<div dir="ltr"><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small">Hi all,</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small">
The kW is correct, although it does run counter to most every definition of a battery we're used to -- I guess you could say the vectors of physics and policy are not always aligned.  </div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small">
<br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small">The entire "kW" issue ties back to the self-generation incentive program (SGIP), which currently pays about $1.80/Watt for energy storage.  I had many long discussions this past year with policymakers and the program administrators at the CCSE, and they really helped me understand the reasons behind how energy storage came to be defined in kW, not kWh. The Governor and other policymakers want to achieve reduced greenhouse gas emissions, and in order to do that we need a more efficient grid -- renewables are now as cheap or cheaper than traditional generation, but due to the variability (of loads and generation) and increased reliance on natural gas GHG emissions are trending up, not down.  We can't generate our way out of this cycle; storage is a key tool in moving to the next stage, and the policymakers wanted to provide tools to increase the adoption of storage on the grid.</div>
<div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small">In the sometimes convoluted way that policy sometimes takes, the best tool they had available was SGIP, so they added Advanced Energy Storage to SGIP.  Since SGIP is a "generator" program, in order to make this work they had to define AES in terms of a generator.  Therefore, the battery is rated in terms of the capacity that it can provide to (or the capacity that it replaces from) the grid, for a period of time, which is defined as a two hour period.</div>
<div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small">To turn that into actual (if rough) numbers, let's say you have a 200 AH battery. The 200 AH is only at the 100 hour rate, so you need a manufacturer that provides the one or two hour rate, where it's good for 103 AH, or 4.944 kWh per string to total exhaustion.  You don't want to flatline the battery, so let's use  80% DOD, which would be 3.95 kWh per string.  You need to be able to provide this capacity for two hours, so cut that number in half for 1.97 kWh rated capacity.  Per the SGIP handbook, "<span style="font-size:16px;color:rgb(1,1,1);font-family:Arial">The purpose of the SGIP is to contribute to Greenhouse Gas (GHG) emission reductions, demand </span><span style="font-size:16px;color:rgb(1,1,1);font-family:Arial">reductions and reduced customer electricity purchases, resulting in the electric system reliability through </span><span style="font-size:16px;color:rgb(1,1,1);font-family:Arial">improved transmission and distribution system utilization; as well as market transformation for distributed </span><span style="font-size:16px;color:rgb(1,1,1);font-family:Arial">energy resource (DER) technologies."  </span>Put two strings of that battery together with a ~4kW battery based inverter and a program that meets that purpose, and you're off to the races.</div>
<div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small">If the inverter/battery is 10kW or less per this definition, there are no metering requirements.  For systems larger than 10kW, or if you wish to use the metering requirements of systems larger than 10kW you can meter the load, the generation and the total energy flow at the PCC, and the utility can't charge you more than $600 for all of this metering.  There's a writeup on the OutBack website on how to use two meters plus a NEM meter to do this.</div>
<div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small"><br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small">Hope this helps,</div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small">
<br></div><div class="gmail_default" style="font-family:arial,helvetica,sans-serif;font-size:small">Phil Undercuffler</div></div><div class="gmail_extra"><br><br><div class="gmail_quote">On Thu, Jul 3, 2014 at 8:56 AM, Bruce Erickson <span dir="ltr"><<a href="mailto:bruce@mendocinosolar.com" target="_blank">bruce@mendocinosolar.com</a>></span> wrote:<br>
<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex"><div style="word-wrap:break-word">Hi Wrenches,<div><br></div><div>Here is the only info I've seen regarding NEM with batteries in California. It's a May 15 news post from CALSEIA, which Brad allowed me to post here.</div>
<div><br></div><div>One problem clearly is defining the categories, because what is a storage system "larger than 10 kW"? Seems like there's an "h" factor missing.</div><div><br></div><div>Even for category 1, "internal metering devices" could be a Mate3 for instance, but how can a Mate report directly to the utility?</div>
<div><br></div><div>This whole thing is a mess, IMO. I'm still curious, are any other California Wrenches dealing with utility NEM departments for systems with storage in the last few months, and what has been your experience?</div>
<div><br></div><div><blockquote type="cite"><div style="word-wrap:break-word"><div><blockquote type="cite"><span style="border-collapse:separate;font-family:Palatino;font-style:normal;font-variant:normal;font-weight:normal;letter-spacing:normal;line-height:normal;text-align:-webkit-auto;text-indent:0px;text-transform:none;white-space:normal;word-spacing:0px;font-size:inherit"><div style="margin-top:0px;margin-right:0px;margin-bottom:0px;margin-left:0px;padding-top:0px;padding-right:0px;padding-bottom:0px;padding-left:0px;background-color:rgb(255,255,255)">
<center><table align="center" border="0" cellpadding="0" cellspacing="0" height="100%" width="100%" style="border-collapse:collapse!important;height:1552px;margin-top:0px;margin-right:0px;margin-bottom:0px;margin-left:0px;padding-top:0px;padding-right:0px;padding-bottom:0px;padding-left:0px;width:800px;background-color:rgb(255,255,255)">
<tbody><tr><td align="center" height="100%" valign="top" width="100%" style="border-collapse:collapse!important"><table border="0" cellpadding="0" cellspacing="0" width="100%" style="border-collapse:collapse!important"><tbody><tr>
<td align="center" valign="top" style="border-collapse:collapse!important"><table border="0" cellpadding="0" cellspacing="0" width="600" style="border-collapse:collapse!important;width:600px"><tbody><tr><td align="center" valign="top" style="border-collapse:collapse!important;background-color:rgb(189,189,189);padding-top:10px;padding-right:5px;padding-left:5px">
<img height="40" width="40" style="border-top-width:0px;border-right-width:0px;border-bottom-width:0px;border-left-width:0px;border-style:initial;border-color:initial;min-height:auto;line-height:14px;outline-style:none;outline-width:initial;outline-color:initial;text-decoration:none;border-style:initial;border-color:initial" src="cid:B5769F92-248F-4B5C-B929-784AFD88E7B7"></td>
<td align="left" valign="top" style="border-collapse:collapse!important;padding-left:10px"><table border="0" cellpadding="0" cellspacing="0" width="100%" style="border-collapse:collapse!important"><tbody><tr><td align="center" valign="top" style="border-collapse:collapse!important">
<table border="0" cellpadding="0" cellspacing="0" width="100%" style="border-collapse:collapse!important;background-color:rgb(255,255,255);border-top-width:0px;border-top-style:initial;border-top-color:initial;border-bottom-width:0px;border-bottom-style:initial;border-bottom-color:initial">
<tbody><tr><td style="border-collapse:collapse!important;color:rgb(54,54,54);font-family:Helvetica;font-size:10px;line-height:12px;padding-top:10px;padding-bottom:10px;text-align:left">Official CALSEIA Membership Announcement</td>
<td width="220" style="border-collapse:collapse!important;color:rgb(54,54,54);font-family:Helvetica;font-size:10px;line-height:12px;padding-top:10px;padding-bottom:10px;text-align:left;padding-left:20px">Email not displaying correctly?<br>
<a href="http://us4.campaign-archive2.com/?u=a0487692bb2e2f280211c4298&id=24ddc73bfb&e=01b7850b6c" style="color:rgb(54,54,54);font-weight:normal;text-decoration:underline" target="_blank">View it in your browser</a>.</td>
</tr></tbody></table></td></tr><tr><td align="center" valign="top" style="border-collapse:collapse!important"><table border="0" cellpadding="0" cellspacing="0" width="100%" style="border-collapse:collapse!important;border-top-width:0px;border-top-style:initial;border-top-color:initial;border-bottom-width:0px;border-bottom-style:initial;border-bottom-color:initial">
<tbody><tr><td valign="top" style="border-collapse:collapse!important;color:rgb(54,54,54);font-family:Helvetica;font-size:20px;font-weight:bold;line-height:20px;padding-top:20px;padding-right:0px;padding-bottom:20px;padding-left:0px;text-align:left;vertical-align:middle">
<img alt="" border="0" width="179" height="76" style="border-top-width:0px;border-right-width:0px;border-bottom-width:0px;border-left-width:0px;border-style:initial;border-color:initial;min-height:76px;line-height:20px;outline-style:none;outline-width:initial;outline-color:initial;text-decoration:none;max-width:530px;border-top-style:none;border-right-style:none;border-bottom-style:none;border-left-style:none;width:179px;margin-top:0px;margin-right:0px;margin-bottom:0px;margin-left:0px;padding-top:0px;padding-right:0px;padding-bottom:0px;padding-left:0px" src="cid:ACF11899-C4B2-4745-8185-301F4C589E18"></td>
</tr></tbody></table></td></tr><tr><td align="center" valign="top" style="border-collapse:collapse!important"><table border="0" cellpadding="0" cellspacing="0" width="100%" style="border-collapse:collapse!important;border-top-width:0px;border-top-style:initial;border-top-color:initial;border-bottom-width:0px;border-bottom-style:initial;border-bottom-color:initial">
<tbody><tr><td valign="top" style="border-collapse:collapse!important;color:rgb(54,54,54);font-family:Helvetica;font-size:13px;line-height:19px;padding-top:20px;padding-bottom:20px;text-align:left"><h1 style="color:rgb(54,54,54)!important;display:block;font-family:Helvetica;font-size:24px;font-style:normal;font-weight:normal;line-height:24px;letter-spacing:normal;margin-top:0px;margin-right:0px;margin-bottom:10px;margin-left:0px;text-align:left">
<font color="#003366"><strong>News Alert</strong></font></h1> <h2 style="color:rgb(54,54,54)!important;display:block;font-family:Helvetica;font-size:18px;font-style:normal;font-weight:normal;line-height:18px;letter-spacing:normal;margin-top:0px;margin-right:0px;margin-bottom:10px;margin-left:0px;text-align:left">
Dear CALSEIA Members,</h2><div><br>Earlier today, the California Public Utilities Commission voted to finalize the decision on the interconnection of solar systems paired with energy storage systems under net metering.<br>
<br>First, and most importantly, the decision restores the ability of solar systems paired with storage to qualify under the standard net metering tariff. For the past year, utilities had refused to connect systems with batteries under NEM.<br>
<br>However, the decision includes new requirements. It effectively creates three categories of systems.<br><br>1. Storage systems smaller than 10 kW maximum output power can be paired with any size solar system and do not have to install a second meter. The associated solar systems will have to report system production to the utility using internal metering devices to make sure NEM credits are only going to solar output and not battery output.<br>
<br>2. Storage systems larger than 10 kW with maximum power output less than 150% of solar system capacity will have to install a second meter at a cost of up to $600 to make sure NEM credits are only going to solar output and not battery output.<br>
<br>3. Storage systems larger than 10 kW with maximum power output more than 150% of solar system capacity will be on the NEM-MT tariff rather than the standard NEM tariff. In addition to the $600 meter, they will have to pay an application fee of $800 and could potentially be subject to standby charges and distribution system studies and upgrades. They will still get net metering credits for electricity they put on the grid from the solar system.<br>
<br>These limits are an improvement over the limits that were in the proposed decision. The Commission did not include all of CALSEIA's recommendations, but it included some significant movement in the right direction.</div>
<ul><li>The threshold between the categories above was changed from 100% to 150% of the paired generator’s output power.</li><li>A kWh storage limit of the storage system was eliminated (how many hours worth of electricity can be stored).</li>
<li>A de-rate formula that would have potentially reduced the value of NEM credits was abandoned.</li><li>Utilities must refund application fees that were illegally collected over the past year.</li></ul>I would be happy to answer any questions you have with regard to how the conditions in the decision would apply to specific system configurations.<br>
<br>Thank you for your help in achieving this decision.<br><br><img align="none" height="32" width="200" style="border-top-width:0px;border-right-width:0px;border-bottom-width:0px;border-left-width:0px;border-style:initial;border-color:initial;min-height:32px;line-height:13px;outline-style:none;outline-width:initial;outline-color:initial;text-decoration:none;display:inline;max-width:600px!important;width:200px;border-style:initial;border-color:initial" src="cid:52B42428-4E10-4897-A323-2ECBD8EAB682"><br>
Brad Heavner<br>Policy Director, CALSEIA</td></tr></tbody></table></td></tr><tr><td align="center" valign="top" style="border-collapse:collapse!important;padding-bottom:40px"><table border="0" cellpadding="0" cellspacing="0" width="100%" style="border-collapse:collapse!important;border-top-width:1px;border-top-style:dotted;border-top-color:rgb(53,53,54);border-bottom-width:0px;border-bottom-style:initial;border-bottom-color:initial">
<tbody><tr><td valign="top" style="border-collapse:collapse!important;color:rgb(54,54,54);font-family:Helvetica;font-size:10px;line-height:15px;padding-top:20px;padding-bottom:20px;text-align:left"><a href="http://calseia.us4.list-manage1.com/track/click?u=a0487692bb2e2f280211c4298&id=a0f6b695c3&e=01b7850b6c" style="color:rgb(54,54,54);font-weight:normal;text-decoration:underline" target="_blank">www.calseia.org</a></td>
</tr><tr><td valign="top" style="border-collapse:collapse!important;color:rgb(54,54,54);font-family:Helvetica;font-size:10px;line-height:15px;padding-top:20px;padding-bottom:20px;text-align:left"><em>Copyright © 2014 CALSEIA, All rights reserved.</em> </td>
</tr></tbody></table></td></tr></tbody></table></td></tr></tbody></table></td></tr></tbody></table></td></tr></tbody></table></center></div></span></blockquote></div></div></blockquote><div class=""><div><br></div><div>
<span style="border-collapse:separate;color:rgb(0,0,0);font-family:Palatino;font-style:normal;font-variant:normal;font-weight:normal;letter-spacing:normal;line-height:normal;text-align:-webkit-auto;text-indent:0px;text-transform:none;white-space:normal;word-spacing:0px;font-size:medium"><span style="border-collapse:separate;color:rgb(0,0,0);font-family:Palatino;font-style:normal;font-variant:normal;letter-spacing:normal;line-height:normal;text-align:-webkit-auto;text-indent:0px;text-transform:none;white-space:normal;word-spacing:0px;font-size:medium"><div style="word-wrap:break-word">
<span style="border-collapse:separate;font-variant:normal;letter-spacing:normal;line-height:normal;text-align:-webkit-auto;text-indent:0px;text-transform:none;white-space:normal;word-spacing:0px"><div style="word-wrap:break-word">
<span style="border-collapse:separate;font-variant:normal;letter-spacing:normal;line-height:normal;text-indent:0px;text-transform:none;white-space:normal;word-spacing:0px"><div style="word-wrap:break-word"><div style="color:rgb(0,0,0);font-family:Palatino;font-size:medium;font-style:normal">
<b>Bruce Erickson</b></div><div style="color:rgb(0,0,0);font-family:Palatino;font-size:medium;font-weight:normal;font-style:normal">Mendocino Solar Service</div><div style="color:rgb(0,0,0);font-family:Palatino;font-size:medium;font-weight:normal;font-style:normal">
PO Box 1252</div><div style="color:rgb(0,0,0);font-family:Palatino;font-size:medium;font-weight:normal;font-style:normal">Mendocino, CA 95460</div><div style="color:rgb(0,0,0);font-family:Palatino;font-size:medium;font-weight:normal;font-style:normal">
<a href="tel:707-937-1701" value="+17079371701" target="_blank">707-937-1701</a></div><div style="color:rgb(0,0,0);font-family:Palatino;font-size:medium;font-weight:normal;font-style:normal"><a href="tel:707-937-1741" value="+17079371741" target="_blank">707-937-1741</a> fax</div>
<div style="color:rgb(0,0,0);font-family:Palatino;font-size:medium;font-weight:normal;font-style:normal"><a href="mailto:bruce@mendocinosolar.com" target="_blank">bruce@mendocinosolar.com</a></div><div style="color:rgb(0,0,0);font-family:Palatino;font-size:medium;font-weight:normal;font-style:normal">
<br></div><div style="font-weight:normal"><font color="#a603a8"><i>Celebrating 20 Years in Solar!</i><span> </span></font><font color="#4e3fd3">1994-2014</font></div></div></span><br></div></span><br></div></span><br></span><br>

</div>
<br></div></div></div><br>_______________________________________________<br>
List sponsored by Redwood Alliance<br>
<br>
List Address: <a href="mailto:RE-wrenches@lists.re-wrenches.org">RE-wrenches@lists.re-wrenches.org</a><br>
<br>
Change listserver email address & settings:<br>
<a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org" target="_blank">http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</a><br>
<br>
List-Archive: <a href="http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html" target="_blank">http://www.mail-archive.com/re-wrenches@lists.re-wrenches.org/maillist.html</a><br>
<br>
List rules & etiquette:<br>
<a href="http://www.re-wrenches.org/etiquette.htm" target="_blank">www.re-wrenches.org/etiquette.htm</a><br>
<br>
Check out or update participant bios:<br>
<a href="http://www.members.re-wrenches.org" target="_blank">www.members.re-wrenches.org</a><br>
<br>
<br></blockquote></div><br></div>