<div dir="ltr"><div>Wrenches,</div><div><br></div><div>We maintain a SolarEdge 119kW (564 panels) small commercial grid tied system without ESS that we did not install. We were brought in at the bitter end to commission and get the interconnection agreement with the power company all set up. It has been about 4 years and we have replaced 5 of the 7 inverters and what seems like an endless amount of optimizers. </div><div><br></div><div>I am toying with the idea of proposing that we move away from SolarEdge. It seems ridiculous on the surface but so is the money spent by the client fixing this system 2 to 3 times a year. Regardless, financially it does not make sense but functionally it is incredibly frustrating for everyone involved to keep fixing this system.</div><div><br></div><div>What would you do?</div><div><br></div><div><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div dir="ltr">Aloha,<div><br></div><div>Lou Russo </div><div>Owner</div><div><a href="mailto:lou@spreesolarsystems.com" target="_blank">lou@spreesolarsystems.com</a></div><div>Office - 808 345 6762</div><div>Spree Solar Systems LLC </div><div>CT-34322</div><div><br></div></div></div></div></div></div>