<div dir="ltr">Installer went out of business, all I have to troubleshoot with is an as-built 3-line that "may or may not be right." The charge controllers are a pair Midnite Classic 200s. Customer complained that system selling only 2/3 of what was predicted back to the utility; that appears to be because everything out of his critical loads subpanel is running off the battery bank all night, every night, grid or no, so it takes 1/3 of the day to get the batteries charged up again every day and start selling to the grid.<div><br></div><div>I have very little experience with the XW+ thus my question for the folks here. My plan for next week is to show up, make my own as-built 3-line, and recommission the inverter. Anyone else seen this sort of thing before? Hard to believe that an electrician would mis-wire or not wire the bypass, I'm thinking software setting.</div><div><br><div><br clear="all"><div><div class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div><span style="font-size:12.8000001907349px">Dan Fink</span><div style="font-size:12.8000001907349px">Adjunct Professor of Solar Energy Technology, Ecotech Institute</div><div style="font-size:12.8000001907349px">IREC Certified Instructor™ for: </div><div style="font-size:12.8000001907349px">~ PV Installation Professional</div><div style="font-size:12.8000001907349px">~ Small Wind Installer</div><div style="font-size:12.8000001907349px">Executive Director, Buckville Energy</div><div style="font-size:12.8000001907349px">NABCEP Registered Continuing Education Providers™<br><a href="tel:970.672.4342" value="+19706724342" style="color:rgb(17,85,204)" target="_blank">970.672.4342</a></div><br> </div></div></div></div></div></div></div></div></div></div>
</div></div></div>