<div dir="ltr">How should we treat direct burial wires in a trench for ampacity derating purposes?<div>- Should they be considered "in a raceway or cable"? [NEC 310.15(B)(3)(a)]</div><div>- If it is determined that "spacing" must be maintained, what minimum spacing is acceptable/permissible?</div><div><br></div><div>I would be interested to hear what means and methods others have used to deal with this issue.</div><div><br></div><div>--</div><div>Corey Shalanski</div><div>Joule Energy</div><div>New Orleans, LA</div></div>