<div dir="ltr"><div class="gmail_default" style="font-family:trebuchet ms,sans-serif">Supply side interconnection is the only option, usually tapping service conductors in main panel between meter and existing main. Without other complexities present, it's pretty straightforward. We're running into a lot of meter/main combos that don't have conductors that can be tapped (copper bus bars between meter socket and main breaker. That has required changes of service equipment, which can be pricey.</div><div class="gmail_default" style="font-family:trebuchet ms,sans-serif"><br></div><div class="gmail_default" style="font-family:trebuchet ms,sans-serif">One thing that you should consider... Just because the service is 200A, it doesn't mean the utility transformer can handle the backfeed from a very large PV array, especially if a neighbor on the same transformer has a PV system. In one extreme case we had a single 25kW pole-mounted utility transformer feeding SIX tenant meters at a single property ranging from 100A to 200A! We wanted to install a PV system larger than 25kW (about 105A rating), and the utility blocked the project, denying the request to upgrade the transformer, even at the customer's expense. It was a bit more complicated than that, but bottom line it was a pure political/principle stance. If we had the legal department the utility does, we probably would have fought it.</div><div class="gmail_default" style="font-family:trebuchet ms,sans-serif"><br></div><div class="gmail_default" style="font-family:trebuchet ms,sans-serif">It's a lesson to check the utility transformer serving the property, not just the service rating.</div><div class="gmail_extra"><br clear="all"><div><div class="gmail_signature"><div dir="ltr"><div><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><div dir="ltr"><span><br><div dir="ltr" style="margin-left:0pt"></div></span></div></div></div></div></div></div></div></div></div>
<br><div class="gmail_quote">On Fri, Sep 25, 2015 at 9:10 AM, gary easton <span dir="ltr"><<a href="mailto:gary@arp-solar.com" target="_blank">gary@arp-solar.com</a>></span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div dir="ltr">Hello Wrenches,<div>What are folks doing when installing 100A plus of solar into a 200A service? <span class="HOEnZb"><font color="#888888"><br clear="all"><div><br></div>-- <br><div><div dir="ltr"><span style="border-collapse:collapse;font-family:arial,sans-serif;font-size:13px">Gary Easton<br>Appalachian Renewable Power</span><div><span style="border-collapse:collapse;font-family:arial,sans-serif;font-size:13px">Stewart, Ohio 45778<br>NABCEP Certified Solar PV                                                            <br>T: <a value="+17402778498" style="color:rgb(6,88,181)">740-277-8498</a></span><div><span style="border-collapse:collapse;font-family:arial,sans-serif;font-size:13px"><a value="+17402778498" style="color:rgb(6,88,181)"></a> <a href="http://www.arp-solar.com" target="_blank">www.arp-solar.com</a></span></div></div><div><br></div><div><h1 style="margin-top:0px;margin-right:0px;margin-bottom:0px;margin-left:0px;color:rgb(0,51,153);font-family:Arial,sans-serif;font-size:12px">“First they ignore you. Then they laugh at you. Then they fight you. Then you win.”</h1></div><div>~Ghandi</div><div><br></div></div></div></font></span></div></div></blockquote></div></div></div>