<div dir="ltr"><div dir="auto"><div dir="ltr"><div>For those of you installing batteries inside homes how are you treating this poorly-worded section of Code? </div><div dir="auto"> </div><div><b>NFPA 855 - 15.4.2:</b></div><div><i>If the room or space where the ESS is to be installed is not finished or non-combustible, the walls and ceilings of the room or space shall be protected with not less than 5/8 in. Type X gypsum board.</i></div><div><i><br></i></div><div dir="auto">This section of fire code has given us much consternation over the years. Most installations in this climate are going into unfinished basements. Are you all installing 5/8 sheetrock for the entire basement? Just the area around the batteries? Something else?</div><div><br></div><div>Thanks in advance for any thoughts.</div><div dir="auto"><br></div><div dir="auto"><br></div><div><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div style="color:rgb(34,34,34)"><div dir="ltr"><div dir="ltr">--<br><div dir="ltr">Nicholas Ponzio <br>Building Energy<br>1570 South Brownell Road<br>Williston, VT 05495</div><div dir="ltr"><a href="http://www.buildingenergyvt.com/" style="color:rgb(17,85,204)" rel="noreferrer" target="_blank">http://www.BuildingEnergyVT.com</a></div><div dir="ltr"><img width="200" height="118" src="https://ci3.googleusercontent.com/mail-sig/AIorK4zLpKAgDa52XFxRwn1ImZ6B7kz-NKN9U0SJvLOILiiB7uS_hl9XDbHJzjSfEyIaQt5MWOn3x0w"><br></div><div dir="ltr"><span style="font-size:12.8px">"Building Solutions for a Sustainable Future"</span></div></div></div></div></div></div></div></div></div></div></div></div></div></div></div></div></div></div></div></div>
<img width="0" height="0" class="mailtrack-img" alt="" style="display:flex" src="https://mailtrack.io/trace/mail/e279051379a4ec754c8cb1796c1310614ebd9956.png?u=6273276"></div>