<div dir="auto"><div>Greetings wrenches,</div><div dir="auto">In Pacific Power territory we are coming up against roadblocks with regards to whole house battery backup systems with inverter ratings higher than 25kw. Even when the generation capacity is below the 25kw residential limit, net metering applications are being rejected based on the inverter rating.. The inverter rating in these cases is sized to handle the customer's existing loads and will never export more than the 25kw limit dictated by Oregon PUC.  I am drafting a letter to Energy Trust, the state, etc. But am curious if anyone else gas had this problem or come up with a solution. I would appreciate to hear any experiences or similar interactions with PGE or PPL or even how this has worked in other jurisdictions, states, etc. Any input or support is greatly appreciated.</div><div dir="auto"><br></div><div dir="auto">Tyrone Houck</div><div dir="auto">Oregon Solarworks LLC </div><div dir="auto">CCB #204937 LRT #076</div><div dir="auto">541-787-1366 </div><div dir="auto"><a href="mailto:tyrone@oregonsolarworks.com">tyrone@oregonsolarworks.com</a></div><div><br></div><div data-smartmail="gmail_signature"><br>    </div></div>