<div dir="ltr">All,<div>Has anyone ever mounted MLEs (optimizers, microinverters, RSDs) on the perimeter of the array or elsewhere instead of underneath the PV module?</div><div><br></div><div>I never was a fan of climbing up on a pitched roof and removing modules to replace the electronics. And with a recent knee replacement, I won't be providing this service again.</div><div><br></div><div>In post-surgery downtime this simple idea surfaced. My next job if it's practical is to create jumper module cables to extend down to the electronics, mounted just outside the array on their own rail. Then create a good-looking TBD cover to shield the MLEs from direct sunlight, snow, etc.</div><div><span class="gmail_signature_prefix">-- </span><br><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><p class="MsoNormal" style="color:rgb(0,0,0);font-family:Arial;font-size:16px;margin:0in 0in 0.0001pt"><span style="font-size:10pt"><a name="SignatureSanitizer__MailAutoSig"><b>Kirk Herander / </b></a><b><a href="mailto:kirkh@vermont.solar" title="Send an email to kirkh@vermont.solar; Send an email to kirkh@vermont.solar" style="color:blue" target="_blank">kirkh@vermont.solar</a></b></span></p><p class="MsoNormal" style="color:rgb(0,0,0);font-family:Arial;font-size:16px;margin:0in 0in 0.0001pt"><span style="font-size:10pt"><b>Owner|Principal, VT Solar, LLC</b></span></p><p class="MsoNormal" style="color:rgb(0,0,0);font-family:Arial;font-size:16px;margin:0in 0in 0.0001pt"><span style="font-size:10pt"><b><i>Celebrating our 32<sup>st</sup> Anniversary 1991-2023!!</i></b></span></p><p class="MsoNormal" style="color:rgb(0,0,0);font-family:Arial;font-size:16px;margin:0in 0in 0.0001pt"><span style="font-size:10pt">dba Vermont Solar Engineering</span><br></p><p class="MsoNormal" style="color:rgb(0,0,0);font-family:Arial;font-size:16px;margin:0in 0in 0.0001pt"><span style="font-size:10pt">802.863.1202</span></p></div></div></div></div>