<div dir="auto">Mac makes a great point about reusing hardware. I would be very cautious about reusing mid-clamps and end-clamps with some brands being better or worse than others.<div dir="auto"><br></div><div dir="auto">And this may or may not apply to you, but we had many people switch from shingle or tile roofs to metal roofs. That could change the spacing of attachment points, requiring more or fewer L-feet and rail attachment hardware.</div><div dir="auto"><br></div><div dir="auto">Based on my experience, unless you have a very good certainty about the viability of existing equipment, you may not want to quote reinstallation until you remove the system and evaluate and catalog the parts you have.</div><div dir="auto"><br></div><div dir="auto">Jason</div><div dir="auto"><br></div></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Thu, Mar 21, 2024, 7:36 AM Mac Lewis <<a href="mailto:maclewis1@gmail.com">maclewis1@gmail.com</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div dir="auto">Hi Howie,<div dir="auto"><br></div><div dir="auto">I would ask the AHJ and indicate you are simply reinstalling the system, not reengineering anything. </div><div dir="auto"><br></div><div dir="auto">I wouldn't take it for granted that the mounting hardware will be usable, or cost effective to reuse. It's often seized, cross threaded, dirty etc. </div><div dir="auto"><br></div><div dir="auto">There will be a lot of these coming up...</div><div dir="auto"><br></div><div dir="auto">Good luck</div></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Thu, Mar 21, 2024, 7:29 AM Jason Szumlanski via RE-wrenches <<a href="mailto:re-wrenches@lists.re-wrenches.org" target="_blank" rel="noreferrer">re-wrenches@lists.re-wrenches.org</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div dir="ltr"><div dir="ltr"><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">Each state and jurisdiction could be different. Some didn't even want a permit around here after Hurricane Irna in 2017. After Hurricane Ian in 2022, virtually all did.</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif">As someone who has removed and reinstalled MANY systems to allow for hurricane damaged roof replacements, my approach has always been that the permit application was simply a structural application for the remounting of the solar panels. I indicated that the PV source conductors (or inverter output conductors in the case of microinverters) would simply be reconnected in a roof mounted junction box. This never rose to the level of requiring updating electrical wiring to current codes with respect to rapid shutdown or otherwise. We always made sure labels were legible and did any minor electrical cleanup, but I would not even provide a detailed electrical plan with our applications.</div><div><div dir="ltr" class="gmail_signature"><div dir="ltr"><br>Jason Szumlanski<div><span style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px">Principal Solar Designer | Florida Solar Design Group</span><br style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px"><span style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px">NABCEP Certified Solar Professional (PVIP)</span><br style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px"><span style="color:rgb(51,51,51);font-family:Roboto,RobotoDraft,Helvetica,Arial,sans-serif;font-size:13px">Florida State Certified Solar Contractor CVC56956</span></div><div><font color="#333333" face="Roboto, RobotoDraft, Helvetica, Arial, sans-serif">Florida Certified Electrical Contractor EC13013208</font></div></div></div></div><br></div><br><div class="gmail_quote"><div dir="ltr" class="gmail_attr">On Wed, Mar 20, 2024 at 9:35 PM Howie Michaelson via RE-wrenches <<a href="mailto:re-wrenches@lists.re-wrenches.org" rel="noreferrer noreferrer" target="_blank">re-wrenches@lists.re-wrenches.org</a>> wrote:<br></div><blockquote class="gmail_quote" style="margin:0px 0px 0px 0.8ex;border-left:1px solid rgb(204,204,204);padding-left:1ex"><div dir="auto">Hi all, <div dir="auto">I have a potential job reinstalling an 11 year old 4.4kW roof mounted net metered array, feeding a PVI 4kW inverter.   The array was pulled down by a reputable company last fall, with the intention of remounting it after the asphalt shingle roof was reroofed. From a distance, it appears that it was carefully removed and all parts and pieces were saved.  Unfortunately the company's principle died in the interim and the company folded. I'm trying to determine if this scenario is grandfathered code wise, since it predates RSD. If not, I'm not sure it is worth retrofitting it with add on Tigo or APSMART equipment as opposed to replacing the whole system. In any case, before we explore the options, I'm trying to determine if putting it back up without RSD is (1) code compliant and (2) reasonable. </div><div dir="auto">Thanks for any insight, </div><div dir="auto">Howie Michaelson</div><div dir="auto">Sun Catcher </div></div>
_______________________________________________<br>
List sponsored by Redwood Alliance<br>
<br><br>
</blockquote></div></div>
_______________________________________________<br>
List sponsored by Redwood Alliance<br>
<br>
Pay optional member dues here: <a href="http://re-wrenches.org" rel="noreferrer noreferrer noreferrer" target="_blank">http://re-wrenches.org</a><br>
<br>
List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org" rel="noreferrer noreferrer" target="_blank">RE-wrenches@lists.re-wrenches.org</a><br>
<br>
Change listserver email address & settings:<br>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" rel="noreferrer noreferrer noreferrer" target="_blank">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br>
<br>
There are two list archives for searching. When one doesn't work, try the other:<br>
<a href="https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/" rel="noreferrer noreferrer noreferrer" target="_blank">https://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/</a><br>
<a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org" rel="noreferrer noreferrer noreferrer" target="_blank">http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</a><br>
<br>
List rules & etiquette:<br>
<a href="http://www.re-wrenches.org/etiquette.htm" rel="noreferrer noreferrer noreferrer" target="_blank">http://www.re-wrenches.org/etiquette.htm</a><br>
<br>
Check out or update participant bios:<br>
<a href="http://www.members.re-wrenches.org" rel="noreferrer noreferrer noreferrer" target="_blank">http://www.members.re-wrenches.org</a><br>
<br>
</blockquote></div>
</blockquote></div>