<div dir="ltr">Umm, is PV Wire rated for direct burial? I have seen several manufacturer spec sheets that suggest this is the case, but I haven't heard of anyone ever actually doing this.<div><br></div><div>Project Information:</div><div>1.6 MW single axis tracker</div><div>(35) 40 kW string inverters</div><div>Trenching from row ends to inverter wall, trench lengths will vary between 15-100 feet.</div><div><br></div><div>--</div><div>Corey Shalanski</div><div>Joule Energy</div><div>New Orleans, LA</div></div>