<div dir="auto"><div>Wrenches, Jason</div><div dir="auto">I have always either with outback and with solark have always connected each unit with a distribution panel with breakers regardless of what's in the inverter package. This same goes for the gen set connections with proper breakers so not to have to over size the wires. </div><div dir="auto">I have connected to either the gen set input or the grid input both will work and both can be used to charge the batteries. </div><div dir="auto">Question l do alot of gen set integration and breakers on the genset may not reflect its actual design output and l have seen multiple times overloading the genset due to the incorrect math. Use a power factor of .8 of the gen set rating then 75% of that is safe continues operating load. Now some may argue with this but when l take a 150 kW  genny for a 4 hr load bank test that's the math that's used.</div><div dir="auto"><br></div><div dir="auto">Your batteries should also be independently fuse or breaker protected outside of the battery such as a midnite battery combiner breaker cabinet, required for any more than two banks. I do this with FLA's blue planet and fortress regardless of the internal breaker supplied.</div><div dir="auto">Fun times<br><br><div class="gmail_quote" dir="auto"><div dir="ltr" class="gmail_attr">On Tue, Mar 26, 2024, 2:27 PM Jason Szumlanski via RE-wrenches <<a href="mailto:re-wrenches@lists.re-wrenches.org">re-wrenches@lists.re-wrenches.org</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div dir="ltr"><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">I am going to have a quad-stack of Sol-Ark 15K for an off-grid 120/240V system with a 150A generator. I know the max real power is 62.5A each inverter including battery and PV. That would be 62.5A x 4 = 250A total. I intend to connect the output of the 4 inverters together with a 5-port Polaris tap, with the output of the Polaris Tap going to a 400A main lug only panelboard. </div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">My question revolves around the 200A passthrough capability for the generator, which is 150A max output and would be connected to the Grid input on each inverter. Since each inverter would need to handle the full pass-through current, that would require minimum 150A conductors on the input side of each inverter. I am under the impression that the inverters can supplement the "grid" or generator in this case if the current exceeds the available input. That means the inverter would have 150A of input plus 62.5A  of inverter power for a total of 212.5A. But there is a 200A load OCPD, so I could size the load conductors from each inverter for 200A.</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">Obviously the 4 inverters can only pass through 150A from the generator in total, which would probably be split among them, but could go through a single unit if the rest fail.</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">Now, is it possible for each inverter to output 62.5A each PLUS 150A of generator power spread across them for a total of 400A? That is important because I would need to size the combined output conductors for 400A if that is the case.</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">I guess I'm not clear on how Sol-Ark 15K handles grid/generator assist/supplement. It does not seem to be documented clearly.</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">Jason Szumlanski</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">Florida Solar Design Group</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><b><div style="text-align:center"><br></div></b></div></div></div></div></div></div></div></div></div>
_______________________________________________<br>
List sponsored by Redwood Alliance<br>
<br>
Pay optional member dues here: <a href="http://re-wrenches.org" rel="noreferrer noreferrer" target="_blank">http://re-wrenches.org</a><br>
<br>
List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org" target="_blank" rel="noreferrer">RE-wrenches@lists.re-wrenches.org</a><br>
<br>
Change listserver email address & settings:<br>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" rel="noreferrer noreferrer" target="_blank">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br>
<br>
There are two list archives for searching. When one doesn't work, try the other:<br>
<a href="https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/" rel="noreferrer noreferrer" target="_blank">https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/</a><br>
<a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org" rel="noreferrer noreferrer" target="_blank">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a><br>
<br>
List rules & etiquette:<br>
<a href="http://www.re-wrenches.org/etiquette.htm" rel="noreferrer noreferrer" target="_blank">http://www.re-wrenches.org/etiquette.htm</a><br>
<br>
Check out or update participant bios:<br>
<a href="http://www.members.re-wrenches.org" rel="noreferrer noreferrer" target="_blank">http://www.members.re-wrenches.org</a><br>
<br>
</blockquote></div></div></div>