<div dir="ltr">Hey there wrenchers,<div><br></div><div>I am working on a larger project with 6 Sol-Ark 15K units and an 800A service. The main service conductors are 3 parallel runs of 400 kcmil. I am wondering how to CT these conductors from the master inverter. Sol Ark tech support has not been very helpful so far. I have the included 300A CTs ....and I do know that they make a 600A CT, but its physical size and rating aren't a good fit. Does anyone have experience with either a Sol Ark or third party CT that might fit this 800A configuration? </div><div><br></div><div>Kindly,</div><div><br></div><div>Chris Sparadeo <br clear="all"><div><br></div><br><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div><div dir="ltr"><div dir="ltr"><div></div></div></div></div></div></div></div></div>