189,0)"><span style="font-weight:700"><br>a: </span></span><span style="font-size:10pt;color:rgb(0,0,0)"><a href="https://www.google.com/maps/search/1653+Slaterville+Rd.+%C2%A0+%7C%C2%A0Ithaca,+NY+14850?entry=gmail&source=g" rel="noreferrer" target="_blank">1653 Slaterville Rd.</a></span><a href="https://www.google.com/maps/search/1653+Slaterville+Rd.+%C2%A0+%7C%C2%A0Ithaca,+NY+14850?entry=gmail&source=g" rel="noreferrer" target="_blank"> </a><span style="font-size:10pt;color:rgb(0,0,0)"><a href="https://www.google.com/maps/search/1653+Slaterville+Rd.+%C2%A0+%7C%C2%A0Ithaca,+NY+14850?entry=gmail&source=g" rel="noreferrer" target="_blank">| Ithaca, NY 14850</a></span><br><span style="color:rgb(236,189,0)"><span style="font-weight:700">w:</span></span><a href="http://www.sungineersolar.com/" rel="noopener noreferrer noreferrer" style="color:rgb(51,122,183);background-color:transparent" target="_blank"><span style="font-size:10pt;color:rgb(0,0,0)"> www.sungineersolar.com</span></a><br><span style="color:rgb(236,189,0)"><span style="font-weight:700">c:</span></span><span style="font-size:10pt;color:rgb(0,0,0)"> (607) 270-0370</span></td></tr></tbody></table></td></tr></tbody></table></div></div></div></div></div></div>
_______________________________________________<br>
List sponsored by Redwood Alliance<br>
<br>
Pay optional member dues here: <a href="http://re-wrenches.org" rel="noreferrer noreferrer noreferrer" target="_blank">http://re-wrenches.org</a><br>
<br>
List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org" rel="noreferrer noreferrer" target="_blank">RE-wrenches@lists.re-wrenches.org</a><br>
<br>
Change listserver email address & settings:<br>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" rel="noreferrer noreferrer noreferrer" target="_blank">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br>
<br>
There are two list archives for searching. When one doesn't work, try the other:<br>
<a href="https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/" rel="noreferrer noreferrer noreferrer" target="_blank">https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/</a><br>
<a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org" rel="noreferrer noreferrer noreferrer" target="_blank">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a><br>
<br>
List rules & etiquette:<br>
<a href="http://www.re-wrenches.org/etiquette.htm" rel="noreferrer noreferrer noreferrer" target="_blank">http://www.re-wrenches.org/etiquette.htm</a><br>
<br>
Check out or update participant bios:<br>
<a href="http://www.members.re-wrenches.org" rel="noreferrer noreferrer noreferrer" target="_blank">http://www.members.re-wrenches.org</a><br>
<br>
</blockquote></div>
_______________________________________________<br>
List sponsored by Redwood Alliance<br>
<br>
Pay optional member dues here: <a href="http://re-wrenches.org" rel="noreferrer" target="_blank">http://re-wrenches.org</a><br>
<br>
List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org" target="_blank">RE-wrenches@lists.re-wrenches.org</a><br>
<br>
Change listserver email address & settings:<br>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" rel="noreferrer" target="_blank">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br>
<br>
There are two list archives for searching. When one doesn't work, try the other:<br>
<a href="https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/" rel="noreferrer" target="_blank">https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/</a><br>
<a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org" rel="noreferrer" target="_blank">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a><br>
<br>
List rules & etiquette:<br>
<a href="http://www.re-wrenches.org/etiquette.htm" rel="noreferrer" target="_blank">http://www.re-wrenches.org/etiquette.htm</a><br>
<br>
Check out or update participant bios:<br>
<a href="http://www.members.re-wrenches.org" rel="noreferrer" target="_blank">http://www.members.re-wrenches.org</a><br>
<br>
</blockquote></div></div>
_______________________________________________<br>
List sponsored by Redwood Alliance<br>
<br>
Pay optional member dues here: <a href="http://re-wrenches.org" rel="noreferrer" target="_blank">http://re-wrenches.org</a><br>
<br>
List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org" target="_blank">RE-wrenches@lists.re-wrenches.org</a><br>
<br>
Change listserver email address & settings:<br>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" rel="noreferrer" target="_blank">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br>
<br>
There are two list archives for searching. When one doesn't work, try the other:<br>
<a href="https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/" rel="noreferrer" target="_blank">https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/</a><br>
<a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org" rel="noreferrer" target="_blank">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a><br>
<br>
List rules & etiquette:<br>
<a href="http://www.re-wrenches.org/etiquette.htm" rel="noreferrer" target="_blank">http://www.re-wrenches.org/etiquette.htm</a><br>
<br>
Check out or update participant bios:<br>
<a href="http://www.members.re-wrenches.org" rel="noreferrer" target="_blank">http://www.members.re-wrenches.org</a><br>
<br>
</blockquote></div>
_______________________________________________<br>
List sponsored by Redwood Alliance<br>
<br>
Pay optional member dues here: <a href="http://re-wrenches.org" rel="noreferrer" target="_blank">http://re-wrenches.org</a><br>
<br>
List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org" target="_blank">RE-wrenches@lists.re-wrenches.org</a><br>
<br>
Change listserver email address & settings:<br>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" rel="noreferrer" target="_blank">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br>
<br>
There are two list archives for searching. When one doesn't work, try the other:<br>
<a href="https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/" rel="noreferrer" target="_blank">https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/</a><br>
<a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org" rel="noreferrer" target="_blank">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a><br>
<br>
List rules & etiquette:<br>
<a href="http://www.re-wrenches.org/etiquette.htm" rel="noreferrer" target="_blank">http://www.re-wrenches.org/etiquette.htm</a><br>
<br>
Check out or update participant bios:<br>
<a href="http://www.members.re-wrenches.org" rel="noreferrer" target="_blank">http://www.members.re-wrenches.org</a><br>
<br>
</blockquote></div>
</div>