<div dir="auto"><div>I have a situation with a utility company that requires us to have a single visible load break disconnect switch that isolates only the "renewable sources" without disconnecting the house loads. To do this, the only way possible seems to be combining the inverters in a load center and then using the main lugs in the load center to go to a fusible disconnect switch, and then the backup load lugs in the Gateway 3. </div><div dir="auto"><br></div><div dir="auto">The problem with that is I have not been able to find a 125 amp load center that accepts multiple backfed breaker fasteners. Square D has a 100 amp load center that accepts two breaker hold down kits, but for two Powerwalls we need 125A. </div><div dir="auto"><br></div><div dir="auto">Other than going to a panel board with bolt on breakers, can you think of any other way to comply?</div><div dir="auto"><br></div><div dir="auto">Jason Szumlanski </div><div dir="auto">Florida Solar Design Group </div><div dir="auto">We</div><div dir="auto"><br></div><div data-smartmail="gmail_signature"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><b><div style="text-align:center"><table border="0" cellpadding="0" cellspacing="0" style="color:rgb(34,34,34);font-weight:400;text-align:start;font-family:"helvetica neue",helvetica,arial,sans-serif"><tbody></tbody></table></div></b></div></div></div></div></div></div></div></div>