<br><font size=2 face="sans-serif">Hi Brian,</font>
<br><font size=2 face="sans-serif">LBX would be better for the way this
customer is using the system, because it only connects</font>
<br><font size=2 face="sans-serif"> to the grid when the batteries
get low. Unfortunately, the timers do not affect LBX, so charging </font>
<br><font size=2 face="sans-serif">may occur during the peak rate....or
it may not :C)</font>
<br>
<br><font size=2 face="sans-serif">Rgds,</font>
<br><font size=2 face="sans-serif"><br>
</font><font size=3 color=#008000>_____________________________________________________________________________________</font><font size=3>
<br>
</font><font size=1 face="Arial"><b><br>
Eric Bentsen</b>  |  </font><font size=1 color=#008000 face="Arial"><b>
Schneider Electric </b></font><font size=1 face="Arial"><b>  |  Solar
Business</b>  |   <b>UNITED STATES</b>  |   <b>Technical
Support Representative</b> <b><br>
Phone:</b> +(650) 351-8237 ext. 001#  |   <b><br>
Email:</b> </font><a href="mailto:eric.bentsen@schneider-electric.com"><font size=1 color=blue face="Arial"><u>eric.bentsen@schneider-electric.com</u></font></a><font size=1 face="Arial">
 |   <b>Site:</b></font><a href="http://www.schneider-electric.com/solar" target=_blank><font size=1 color=blue face="Arial"><u>
www.schneider-electric.com/solar</u></font></a><font size=1 face="Arial">
 |   <b>Address:</b> 250 South Vasco Rd., Livermore, CA 94551
<br>
</font><font size=1 color=blue face="Arial"><u><br>
</u></font><a href="www.schneider-electric.com/solar"><img src=cid:_2_089E819C089E7DF4006C2DE988257BFA></a><font size=1 color=#00a000 face="Arial"><br>
*** Please consider the environment before printing this e-mail</font><font size=1 face="Arial">
</font><font size=3><br>
</font>
<br>
<br>
<br>
<table width=100%>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">From:</font>
<td><font size=1 face="sans-serif">Brian Mehalic <brian@solarenergy.org></font>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">To:</font>
<td><font size=1 face="sans-serif">RE-wrenches <re-wrenches@lists.re-wrenches.org></font>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">Date:</font>
<td><font size=1 face="sans-serif">10/04/2013 12:04 PM</font>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">Subject:</font>
<td><font size=1 face="sans-serif">[RE-wrenches] Trace SWs in Energy Management
Mode</font>
<tr valign=top>
<td><font size=1 color=#5f5f5f face="sans-serif">Sent by:</font>
<td><font size=1 face="sans-serif">re-wrenches-bounces@lists.re-wrenches.org</font></table>
<br>
<hr noshade>
<br>
<br>
<br><font size=3>Have a friend that is on an electric co-op where peak
$/kWh is 4x the off-peak rate.  Peak hours are 6-10 am in the winter
and 12-6 pm in the summer.</font>
<br>
<br><font size=3>He has relocated an older system from his previous house
to his new one; circuits were separated out to sub-panel that is connected
to the inverter AC output.  The reinstallation is very professional.</font>
<br>
<br><font size=3>Two Trace SW4024 in series (04/96)</font>
<br><font size=3>120/240 Vac Grid connected to AC1 of each inverter</font>
<br><font size=3>575 Ah battery bank</font>
<br><font size=3>Two C40s with digital displays, ~ 4.5 kW STC array total</font>
<br><font size=3>Trimetric</font>
<br>
<br><font size=3>The goal is to not use any utility energy during peak
times, unless the low battery voltage setting is reached, and in general
to run as an off-grid system, minimizing charge time from the grid during
off-peak hours as well.  The assumption (I know it's a tough one,
but I'm coming in after the transition) is that the PV array should at
least be able to provide the bulk of the load; using the grid to charge
the batteries to ensure they are regularly filled and to maximize their
life expectancy.  The customer is also managing loads actively.</font>
<br>
<br><font size=3>It's been a few years, but I used to work on these all
the time; however it was usually off-grid with a genset, or fixing poorly
maintained Y2K systems which were always in float. I'm attempting to use
the energy management mode.</font>
<br>
<br><font size=3>Inverter settings:</font>
<br><font size=3>Clocks: Time is accurate</font>
<br><font size=3>Grid AC1 amps AC: 60</font>
<br><font size=3>Max charge amps AC: 10 (each inverter)</font>
<br>
<br><font size=3>Grid usage: FLT</font>
<br><font size=3>Set start charge time: 23:00</font>
<br><font size=3>Start bulk time: 23:10</font>
<br><font size=3>Set end charge time: 05:00</font>
<br><font size=3>Set float volts DC: 25.4</font>
<br><font size=3>Bulk volts DC: 28.8</font>
<br><font size=3>Absorb time: 1.5 hours</font>
<br><font size=3>Low battery cut-out: 22 </font>
<br><font size=3>Low battery cut-in: 25.4</font>
<br>
<br><font size=3>Okay, programmed the system, both inverters are inverting,
AC1 is blinking green, looks good.  Then a well pump kicks on, registers
70 A DC on the Trimetric.  This causes inverter 1 to go into bulk
charging and pass through about 10 additional amps from the grid to the
load (inverter 2 continued to inverter about 10 amps for the load).  Inverter
1 soon cycled into float, then went back to what invertering (amber light)
and green blinking AC1 (which is what I want it to be at).  </font>
<br>
<br><font size=3>Had to leave, both the customer and I had other obligations.</font>
<br>
<br><font size=3>He took a picture of the inverter sat 11:15 pm, and they
were in bulk, battery voltage rising...exactly as planned.  But then
in the next set of pictures, taken at 7 am, after the end of the charge
time, they were in float, not inverting, even though, based on the Trimetric
readings at 11 (64%, 85A charging), and the fact that charging would have
been active all night, they were not in anyway at a low voltage condition
(Trimetric readings am readings were 85%, trickle charge, 25.6 V).</font>
<br>
<br><font size=3>Something seems amiss.  Any suggestions or insight?</font>
<br>
<br><font size=3>Thanks!</font>
<br>
<br><font size=3>Brian Mehalic <br>
NABCEP Certified Solar PV Installation Professionalâ„¢ R031508-59</font>
<br><font size=3>IREC ISPQ Certified Affiliated Instructor/PV US-0132</font>
<br>
<br><font size=3>PV Curriculum Developer and Instructor</font>
<br><font size=3>Solar Energy International</font><font size=3 color=blue><u><br>
</u></font><a href=http://www.solarenergy.org/ target=_blank><font size=3 color=blue><u>http://www.solarenergy.org</u></font></a>
<br><font size=3><br>
______________________________________________________________________<br>
This email has been scanned by the Symantec Email Security.cloud service.<br>
______________________________________________________________________</font><tt><font size=2>_______________________________________________<br>
List sponsored by Home Power magazine<br>
<br>
List Address: RE-wrenches@lists.re-wrenches.org<br>
<br>
Change email address & settings:<br>
</font></tt><a href="http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org"><tt><font size=2>http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org</font></tt></a><tt><font size=2><br>
<br>
List-Archive: </font></tt><a href="http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org"><tt><font size=2>http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org</font></tt></a><tt><font size=2><br>
<br>
List rules & etiquette:<br>
</font></tt><a href="www.re-wrenches.org/etiquette.htm"><tt><font size=2>www.re-wrenches.org/etiquette.htm</font></tt></a><tt><font size=2><br>
<br>
Check out participant bios:<br>
</font></tt><a href="www.members.re-wrenches.org"><tt><font size=2>www.members.re-wrenches.org</font></tt></a><tt><font size=2><br>
<br>
</font></tt>
<br>
<br>