<div dir="ltr">Hello Wrenches,<div><br></div><div>I need to retrofit a Schneider XW+ system with a rapid shutdown system.  The owner purchased this equipment about 4-5 years ago but is trying to get it past a <u>very </u>intense inspector.</div><div><br></div><div>To me, it looks relatively straightforward to get NEC 2023 rapid shutdown compliant using Tigo TS4AF, and adding Schneider's MPPT Disconnect RS and external rapid shutdown initiator.  It's a little strange though because it has 2017 NEC compliant all over the documentation but I believe we are good through NEC 2023 because shutdown occurs at a module level and the Disconnect RS can take care of arc-fault monitoring.  </div><div><br></div><div>Does anyone have any documentation for the MPPT Disconnect RS that doesn't specifically call out (only) NEC 2017 compliant?</div><div><br></div><div>Or if this is not a good approach and is not reliable, I would appreciate your input as well.</div><div><br></div><div>Cheers!</div><div><br></div><div><br></div><div><br></div><div><div><br></div><span class="gmail_signature_prefix">-- </span><br><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div><br></div><div><font color="#305A78" face="'times new roman', serif"><br></font></div><div><br></div>Mac Lewis<br><br><span style="font-family:'Times New Roman';font-size:medium;color:rgb(255,153,0)"><b><font face="Arial, Helvetica, sans-serif" size="3"><p align="left"><font color="#000000" face="Verdana, Arial, Helvetica, sans-serif"><span style="font-size:small"><span style="font-family:arial;font-weight:normal;color:rgb(48,90,120)"><font face="'times new roman', serif">"Yo solo sé que no sé nada." </font><span style="font-weight:700;color:rgb(104,104,104)"><font face="'times new roman', serif">-Sócrates</font></span></span></span></font></p></font></b></span></div></div></div>