<div dir="ltr">It is not Square D, but a Milbank U5168-XTL-200 would do the trick.<div><br></div><div>Cheers, </div><div>Dave</div><div><div class="gmail_extra"><br clear="all"><div><div class="gmail_signature"><div dir="ltr"><div><br></div><div><b><font face="arial, helvetica, sans-serif">--</font></b></div><div><b><font face="arial, helvetica, sans-serif"><br></font></b></div><div><b><font face="arial, helvetica, sans-serif">Dave Tedeyan</font><br></b></div><div><b>Project Engineer</b></div><div><br></div><div><b>Taitem Engineering, PC</b></div><div>109<font color="#000000"> S. Albany Street, Ithaca, NY 14850</font></div><div><font color="#000000">Voice: <a value="+16072771118">(607) 277-1118 x121</a></font></div><div><a href="http://www.taitem.com/" target="_blank"><font color="#000000">www.taitem.com</font></a></div></div></div></div>
<br><div class="gmail_quote">On Wed, Feb 17, 2016 at 3:31 PM, Patrick A. Shortell <span dir="ltr"><<a href="mailto:pshortell6@gmail.com" target="_blank">pshortell6@gmail.com</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div dir="auto"><div>Hi Gregory</div><div>If your installing a new load center</div><div>Try inserting a 2" "C" condulet</div><div>Ahead of the service panel</div><div>I'm assuming pvc conduit from meter to panel</div><div>Install solid core 200:5 ct's while you pull your cable through</div><div>Route the ct leads into the panel along with the phase conductors</div><div>Or if you have a meter main</div><div>Most have bolted buss connections that you can open and if you stagger the ct's and support them with a few cable ties</div><div>That could work</div><div>But</div><div>Your meter probably requires voltage sense and meter power conductors so nippling the meter to the panel might be a better solution just so you don't have to install additional oc protection in the meter main</div><div>Which might be sketchy</div><div>Hope I understood your question</div><div>Pat<br><br>Patrick A. Shortell<div>Licensed Master Electrician</div><div>Certified Solar Installer</div><div>71 Oregon Street</div><div>Long Beach N.Y. 11561</div><div><a href="http://www.thesolarstorehouse.com" target="_blank">Www.thesolarstorehouse.com</a></div><div><br></div></div><div><br>On Feb 17, 2016, at 2:29 PM, jerrysgarage01 <<a href="mailto:jerrysgarage01@gmail.com" target="_blank">jerrysgarage01@gmail.com</a>> wrote:<br><br></div><blockquote type="cite"><div><div>Can you get a meter main with only one breaker and then get a distribution panel and put all all loads there</div><div><br></div><div><br></div><div><div style="font-size:9px;color:#575757">Sent via the Samsung Galaxy S™ III, an AT&T 4G LTE smartphone</div></div><br><br><div>-------- Original message --------</div><div>From: Gregory Seelhorst <u></u> <u></u></div><div>Date:02/17/2016  6:23 AM  (GMT-10:00) </div><div>To: RE-wrenches <u></u> <u></u></div><div>Subject: [RE-wrenches] Optimal 200 or 225 Amp Square D MSP All-in-One meter       for CT Clamps </div><div><br></div><div dir="ltr"><div><div><div><div><div>Wrenches -<br><br></div>Does anyone know of a good spec for a 200 or 225A Square D Main Service Panel which has feeders between the meter and Main Disconnect and would be ideal for 150A CT clamps for monitoring whole house consumption?<br><br></div>I'm finding most MSPs have a short, flat bus between the meter and Main Disconnect which requires the Rigowski Coil (requiring more expensive and unreliable hardware).<br><br></div><div>Thank you for your help in advance.<br></div><div><br></div>Regards,<br><br></div>Greg Seelhorst<br></div>NABCEP PV Installation Professional #092907-16<div><div><div><div><br><br></div></div></div></div></div>
</div></blockquote><blockquote type="cite"><div><span>_______________________________________________</span><br><span>List sponsored by Redwood Alliance</span><br><span></span><br><span>List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org" target="_blank">RE-wrenches@lists.re-wrenches.org</a></span><br><span></span><br><span>Change listserver email address & settings:</span><br><span><a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" target="_blank">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a></span><br><span></span><br><span>List-Archive: <a href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html" target="_blank">http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a></span><br><span></span><br><span>List rules & etiquette:</span><br><span><a href="http://www.re-wrenches.org/etiquette.htm" target="_blank">www.re-wrenches.org/etiquette.htm</a></span><br><span></span><br><span>Check out or update participant bios:</span><br><span><a href="http://www.members.re-wrenches.org" target="_blank">www.members.re-wrenches.org</a></span><br><span></span><br></div></blockquote></div><br>_______________________________________________<br>
List sponsored by Redwood Alliance<br>
<br>
List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a><br>
<br>
Change listserver email address & settings:<br>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" rel="noreferrer" target="_blank">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br>
<br>
List-Archive: <a href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html" rel="noreferrer" target="_blank">http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a><br>
<br>
List rules & etiquette:<br>
<a href="http://www.re-wrenches.org/etiquette.htm" rel="noreferrer" target="_blank">www.re-wrenches.org/etiquette.htm</a><br>
<br>
Check out or update participant bios:<br>
<a href="http://www.members.re-wrenches.org" rel="noreferrer" target="_blank">www.members.re-wrenches.org</a><br>
<br>
<br></blockquote></div><br></div></div></div>